工程管理中英文外文翻译.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 工程 管理 中英文 外文 翻译
- 资源描述:
-
本科生毕业设计(论文)外文翻译 题 目 建设项目管理——价值工程 姓 名 学 号 学 院 管理科学与工程学院 专 业 工程管理 指导教师 Construction Project Management——Value Engineering By:Fredrick E.Gould.Nancy.E.Joyce ABSTRACT Value engineering is a kind of in the world proved very fruitful way of project management. In our country, with the improvement of socialist market economy, value engineering, whether in theoretical research or practical application aspects, obtained greater progress, and is gradually applied to engineering project management Due to the construction of the project design stage investment is less, the owners of ignored this phase of the application of value engineering, but the practice proof, design phase is the possibility of managing investment the biggest stage. Therefore, this paper based on the design stage of a construction project, study the application value engineering. Key Words: construction project; value engineering; design stage Value engineering and cost reduction are often confused, so that the value engineering in the designer had a bad reputation, however, it is important that val engineering is a process, is to consider the cost of other factors, such as: life c quality, durability and maintainability. On the other hand, reduce cost, think only reduced. At the same time they are in rely on a given standard role, we consider in larger context of the standard, while the other reaction activity is only for budget problem. The project team should be very clear in their processes are involved in. Despite the tight budget reduces life cost, the owners need to know exactly what he she buys. Value engineering in the process, should the owner to another system reference to buy items or equivalent value system to reduce the cost. In reducing co in order to save money, he or she is of little value or range less. Value engineering is all designed products in the active part. Value engineering not done enough time, reduce cost becomes necessary. Value engineering provides a" better reduction mode", and reduce the cost can be reduced by engineering quality o quantity, save money. Value engineering is not limited to the construction industry, but in the busine world to help analysis is to minimize the cost of the optimal value of object technology and products. The best value is not an intrinsic property of. For each project, it takes on a different meaning, often in other similar product comparison the construction which is comparable to many products, it is a complicated job. Therefore, value engineering is as one of the best team in good operation. Value engineering is one of the reasons for negative take designers sometimes feel, architecture is a measure of their work and suggestions, damage the item aesthetic quality. In the process if the designer is an equal partner, this feeling will be re At the same time, the owners need to fully understand the design ideas to make the choice, when the time came, to a specific recommendations for proper balance, to accept or reject. Owners of professional designers and construction with the help of setting standards. In general, these standards are divided into several categories: best cost best optimal function and aesthetic value. Determining the optimal cost for life cy cost analysis to the building, using the most effective play a role definition. The aesthetic value, can be difficult to determine, but as with other important criteri an important emergency generator case, the team focused on cost and function, but they do not concern for aesthetic values, because the generator will be hidden fro view. It takes the first consider the cost, durability, and reliability. Its role w accordance with safety requirements and the buildings within the residents needs t decide. In a curtain wall system, the owners pay attention to the cost, function and aesthetic value. Because the system will be the main architectural image, aesthetic value may cost more than the weight, exceeding even function. These are only the owner can decide to make the final. Including value engineering, all items are redundant. After all, is not a design team to put together the best solution, it finds the optimal solution will satisfy the owner's cost, functional, aesthetic standards. Of course, a good design team is doi However, every design company established culture also needs to be questioned standard practice. In the value engineering in the process, he could do it. In addi some teams may be dealt with as soon as possible in the design of the case. For example, the owner should accelerate the job to get the project started constructi Its purpose is to return to the previous fact and is not easy to make a decision be the state. Value engineering to ensure that such errors do not occur. Another possibility is that, the owners have vision, but does not fully explain to the desi Designer response more complexity, to meet the needs of the owners. Value engineering process, this complexity will be questioned and clarification. Building professionals in their occupation career into contact with many design company. Specific design company may not know they brought other products and processes form information. In value engineering, these ideas will be checked, and where appropriate, set down. Building professionals can easily acquire about certai product availability information. If a product needs a very long distance transport, which can increase the cost of. Maybe there are local products, can also achieve t same standard. Although the value engineering in the project construction and even in the construction industry as a whole is pale, the maximum value is obtained in the earli process: from one system to another, in the schedule have hardly any effect, and th amount of redesign and redraw is minimized. However, in the early stages of design, to produce any saving document is one of the most difficult, because there are usual no formal drawings or plan. The most recognizableffects occur in the schematic diagram of the final and the design and development stage of early. There is enough information on the idea of rational judgment system. Of course, most of these saving can be achieved. In construction drawing, macroscopical idea is already in place, an most of the ideas embodied in the file details. During the construction process, value engineering efforts continue. Because making changes to the project, design development should follow in the design phase to assess changes in the procedure. Contractors can also in the field of applicatio value engineering principle, save money method, equipment or sequence of operations. Who achieve these fields generated by saving depends on the form of contract. Some value engineering operation is informal, though the team members in favor of the arrangements and procedures, the others follow a more formal by another person established standards, the following is a good value engineering project is main component of: (1) Review the field identification. He could be performed separately, as each team member critically reviews the design drawings and specifications. The idea was conceived, concern in the design field in this period of time, can use new product or process, material the use of different strengths, simplify the system to processing details. (2) Brain storm team members sitting together with idea list and tossing ideas l others to accept, the idea is to get as many ideas as possible on the desktop. As discussed in the context of members should be thought from the others and many have special ideas inspired. (3) Each of the proposed analysis. The Group determines the standards to evaluate each idea. Discussion of alternatives in the brainstorming sessions with standard test. Here the brainstorming session, costs are usually not considered first. Once a proposal in the functional requirements based on the merits, and then calculat the cost, involves a considerable amount of time and energy. It is a keeping brainstorming focus on functional outcome and reduce costs. (4) Report to management. The team will be all the idea of putting it all togethWhen presented with more and more information is available, some may be in other phases of the project carried out a detailed analysis. Some have been team provides rationale for rejected, some instant recommendation. All the topics for discussion, whether to reject or approve, should keep some for later reference. When the cost of computing work begins, the team can have a look simple first cost, but also can view the life cycle cost proposal. If the proposal in first cost basis of sound words, life cycle cost, may not be complete, but the danger is, first may not be incorporated into the overall savings work during the life of structures Therefore, it is best to consider the life cycle cost, figure 6.5 shows the first c life cycle cost differences between. Life cycle cost in building or construction system in the initial study life, operation and maintenance costs, and future interests. Prior to this analysis can be applied, assumptions are made about the under construction quality expectations, limitations of the procedure, as well as prospective predictors of cost of capital. cycle cost can help the design team decided to set system design, site, materials u in construction, and the investment of money. It can be used to build or rebuild pr In the project, the first problem is, whether the buildings were removed or retained you have decided to keep the building, the next question is how to scale renovation meet expectations. These analyses can go through a life cycle cost analysis. The goal is to find, give some to meet the needs of customers alternatives, whic cost at least over the life of the building. For example, a specific non traditional heating system can have a higher cost base. Basic cost includes direct related desi procurement costs, as well as system installation. However, such a system might be a longer life expectancy than traditional systems, can burn the fuel more efficiently, may not require so much of the repair, and can use the cheap fuel source. 建设项目管理——价值工程 Fredrick E.Gould.Nancy.E.Joyce 摘要 价值工程是一个在世界各国被证实卓有成效工程管理方法。在我国,伴随社会主义市场经济不停完善,价值工程不论在理论研究还是实际应用方面,都取得了较大发展,而且正在逐步地利用到工程项目管理工作中。因为建设项目设计阶段投资较少,业主往往轻易忽略这一阶段价值工程应用,但实践证实,设计阶段是节约投资可能性最大阶段。所以,本文立足于建设项目设计阶段,研究价值工程应用。 关键词:建设项目;价值工程;设计阶段 价值工程和降低成本经常搞混同,这么就使价值工程在设计者中留下了不好名声,不过,主要是价值工程是一个过程,是考虑成本其余原因方面,比如:生命周期成本,质量,耐用性和可维护性。另首先,降低成本,认为只有降低意思。同时他们都是在依靠于某种给定标准而起作用,我们考虑在更大范围内标准,而其余反应活动仅是为了预算问题。项目团体应该非常清楚他们在过程中都参加了。尽管担心预算降低了现实生活成本,业主需要确切地知道他或她所购置。价值工程过程中,业主应以另一个系统参考购置物品或同等价值体系来降低成本.在降低成本中,他或她为了省钱所得到价值不大或范围更少。 价值工程应是全部设计产品中活跃一部分。价值工程做得并不充分时候,降低成本就变得必要了。价值工程提供了一个“愈加好降低方式”,而降低成本可降低工程质量或数量,节约资金。 价值工程不但限于建筑行业,但在整个商业界用来帮助分析得到以最小成本最好值对象工艺和产品。最好值不是一个固有财产。对于每一个项目,它需要在不一样意义,往往是在其余类似产品之间比较。在建设中这是比较很多产品,这么是很复杂一项工作。所以,价值工程是作为一个最好团体良好运作。价值工程消极采取原因之一是设计者有时会以为,建筑专业是衡量他们工作和提出提议,损害了该项目标审美质量。在过程中假如设计师是一个平等搭档,这种感觉会被降低。同时,业主需要充分了解一定设计理念使其选择,当初间一到,以一个详细提议理由是适当权衡,接收或拒绝。 业主在设计师和专业施工帮助下设置标准。通常来说,这些标准分为几类:最好成本,最好功效和最好审美价值。确定最好成本能够用生命周期成本分析,以建筑物使用最有效发挥作用定义。最好审美价值,是有点难以确定,但能够作为其余主要标准。作为主要一个应急发电机案,该团体着眼于成本和功效,但并不对审美价值关注,因为发电机将被隐藏在视野中。它花费首先考虑成本,耐久性,和可靠性。它作用将依照生命安全要求和建筑物内居民需要而决定。在一个幕墙系统情况下,业主重视于成本,功效和美学价值。因为系统将是首要建筑形象,审美价值可能比成本更有重量,甚至超出功效。这些是只有拥有者能够决定最终作出。 其中包含价值工程在内全部项目都看似多出。毕竟,不是设计团体放在一起最好方案,它认为最好处理方案将满足业主成本,功效,审美标准。当然,一个好设计团体正是这么做。然而,每一个设计企业已建立文化也是需要被质疑标准做法。在价值工程过程中,他能做到这一点。另外,一些团体可能尽快处理在设计情况下出现事情。比如,业主要加紧工作来获取项目开工建设。其目标是要回到以前事实和很不轻易重新作出决定之前状态。价值工程能确保这么过失不会发生。另一个可能是,业主有远见,但并不能充分地向设计师说明。设计师响应更多复杂性,来满足业主。价值工程过程中,这复杂性将受到质疑和澄清。 建筑专业人士在他们职业生涯中接触到许多设计企业。特定设计企业可能不知道他们带来其余产品和工艺表格信息。在价值工程中,这些观点想法会被检验,并在适当情况下,成立下来。建筑专业人士能够很轻易地获取关于一些产品可用性信息。假如一个产品需要很长距离运输,这便能够增加了其花费。可能有当地产品,也能够达成一样标准。 即使价值工程在整个项目建设甚至在整个建筑业显得苍白,最大价值取得是在较早过程:从一个系统转到另一个系统在时间表上几乎不会产生任何影响,以及大量重新设计和重绘会被最小化。然而,在设计早期阶段产生,产生任何节约形成文件是最困难,因为那里通常没有正式图纸或计划。最可分辨影响发生是在原理图最终和设计开发阶段早期。这里有足够信息对大系统想法产生合理地判断。当然,其中大部分节约能够实现。在施工图中,宏观想法已经到位,而且大多数产生想法表现在文件细节中。 在施工过程中,价值工程努力连续.因为进行更改项目,设计发展应该遵照在设计阶段评定改变了程序。承建商也能够在该领域程序申请价值工程原理,节约钱方法,设备或操作次序。谁实现这些领域产生节约取决于协议形式。 有些价值工程运作是非正式,尽管团体组员赞成安排和程序,其余人跟随愈加正式被另外人建立标准,下面是一个好价值工程方案主要组成部分: (1) 审查领域判定。他能够单独完成,因为每个团体组员严格审查设计图纸和规格。 想法被构想,在关注设计领域这段时间里,能够利用新产品或工艺,材料不一样使用优势,简化系统,或重新加工细节。 (2) 头脑风暴小组组员坐在一起以想法清单和折腾意见和想法让他人接收,这个想法是把尽可能多想法放在桌面上。因为讨论背景下组员应该从他人想法和许多想出特想法得到启发。 (3) 每个提议分析。小组确定了标准以评定每种想法。讨论供选方案在头脑风暴会议上以标准测试。这里头脑风暴会议,费用通常不是首先考虑。一旦某个提议在功效要求基础上有可取之处,然后计算成本时,会包括到相当数量时间和精力。它也是一个保持头脑风暴关注功效和降低成本结果。 (4) 汇报给管理人员。团体将全部想法全部放在一起。当提出越来越多信息是可用时候,一些可能会在项目标其余阶段进行详细分析。有已被团体要求理由拒绝了,有些即时推荐。全部讨论题目,不论是否拒绝或同意,应留一部分供以后参考。 当成本计算工作开始时,团体能够看看简单第一成本,也能够查看生命周期成本方面提议。假如该提议在第一成本基础上是健全话,生命周期成本,可能无法完成,但这么做危险是,第一成本可能无法纳入总体储蓄转化工作寿命期间结构。所以,最好是考虑一下生命周期方面任何成本,图6.5说明第一成本和生命周期成本之间差异。 生命周期成本在建筑物或建筑系统中生命初始进行探讨,运行和维护费用,以及未来利益。在此之前分析能够应用,假设是关于在建设中质量期望,程序限制,以及未来预测资金成本。生命周期成本可帮助设计团体系统地决定设计方案,设置场地,建筑使用材料,和统金钱投资。它可用于新建或改建项目。在改造项目中,首先处理问题是,是否将该建筑物被拆除或保留。假如已决定保留建筑,接下来问题是怎样规模整修来满足期望。这些分析能够经过一个生命周期成本分析完成。这目标是去发觉,给与几个满足用户需要供选方案,哪一个成本最少超出了建筑物寿命。比如,一个特定非传统加热系统能有一个高基本成本。基本成本包含直接相关设计,采购成本,以及系统安装。不过,这么系统可能比传统系统预期寿命较长,可更有效地燃 燃料,并可能不需要这么多维修,和能够使用廉价燃料起源。展开阅读全文
咨信网温馨提示:1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前可先查看【教您几个在下载文档中可以更好的避免被坑】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时联系平台进行协调解决,联系【微信客服】、【QQ客服】,若有其他问题请点击或扫码反馈【服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【版权申诉】”,意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:0574-28810668;投诉电话:18658249818。




工程管理中英文外文翻译.doc



实名认证













自信AI助手
















微信客服
客服QQ
发送邮件
意见反馈



链接地址:https://www.zixin.com.cn/doc/4413784.html