1、外文文献Multi-rope friction hoist rope for new technologyMulti-rope friction hoist wire rope replacement, it is usually the use of four fixed steady string of new cars of old rope, process complexity, construction personnel and VI in the well shaft operations, the risk of larger and longer mine producti
2、on, So how to replace the main wire rope hoist such more security, time-saving, has been the goal of research 1、 Construction of preparation (1) in advance of the wedge-shaped hanging backup detection device on the new wire rope testing, in line with the Coal Mine Safety Regulations section of the r
3、elevant provisions of 402, the measurement of size, were cut into four entangled in rope roller 4 on, according to the requirements of twist put on the north side of the derrick, and fixed. (2) North derrick hook in the appropriate location of the fixed beam-oriented round of four in order to smooth
4、 movement of wire rope. (3) Automatic adjustment of leveling out the volume of the fuel tank of a lever, the first self-balancing so that the fuel tank of the South Hook extended the amount of leverage in line with the closure of the South Hook Balancing tanks at their respective cut-off valve, run
5、1 day, then the volume of check the fuel tank between the two hook lever out of the volume, and record, and as the basis for cut-off rope. (4)ready to use long and short board, long board needs three, the need for a short eight boards. (5) ready to adequate and reliable lighting facilities, as well
6、as the signal, wire, wood, and commonly used tools such as I-steel, and check their eligibility. 2、 Construction of steps (1) top-down clean-up platforms, derrick and the shaft, removal of roller shield. VI well above the old string with new string, specific methods are as follows: Cans will be park
7、ed in the south tank top level VI and the location of wells; VI in wells adjacent to the north can take the work platform, the new rope through the window well wall Tabei VI and four driven wheels, and four cans of the old North ropes long, respectively, 3m, slightly smallbundled, tied for the new D
8、epartment3 (new ropein the old side). Specific binding is as follows: first one 3m long hemp rope around 1m intensive new rope, hemp rope and then the remaining entangled in the original location of the new justice will be the new and old ropes tied together, the hemp rope tied after water immersion
9、 ( tied up a little wet before the small). At the same time, decentralization of the South can take the new string, using the same method with the above-mentioned firstsince the beginning of each new interval 10m rope firmly tied up with the old rope, wire rope when the new tankto the South side, an
10、d well above the first VI flush steel stops, can work to dismantle the North wellhead platform. in the four-storey tower platform wells, using a dedicated card in the North side of the tank 4prison in order to prevent the new rope to escape, and then cut off all of the hemp rope tied to the new and
11、the old rope rope separately. five-storey tower in the wells, the South side of the new cans with rope sling jail card board, with four new road will be the appropriate height of lifting rope to the main drive roller can not rotate a new justice prevail, then the human will be fourto the second floo
12、r of the new platform. (2) the South can head the new wire rope hook. the South Side can4 wedge-shaped with four back-up devices to connect firmly hanging; to the old and new wire rope hanging device of the alignment, the use of hemp rope tied firmly. the second floor on the first pressure hydraulic
13、 pump with the South can automatically balance the fuel tank connecting pipe even after the good, the total cut-off to open the door a little to the fuel tank of the oil pump to suppress all Add, and then south automatic hydraulic hook Unicom balance tube to remove the fuel tank and on a designated
14、location. Finally, the slow decentralization of the Southern cage hook, a new extra rope taut. (3) shaft with a new rope. long sling to remove five boards and four sub-board anti-back channeling, and four new chairs were placed on the corresponding slot on the west side of the old rope suitable loca
15、tion. Three-storey tower in the well platform, the South side of the new cans, the old rope a long board with a daughter card to pay in jail, and then in the long upper and lower sub-board 4 of the card to pay a small board. hoist speed with low-frequency southern decentralization cans, at the same
16、time, four ropes to the corresponding roller speed put to justice; At this point, three-tiered platform in the wells south tower tank side, since the first sub-board pay long bundled together from every 6m hemp rope (the same method mentioned above) and timely water immersion, respectively, at inter
17、vals of 50m to pay a small four-card sub board.When the second floor of the North can wellhead platform close to parking, with the end of rope. (4) the replacement of the South four wedge-shaped cage hook hanging device. Well first of all in the four-storey tower, the south and east-west direction o
18、f wire rope hook emission No. 2 2o I-beam, four in its placeabove, and the South Hookold jail 4. by the shearer two 20t chain hoist with hook cage will Northern; 1ot with two hoist, lifting cans Southern appropriate height, the replacement of the eastern side of the first two hanging devices, specif
19、ic methods are: using 12.5mm rope hoist It would be cap and hydraulic telescopic self-balancing devicebody, followed by removal of the eastern side of the two wedge-shaped hanging type linked to the original device. Then, the first installation of the new East from the second wedge-shaped only hangi
20、ng device, and then install the East from the first wedge-shaped hanging new home. replacement of the west side of the two wedge-shaped hanging device, the replacement of finished hemp rope to use old and new wire rope hanging device firmly bundled counterpart. (5) in the second floor of the new wir
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 摩擦 提升 机换绳 新工艺 中英文 翻译
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【丰****】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【丰****】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。