采矿工程专业英语词汇册.doc
《采矿工程专业英语词汇册.doc》由会员分享,可在线阅读,更多相关《采矿工程专业英语词汇册.doc(24页珍藏版)》请在咨信网上搜索。
1、采矿工程专业英语词汇手册(Glossary of Special English in Mining Engineering )采矿工程专业内部讲义三月ContentChapter 3 .1 Mining method.2Chapter 3.2 Mine preplanning.3Chapter3.3 Mine development.4Chapter 4.1 Wall mining introduction5Chapter 4.2 Ground control aspects . 6Chapter 4.3 Roof support system .7Chapter 4.4 Longwall
2、coal-getting machine8Chapter 4.5 Convey system.8Chapter 4.6 Mine Vetilation.10Chapter 5 Pillaring system.11Chapter 6 Roadway excavation and support.12Chapter 7 Novel methods of mining.16Chapter 3 .1 Mining methodmining method 采矿方法;mining operation 采矿作业; transportation 运送;ventilation 通风;ground contro
3、l 顶板管理;the cost of per ton of coal 吨煤成本;recovery 回采率;subside v. subsidence n.地表沉陷;subsidence control 地表沉陷控制cover 覆盖层;overburden 上覆地层;immediate roof 直接顶;floor 底板;dip (Pitch) 倾角;hardness 硬度;strength 强度;cleavage 解理; gas,methane 瓦斯daily operation 平常工作single operation 单一工序 unit operation 单元作业auxiliary op
4、eration辅助作业cutting n. 切割,掏槽;blasting n. 爆破loading n. 装煤haul v. 运送,搬运drainage n.排水power n. 动力 power Supply 动力供应communication n. 通讯lighting n.照明。disruption in production 停产;reduction in production 减产;compromise 折衷room and pillar 房柱式by far 到目前为止in common with 和同样underground mining 井工开采outcrop 露头,露出地面的岩
5、层;crosscut 联络巷、石门;drift 平硐;entry 平巷;development stage 开拓阶段;production stage 生产阶段;face 工作面。continuous miner 连续采煤机;haulage capacity 运送能力;main entry 主巷。barrier pillar 隔离煤柱;butt entry 区段平巷;property line 矿井边界线。shearer 滚筒采煤机planer,Plow 刨煤机surface mining 露天开采auger mining 螺旋钻开采rapid excavation 快速掘进 hydrauli
6、c mining 水力采矿underground gasification 地下气化 ocean mining 海洋采矿Chapter 3 .2 Mine PreplanningHercules【希、罗神】赫尔克里斯, 大力神- Herculean, adj. 力气极大的;需要大力气的。herculean effort 巨大的努力inadequacy n.局限性,缺少。transportation facility 运送设备inflationary adj. 通货膨胀的,通货膨胀引起的-inflation n.胀大, 通货膨胀, (物价)暴涨-inflate v 膨胀,充气。inflation
7、ary process 通货膨胀过程drive up 抬高,提高 drive into 掘进到be faced with 面临monumental adj. 用以加强语气非常的, 极端的-monument n.纪念碑coal reserve 煤炭储量electromechanical adj. 机电的 electro(电子的)+mechanical(机械的)electromechanical mine operation 矿井机电作业staff v. 雇用,聘用season v 合用,适应coordinate n. 坐标。v. (使)互相配合,(使)协调, 调整。a multitude(n.
8、多数,多量) of 大量capital investment 基本建设投资。foremost 最重要的,最重要的,1Billion = 1,000,000,000 即10亿。Mt metric ton 公吨。453.5Mt = 500 million tons 0.907Mt = 1 million tonput into operation 投产,投入使用raise 筹集the life of the property 矿产/井的使用年限。commercial value 市场价值,商业价值。for convenience 为了方便其见minability 可采性marketability
9、适销性,可销性coal reserve 煤矿nominal,名义上的,极小的。option 买卖选择权,优先购买权enter upon 开始preliminary examination 初步调查operating mine 生产矿井to the extent that 达成这种限度以致. ;就.来说;在.方面来说;adjacent to 邻近的surface topography 地面地形,表面地形coalfield 煤田measure 层组coal-bearing measure含煤地层feature 特性;地貌。structural feature 构造特性surface improve
10、ment 地面上的改造tilled area 耕地reservoir 水库power line 电力线,输电线reservation n.保存地;自然保护区on record n.留有记录的,记录在案的preferred 优先 选用的,首选的traverse 导线。traverse with compass 罗盘定位。system surveying 系统测量sampling 采样have a bearing on 对有影响,与.有关available 有效的,可用的pricing schedule 定价方案preparation treatment 洗选加工selective adj.有选择
11、性的,选择的a master plan of operation 总体生产计划。serve as 用作,作为,起到作用。basis 基础,根据,依据since 引导因素状语从句justify 调整,证明,证明是对的的,prospecting 勘探drilling pattern 钻孔布置,钻孔图式basic map 底图,基本地图log sheet 钻孔柱状图tabular adj. =tabletabular record 表格记录operating management经营管理部门,经营管理life expectancy 预期使用年限,使用寿命delivery of supplies 材料
12、供应estimate of the cost 成本估计sales department 销售部Chapter 3.3 Mine developmentportal 井筒expected life of the mine 矿井的设计使用年限rail haulage 轨道运送as well as 即又be of n. 具有(性质)drift 平硐shaft 立井,竖井slope 斜井main shaft主立井auxiliary shaft 副立井air shaft风井transfer house 中转煤仓headframe 井架hoist house 提高机房,绞车房skip 箕斗cage 罐笼c
13、ar dump 卸煤设备storage bin 井底煤仓deplete 耗尽、衰竭whetheror是还是pressure drop 压降net effect 净效应,有效效应,实际结果capital cost 基建费用Chapter 4.1 Walling system introductionworking face 工作面coalface:采煤工作面interconnection:切眼panel entry:区段平巷gate entry:工作面顺槽head gate:区段皮带巷,运送巷tail gate:区段轨道巷,回风巷headentry:工作面运送巷(下顺槽)tailentry:工作
14、面回风巷(上顺槽)bleeder entry:区段回风巷cross-cut:联络巷gob, goaf:采空区end:端头Longwall mining 长壁采矿法Shortwall mining 短壁采矿法pillar system. 柱式系统longwall mining on strike 走向长壁采煤方法mining in advance / wall advancing mining 前进式采煤方法mining in retreat / wall retreating mining 后退式采煤方法inclined longwall mining 倾斜长壁开采underhand mini
15、ng 俯采overhand mining 仰采Coal mining machine, coal-getting machine 采煤机; Shearer,滚筒采煤机 Plow,planer 刨煤机Face conveyor 工作面运送机 Pan line,”溜子” Chain conveyor 链式运送机 Scraper chain conveyor 刮板输送机 Armored chain conveyor 铠装运送机Roof support system:顶板支护系统 Friction props:摩擦支柱 Friction metal props:摩擦支柱 Hydraulic prop:
16、液压支柱 Single/Individual hydraulic prop 单体液压支柱Hydraulic powered self-advanced support:液压自移式支架roof support 顶板支架stage loader:转载机panel belt conveyor 区段皮带运送机electrical control 电力控制装置/设备hydraulic pump 液压泵站blast mining technology 爆破采煤工艺conventionally mechanized mining technology 普通机械化采煤fully mechanized mini
17、ng technology 综合机械化采煤fully mechanized mining with sublevel caving technology 综采放顶煤方法Chapter 4.2 Ground control 工作面周边地层:Overlying strata 上覆地层:Main roof 老顶,基本顶Immediate roof 直接顶Gob采空区-Facerib(煤壁)Floor 底板Underlying strata下伏地层Ground control顶板解决方式:(1)Caving;(2)Pack。Stable 切口,机窝dead work 准备工作,非生产性工作。Mobil
18、e belt conveyor 可移式胶带运送机No exception 无一例外regular maintenance n.平常修理,定期检修Downtime 停工期(由于损坏、修理等因素导致的停机时间),停工时间,停机时间Clearance 空隙Immediate area of the face:工作面的直接区域Rib line 煤壁线,腰线heading 掘进头,平巷up to dip 沿倾斜上行Compression strength 压缩强度Underlying strata 下伏地层bed separation 离层On strike 沿走向Rad radian,弧度Cleat
19、解理Hold true 有效,合用Half butt cutting 半垂直切割Angle of attack 冲角virgin conditions 原始条件;Harder roof strataSofter coal seamuniformly distributed stress,the overburden weightHarder floor stratainduced by mining 采动引起的Stress distribution 应力分布Deflect 偏斜,偏转,挠曲,下垂Cave in 冒顶,垮落Front abutment pressure 前方支承压力Side ab
20、utment pressure 侧向支承压力Rear abutment pressure 后方支承压力前方支承压力:分布范围:150m first felt/occur出现,有反映,有感应;4560m pick up slightly略有增长,略有加速;1521m increase rapidly迅速增长;1.5-5m支承压力峰值 peak abutment pressuremagnitude of the peak abutment pressure峰值大小:1.5-5 overburdern weight后方压力:vertical pressureface area:far below t
21、he cover loadgob area:gradually increaseat last:the cover load范围:0.3-0.4 the overburden thickness.No abutment pressureSide abutmentFirst felt:At the same time as the front abutment pressure范围:from the rib to 1/3 or 1/4 hlargest at the ribside, decrease exponentially with distance from ribposition of
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 采矿工程 专业 英语词汇
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【精***】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【精***】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。