1、精选资料武汉市12万m3/d污水处理厂工艺设计(AB法)目 录设计总说明IGeneral Design IntroductionVI1前言11.1设计背景21.1.1污水国内外排放、处理现状21.1.2 武汉市背景资料31.1.3 设计资料31.2 污水厂的设计原则51.3 设计方案论证61.3.1 污水特征61.3.2 处理工艺的比较61.3.3 处理工艺的确定81.3.4 工艺流程92污水处理系统设计计算102.1格栅102.1.1一般说明102.1.2主要设计参数102.1.3工艺尺寸112.1.4水头损失132.1.5渣量计算132.2污水提升泵房设计132.2.1提升泵站的设计说明及
2、原则132.2.2泵房型式及工艺布置142.2.3泵房设计计算142.2.4泵位及安装162.3曝气沉砂池162.3.1一般说明162.3.2设计参数172.3.3沉砂池尺寸172.3.4沉砂量及排砂设备182.3.5曝气系统192.4 A段曝气池和B段曝气池工艺设计202.4.1一般说明202.4.2已知条件212.4.3设计计算212.5 A段中沉池312.5.1设计说明312.5.2设计参数312.5.3设计计算322.5.4 中沉池设计草图352.6 B段终沉池 (二沉池)352.6.1设计说明352.6.2设计参数352.6.3设计计算362.6.4二沉池设计草图392.7接触消毒池
3、392.7.1设计说明392.7.2设计参数402.7.3设计计算402.7.4接触消毒池设计草图412.8计量设备412.8.1设计说明412.8.2设计参数及要求412.8.3设计计算423污泥处理系统设计计算443.1污泥泵房设计443.1.1设计说明443.1.2回流污泥泵房443.1.3剩余污泥泵房443.1.4集泥池443.2污泥浓缩池设计计算453.2.1设计说明453.2.2设计参数453.2.3设计计算463.2.4浓缩池草图473.3污泥消化系统设计计算473.3.1设计说明473.3.2设计参数483.3.3设计计算483.3.4消化池草图523.4贮泥池设计计算523.
4、4.1设计说明523.4.2设计计算523.5脱水机房533.5.1设计说明533.5.2设计计算544污水处理厂总体布置554.1平面布置554.1.1平面布置概述554.1.2工艺流程布置574.1.3建筑物平面布置574.1.4污水处理厂管线布置574.1.5厂区绿化及预留空地584.2高程布置584.2.1高程布置概述584.2.2污水高程布置计算594.2.3污泥管道高程布置计算665经济技术可行性分析716环境影响评价726.1施工过程中对环境的影响及对策726.1.1 生态影响分析726.1.2 施工扬尘的环境影响分析726.1.3 施工噪声的环境影响分析746.1.4 施工排水
5、、及建筑垃圾的环境影响分析756.2项目建成后的环境影响及对策76参考文献78致谢79可修改编辑设计总说明我国幅员辽阔,各地气候不同,经济发展水平差异也很大。目前,各城市都面临着不同的水环境污染。因此,根据城市规模,建立一套与自己经济发展相适应的控制污染、保护水环境的方针、政策、标准和法规,同时建设与经济发展水平相适应的污水处理厂,就成为防止因水资源短缺而制约城市社会经济发展的必要手段。利用有限资源的必须部分。在人们日常生活中,盥洗、淋浴、生活洗涤等都离不开水,用后便成为污水。在工业企业中,几乎没有一种工业水是人们日常生活中不可或缺的宝贵资源。水的供给与排放处理水也是不合理的。水经生产过程使用
6、后,绝大部分变成废水。生产废水携带着大量污染物质,这些物质多数是有害和有毒的,但也是有用的。必须妥善处理或加以回收利用。I 设计题目武汉市12万m3/d污水处理厂工艺设计(AB法)II 设计内容及原则II.I 设计内容污水处理厂工艺设计流程设计说明一般包括以下内容: (1)据城市或企业的总体规划或现状与设计方案选择处理厂厂址; (2)处理厂工艺流程设计说明; (3)处理构筑物型式选型说明; (4)处理构筑物或设施的设计计算; (5)主要辅助构筑物设计计算; (6)主要设备设计计算选择; (7)污水厂总体布置(平面或竖向)及厂区道路、绿化和管线综合布置; (8)处理构筑物、主要辅助构筑物、非标设
7、备设计图绘制; (9)编制主要设备材料表。II.II 设计原则考虑城市经济发展及当地现有条件,确定方案时考虑以下原则: (1)要符合适用的要求。首先确保污水厂处理后达到排放标准。考虑现实的技术和经济条件,以及当地的具体情况(如施工条件),在可能的基础上,选择的处理工艺流程、构(建)筑物型式、主要设备、设计标准和数据等,应最大限度地满足污水厂功能的实现,使处理后污水符合水质要求。 (2)污水厂设计采用的各项设计参数必须可靠。 (3)污水处理厂设计必须符合经济的要求。设计完成后,总体布置、单体设计及药剂选用等要尽可能采取合理措施降低工程造价和运行管理费用。 (4)污水处理厂设计应当力求技术合理。在
8、经济合理的原则下,必须根据需要,尽可能采用先进的工艺、机械和自控技术,但要确保安全可靠。 (5)污水厂设计必须注意近远期的结合,不宜分期建设的部分,如配水井、泵房及加药间等,其土建部分应一次建成;在无远期规划的情况下,设计时应为以后的发展留有挖潜和扩建的条件。 (6)污水厂设计必须考虑安全运行的条件,如适当设置分流设施、超越管线等。III 设计背景资料III.I 武汉市污水处理厂基本资料 武汉市基本概况:本设计是武汉市排水工程设计。武汉位于中国腹地中心、长江与汉江交汇处、江汉平原东部,因武昌、汉口、汉阳三地合称而得名,地理位置介于东经1134111505,北纬29583122,是中部六省唯一的
9、副省级城市,也是国务院批准的中部地区中心城市。以城市常住人口、GDP总量、建成区面积等指标来说,武汉均为中部第一、全国前十的特大城市。世界第三大河长江及其最大支流汉江横贯市区,将武汉一分为三,形成武昌、汉口、汉阳跨江鼎立的格局。武汉也是世界各大城市中人均拥有水量最多的城市。虽然武汉水量充足,但随着城市的发展,用水量与日俱增,污染日益严重,为了保护祖国主要水系长江水系的水质状况,有必要在武汉建设污水处理厂处理生活污水和工业废水,处理达标后再排放到受纳水体,避免水质恶化。III.II 武汉市气候环境概况 (1)风向主导风向:东北风。 (2)气温属亚热带湿润性东南季风气候区。具有冬寒夏暖、春湿秋旱、
10、夏季多雨、冬季少雪、四季分明的特征。年平均气温为16.7,7月平均气温高达28.9,1月仅3.5。夏季气温高,35以上气温天数为40天左右,极端最高气温41.3,极端最低气温-18.1,武汉日均温10持续期达235天,年平均无霜期240天。年平均降水量1284.0mm,降雨集中在49月,年平均蒸发量为1391.7mm,绝对湿度年平均16.4毫巴,年平均相对湿度75.7。 (3)地质条件 地势为东高西低,南高北低,中间被长江、汉江呈Y字型切割成三块,谓之武汉三镇。武汉市平均海拔为23.3米,最高海拔为873米,最低海拔为11.3米。最大冻土层为0米。厂区占地约56万平方米,临近汉江,地势较平坦,
11、高差可忽略,整体上为长方形,长约800米,宽约700米。III.III 处理规模本设计污水处理厂设计总规模为120000m3/d,变化系数取为1.3。污水厂的处理水量按最高日最高时流量设计,一次设计,分两期实施。III.IV 进、出水水质武汉市污水处理厂污水进水水质及污水处理后的出水水质如下表: 表1 武汉污水处理厂水质情况项目COD(mg/L)BOD5(mg/L)NH4-N(mg/L)SS(mg/L)TP(mg/L)PH进水水质3003002022027.4出水水质60208(15)20169IV 污水处理工艺根据国内外已运行的中、小型污水处理厂的调查,要达到确定的治理目标并经济合理,本设计
12、可采用“AB工艺”设计工艺流程图如下图1: 鼓风机房出水 消毒池生活 格 提升 曝 气 A 段 中 B 段 终 污水 栅 泵房 沉砂池 曝气池 沉池 曝气池 沉池 A 段 B 段污泥泵房 污泥泵房 沼气利用污泥 污泥 贮 污泥 污泥外运 脱水机 泥池 消化池 浓缩池 图1 工艺流程图V 设计结果本工程处理构筑物包括格栅间及提升泵房、曝气沉砂池、A段曝气池、中沉池、B段曝气池、二沉池、接触消毒池、污泥浓缩池等;附属构筑物包括鼓风机房、加氯间、污泥脱水机房以及综合办公楼、机修间、仓库等。主要构筑物设计结果见下表2: 表2 主要处理构筑物一览表序号构筑物名称数量(/座、格)尺寸(m)1提升泵房112
13、.06.02曝气沉砂池218.03.03A段曝气池442.07.744中沉池2D=45.55B段曝气池848.58.06二沉池4D=417接触池13527.58污泥泵房212.06.09浓缩池1D=3410消化池2D=3511贮泥池1D=13.312鼓风机房120.010.0General Design IntroductionChina has a vast territory,different climate,and the level of economic development is also a great difference.Currently,cities are face
14、d with different water pollution.Thus,according to the size of the cities to establish a set of economic development and their adaptation to control water pollution,protection of water environment policy, standards and regulations,at the same time,building and the level of economic development of th
15、e sewage treatment plant,has become to prevent shortage of water resources and constraints of urban socioeconomic development of he necessary means.So people have to use the part of the limited resources.In peoples daily life,toilet,shower and washing all of life can not be separated from water,with
16、 sewage.In industrial enterprises,almost no industrial water is essential to daily life precious resources.Water supply and discharge treaded water is not reasonable to the water.Water used by the production process,and the vast majority of wastewater is produced.Carrying a large quantity of wastewa
17、ter pollutants,most of these substances are harmful and toxic,but it is also useful.So they have to be properly handled or recycled.I Design TitleWuhan District,Hubei,sewage treatment plant process design(AB process)II Design content and principlesII.I Design contentSewage treatment plant process de
18、sign that generally includes the following:(1) According to the city or business or the status of the overall planning and design of programs to choose treatment plant site;(2) The process design explanation of treatment plants;(3) The explanation of treatment structure type and selection;(4) The de
19、sign calculation of the treatment structures or facilities;(5) Design calculation and selection of the main equipment;(6) The overall layout of wastewater treatment plant (flat or vertical) and plant roads,afforestation and integrated arrangement of pipelines;(7) The design drawing of the treatment
20、structures,the main supporting structures and the Non-standard equipment;(8) The preparation of major equipment and materials table;II.II Design principles Consider the citys economic development and local existing conditions,determinethe program to take into account the following principles:(1)to c
21、omply with applicable requirements.First of all,to ensure that the sewage treatment plant to meet emission standards.Consider the realities of the technical and economic conditions,as well as the specific local situation(such as the construction of the conditions),where possible,based on the treatme
22、nt of choice of process,structure(building)the building type,major equipment,design standards and data should be the largest Wastewater Treatment Plant to meet the limits of realization of functions,so that the water quality of treated effluent in line with the requirements.(2)wastewater treatment p
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 某市 m3d 污水处理 工艺 设计 AB
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【可****】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【可****】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。