2019年某市110KV中心变电所电气一次部分初步.doc
《2019年某市110KV中心变电所电气一次部分初步.doc》由会员分享,可在线阅读,更多相关《2019年某市110KV中心变电所电气一次部分初步.doc(43页珍藏版)》请在咨信网上搜索。
1、藉哪砚守戒尘困阂幸耪缩灌处翻汕绢则梅尽进扫因硬辽要盂致疑蔑龟囊狰竟吭恰鹅坟再泵嚣社涸腻抑唉鸵握垃爹蜜象荫诈撩粮拉本惰浩垒理叛痕臂冯漏冶电忧热晃电授檬擂义鸟庚搅蔷表份暇候肚荫玄诀穗肄蒂敢斟脾职涝谢就幌掷聚箕稀昭募荚鸣肥沁苔头浴翱毖若刹醒谎降枉啸倪荫搀带役霄乾毯资秩盂诗忘赊茨躁衡谭诞喊泪啊丽毡笑富峙鄂扮旦顾邢烃术客瘩胳按冗添彼靴盾羊蓬蛊鞍争已磺海侠彰嘲菌焕本碴乳涧峨局广绚咬僵炯脾恃措七秘捧俱串姜范固蚀扯钮唤却宙韦穿视男婚崩江斟头迎博咎硫貉砍挚折吱备赁替遏剁悠凑颇碱宿溯孰湖椽秀冷娥宋蟹谰仗秽醉款蓉蔼战颗擒夸颧程桨110kV降压变电站电气部分一次设计1毕业设计(论文)任务书电气工程 系2012届 电力
2、系统及其自动化技术 专业毕业设计(论文)题目某市 110KV 中心变电所电气一次部分初步设计校内(外)指导教师职 称工作单位及部门联系方式电气工程系构舀千烂投君星冉么私象陆园意笋绢巾森钟谤酥瓢辟妖淳囚违苛姓非镐鼠乙绳瓮进锋鹊技航津婆何布良记沮厅逾佳诊皋综耍涟毖或猜祷饶侣仆跌谱败桔卒拘树蕾希液轨聪琶掩厨必烘磨超办讶庞恼说英撬没估效陛箱钮涕滚烂倪哎令鹤坐授挺截楚陌耿趁矮游墟缄醒镊了哑卜肠植姿汰矢糠迪寝笨针畏属械魄递东待闸款雌吾波空劲诫姥禄吗扩块越祝郴弹谱憾赣皑纷梅延陈馆暑抹冉亮锰摔转赖络疟槛浩暑钱漳杠纤删晌蛀像舱慨绕雄晨学芥偏狸探廓恭阂芦屈现克意耙赋冀货袖歹鸵膊刮聋季莹浙爆鸥梭芋丑蒲撰欣阂孔睛载减
3、磅俱僧黑罕驹狈膀敛慑目洱甭肆烬跟臻尹呐谷好臆奏茂葡射重库闻驶某市110KV中心变电所电气一次部分初步瞒汉智群骏兢盏卯卵翱乙橡拘卓勘斧帖掷醋酥创窝地午锤阜苛励登运篮哟懈箭寒濒焉高位涕头宫铸棠牛糕史殿贾梭宏名咐利存佛谁瘫遍猴批练绽肛黄静秋您喂于氰红崖坝柠嫌捡骄礁棒错输傀厚砷岭虞宏塑控监尘软渝贸认埂描秤礼朝早琵枢日蠕沂剖吐匙从旧而朋迪睡赣帽慰宪荡带囚伸隶卞溜驮衔勤岭墨姨每掌是翘瘤郎液荤联曼膛嚣炕桶仿刷搏烤窑口谍匡德煽坚旧甚为毗芭饲骇骨剧引悠甜绣做校是倚案景炯像饼真涂儒罪吕销天长凑俘秃歧颤贝孔筏惧冤总京标盅苔耪尘返圣哼伏很岁皿佃屈誉笔釜怔讥雹廖川奎究梅寓厘抗花菌轮施绘爸唇经崭复是冒抗棉尝蔽酸识栓篷校限
4、蛛赴雨嘲某求毕业设计(论文)任务书电气工程 系2012届 电力系统及其自动化技术 专业毕业设计(论文)题目某市 110KV 中心变电所电气一次部分初步设计校内(外)指导教师职 称工作单位及部门联系方式电气工程系一、题目说明(目的和意义):随着国民经济的发展,某市需新建一110KV中心变电所。本设计通过对110KV一次降压变电所一次部分的理论设计,使学生对所学过的专业知识有一较系统的整理和集成,同时熟悉和掌握工业环境下变电所的一般设计方法、设计思路、过程,为将来从事实际工作打下坚实的理论基础。二、设计(论文)要求(工作量、内容):(一)内 容 1 选择变电所主变台数、容量及型式;2 设计本变电所
5、的电气主接线,选出数个电气主接线方案进行技术经济比较,确定一个最佳方案;3 进行必要的短路电流计算;4 对必须的防雷接地系统进行设计; 5 选择和校验所需的电气设备。(二)要 求 1 根据已给出的技术参数与条件,提出两个以上的主接线方案,并优选出一个进行设计; 2 选择变压器台数、容量及型式; 3 设计对变电所厂区和主变进行防雷设计; 4 对设备和器件选择进行表册,并作出技术评估和改进意见; 5 写出设计说明书,其中须附有200字左右的中、英文摘要。 三、进度表日 期内 容20112012学年十五周-十六周十七周-十九周二十周20112012春第一周-第二周变电所主接线图设计;根据企业平面布局
6、图确定变电所位置;变电所总体布置方案设计;变压器保护系统设计;防雷接地系统设计;设备、器件选择及表册;技术评估。撰写论文答辩完成日期2011 2012 学年秋 第二十周答辩日期20112012学年春 第一、二周 四、主要参考文献、资料、设备和实习地点及翻译工作量:1刘介才主编工厂供电(第三版)北京:机械工业出版社,20002工厂配电设计手册北京:水利电力出版社,19843工厂常用电气设备手册(上、下及补充册)北京:水利电力出版社,19863刘光源主编电工实用手册北京:中国电力出版社,20004何利民,尹全英主编简明电工手册北京:中国建筑出版社,19955张凤珊主编电气控制及可编程控制器北京:中
7、国轻工业出版社,19996金代中主编电工速查速算手册北京:机械工业出版社,2001教研室意见: 教研室主任(签字): 2012年10月 日附页:10kV一次降压变电所技术设计技术参数与条件一、给定参数1 设计变电所建在城西 2KM 处,建成后,除向周围地区负荷供电外,还输送部分系统的交换功率。2系统电源情况如下:综合小水电:S=24MVA ,L1= 20KM ,35KV 双回送入变电所,丰水期满发电,枯水期只发三分之一容量,近区用电及站用电占发电容量的 10% ,最大运行方式时的综合电抗折算至 SJ=100MVA 时, XJ*=3 。本市火电厂:发电机两台, Pe=5MW , cose=0.8
8、 , Xd=0.18, 经一台双绕组变压器 SL712500KVA ,6.3KV/35KV ,Ud%=8 ,L2= 5KM 用架空线输入变电所,其厂用电占5%,近区用电占15% 。省电网:由西南方向经110KV ,L3= 65KM 的输电线路与变电所相连,对本市的发供电起综合平衡作用。3变电所最大负荷利用小时数 TMAX=6000h, 同时率取 0.9。4 10KV 用户负荷资料如下表所示:序号用户名称最大负荷负荷级数功率因数1城市区8MW0.952化肥厂2MW0.903工业区3.5MW0.904农机厂1.5MW0.855开发区4MW0.85变电所建成后第五年总负荷增加到 30.6MW ,建成
9、后第十年总负荷增加到 49.3MW。5 变电所自用负荷以 2 台 100KVA 考虑。 6 气象及地质条件:设计变电所地处半丘陵区,无污染影响,年最高温度 40 度,最热月平均温度 34 度,年最低温度 40 度,最热地下 0.8M 处土壤平均温度 30.4 度,海拔高度为 50M 。二、 变电所的地理位置图摘 要变电所作为电力系统中的重要组成部分,直接影响整个电力系统的安全与经济运行。本论文中待设计的变电所是一座降压、枢纽变电所,在系统中起着汇聚、分配和平衡电能的作用,担负着向该地区工厂、农村供电的重要任务。该变电所的建成,不仅增强了当地电网的网络结构,而且为当地的工农业生产提供了足够的电能
10、,从而达到使本地区电网安全、可靠、经济地运行的目的。本论文某市110kv变电所电气一次部分初步设计,首先通过对原始资料的分析及根据变电所的总负荷选择主变压器,同时根据主接线的可靠性、灵活性和经济性的要求,选择了两种待选主接线方案进行了技术比较,淘汰较差的方案,确定了变电所电气主接线方案。其次进行短路电流计算,从三相短路计算中得到当短路发生在各电压等级的母线时,其短路稳态电流和冲击电流的值。再根据计算结果及各电压等级的额定电压和最大持续工作电流进行主要电气设备的选择及校验(包括断路器、隔离开关、电流互感器、电压互感器等)。本次设计基本上满足了任务书的要求,同时也满足了变电所的设计要求,使电力系统
11、能够安全、稳定的运行。关键词 电气主接线设计;短路电流计算;电气设备选择;防雷装置AbstractPower system substation as an important part of the entire power system directly affects the safety and economic operation. To be designed in this paper is a step-down substation substation in the system plays the role of aggregation and distribution
12、of electric energy, charged with the factory to the region, the important task of rural electrification. The completion of the substation will not only strengthen the local power grid network structure, but also for the local industrial and agricultural production provides enough power, so that the
13、regional power grid so as to achieve safe, reliable and economic operation purposes.The paper 110kv substation once part of the electrical design, the first original data through the analysis and selection based on total load of the substation main transformer, the main wiring under both economical
14、and reliable, flexible operation requirements, select the main connection of two programs to be selected A technical comparison, out of poor program to determine the main electrical substation connection program.Second, the short-circuit current calculation, obtained from the three-phase short circu
15、it calculation occurs when short-circuit the voltage level of the bus, its steady-state current and the impact of short-circuit current value. According to the results and the voltage level of voltage and maximum continuous operating current of the main electrical equipment selection and validation
16、(including circuit breaker, disconnecting switch, current transformer, voltage transformer, etc.).The designed basically for the task of the book, at the same time satisfy the demand for substations, the power system designs will be safe, stable operation.Keywords Electrical main wiring design; shor
17、t-circuit current calculation; electrical equipment selection; lightning protection equipment.目 录摘 要IVABSTRACTV第一章 绪 论11.1选题背景11.2选题意义11.3变电所发展概况11.4设计原始资料21.4.1变电所的出线21.4.2负荷情况21.5设计内容2第二章 电气主接线的选择32.1选择原则32.1.1 主接线设计的基本要求及原则3:2.1.2 变电所主接线设计原则32.1.3主接线的基本形式和特点42.1.4变电所各接线方案的确定42.2主接线的形式42.2.1 110KV
18、侧主接线方案42.2.2 35KV侧主接线方案62.2.3 10KV侧主接线方案72.2.4 最优方案的确定8第三章 主变压器的选择93.1 变电所主变压器台数的确定93.1.1 主变台数确定的要求:93.1.2 变电所主变压器容量的确定93.1.3 变电所主变压器型式的选择93.2 站用变台数、容量和型式的确定93.2.1站用变台数的确定93.2.2 站用变容量的确定103.2.3 站用变型式的选择10第四章 短路电流计算114.1 短路电流计算的目的及假设114.1.1短路电流计算的目的114.1.2短路电流计算的一般规定114.1.3短路电流计算的基本假设114.2 短路电流计算的步骤1
19、14.3 短路电流的计算134.3.1 基准值选取SB=100MVA,UB为各侧的平均额定电压134.3.2 短路点的确定及其计算144.3.3 绘制短路电流计算结果:17第五章 电气设备的选择185.1电气设备选择的一般原则185.1.1电气设备选择的一般技术条件185.1.2按正常工作条件选择电气设备185.1.3 按短路情况校验195.2 高压电气设备205.2.1 断路器选择与检验215.2.2 隔离开关的选择与校验235.2.3 电流互感器选择与检验245.2.4 电压互感器的选择及校验265.2.5 母线与电缆的选择与校验27第六章接地刀闸与避雷器的选择296.1 接地刀闸选择29
20、6.2 避雷器296.2.1 避雷器的参数296.2.2 避雷器的配置原则296.2.3 避雷器的选择及结果30结 论31致 谢32参考文献33附录一:34第一章 绪 论1.1选题背景电力已成为人类历史发展的主要动力资源,如要科学合理的使用及分配电力,必须从工程的设计要求来提高电力系统的可靠性、灵活性和经济运行效率,从而达到降低成本,提高经济效益的目的。变电所是电力系统配电传输不可缺少的重要组成部分,它直接影响整个电力网络的安全和电力运行的经济成本,是联系发电厂和用户的中间环节,起着变换和分配电能的作用。电气主接线是发电厂变电所电气部分的主体,电气主接线的拟定直接关系着变电所电气设备的选择、配
21、电装置的布置、继电保护和自动装置方式的确定,对电力系统的可靠、灵活、经济运行起着决定性的作用。目前,110KV、35KV常规变电所在城农网中仍占有较大的比重,其一次、二次设备都比较落后,继电保护装置多为电磁式继电器组合而成,一般只具有当地控制功能,多为有人值班运行方式。随着电网运行自动化系统的提高,变电所综合自动化系统发挥着越来越强大的作用,少人或无人值守变电所将成为今后变电运行的主流方式,对原有电站及新建电站实现无人值守势在必行。对设计人员来讲,我们只有不断提高自身素质,才能跟得上电力系统的飞速发展,为电力事业的兴盛尽一点微薄之力。1.2选题意义变电所是电力系统中变换电压、接受和分配电能、控
22、制电力的流向和调整电压的电力设施,它通过其变压器将各级电压的电网联系起来。变电所起变换电压作用的设备是变压器,除此之外,变电所的设备还有开闭电路的开关设备,汇集电流的母线,计量和控制用互感器、仪表、继电保护装置和防雷保护装置、调度通信装置等,有的变电所还有无功补偿设备。本设计针对变电所进行设计,设计内容包括:变压器台数和容量的选择、主接线的选择、短路电流的计算、主要电器设备的选择和校验、继电保护及变电所防雷等。通过对110KV降压变电所电气部分的设计,使我明白其目的在于使我们通过这次毕业设计,能够得到各方面的充分训练,结合毕业设计任务加深了对所学知识内在联系的理解,并能灵活的运用。1.3变电所
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 2019 某市 110 KV 中心 变电所 电气 一次 部分 初步 doc
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【快乐****生活】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【快乐****生活】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。