发电机房外脚手架施工方案.doc
《发电机房外脚手架施工方案.doc》由会员分享,可在线阅读,更多相关《发电机房外脚手架施工方案.doc(8页珍藏版)》请在咨信网上搜索。
1、Delegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Asse
2、mbly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the partys 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve,
3、smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.8
4、15 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security measures: unplanned outages 2.5 times. No pe
5、rsonal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207
6、 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions perfo
7、rmance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. -Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduc
8、tion over the same period a year earlier. Major achievements: first, we should adhere to the two management system basis, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two management system for improvement. F
9、ocus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management networ
10、k role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervis
11、ion of production safety and the Olympic Games and otherA2施工方案报审表工程名称:宁煤集团25万吨/年甲醇 发电机厂房 编号:SCC-FA-04致:成都信达监理公司 (监理单位)我方已根据施工合同的有关规定完成了 发电机厂房(208A)脚手架搭拆施工方案 工程施工方案的编制,并经我单位上级技术负责人审查批准,请予以审查。附:发电机厂房脚手架搭拆施工方案承包单位(章) 项目经理 日 期 专业监理工程师审查意见:专业监理工程师 日 期 总监理工程师审核意见:项目监理机构 总监理工程师 日 期 类方案宁夏煤业集团25万吨/年甲醇工程发电机厂房
12、(208A)脚手架搭拆施工方案批 准:审 定:质量审核: 安全审核:编 制: 周 天 荣中国化学工程第六建设公司宁煤甲醇项目部二五年七月二十日目 录1、简述2、脚手架搭设前的准备工作3、脚手架的搭设及要求4、脚手架拆除安全措施5、材料需用量计划发电机厂房外脚手架搭拆施工方案1、简述宁煤集团甲醇项目发电机厂房(208A)由两部分组成:气化开关所部分,框架最部点11.45m;汽轮发电机厂房区,檐高为22.5m。根据工程特点,本工程拟采用双排双立杆落地式钢管扣件脚手架进行施工。其中,主体施工阶段为满足安全防护的要求,先搭设单排双杆外架子作为防护外架,随工程进度在已有单排架子的基础上,增搭外排架,将原
13、有双杆单排改成双杆双排架,同时作为装修防护用。2.脚手架搭设前的准备工作2.1脚手架立杆底部土质必须按要求进行平整、夯实,局部土质较松软处要用C10混凝土进行处理。2.2所有扣件必须经过认真检查、筛选,对存在裂纹、气孔、疏松、砂眼等缺陷的扣件严禁使用。2.3搭设中所使用的溜绳、铁丝、钎棍等要准备齐全并经过检查。3、脚手架的搭设及要求3.1材料的选择和要求本工程采用扣件式钢管脚手架,杆件采用483.5的钢管,扣件连接,脚手板采用50mm厚松木板46m长。所有管件、扣件必须符合标准规:钢管有弯曲、压扁等缺陷的不得使用,扣件不得有裂纹、气孔、疏松、砂眼等缺陷,扣件转动灵活,当扣件夹紧钢管时开口处最小
14、距离不小于5mm,扣件防止锈蚀;脚手板不得有腐朽,贯通节疤。3.2脚手架的地基处理搭设场地表面基土必须夯实、整平。离建筑物0.9m和1.8m作为立杆位置,立杆下部必须设置方木或硬物作为支垫。立杆底部距地面120mm处,设置连续式扫地杆。脚手架扫地杆与立杆处用小横杆拉牢。3.3杆件布置根据工程特点,在主体框架施工时,先搭设成单排脚手架,当进入装饰装修、围护砖墙砌筑过程时,再在外侧搭设起一排脚手架使其成为双排脚手架,以作为安全防护及施工双重功能的脚手架。脚手架搭设宽度为0.9m,脚手架内立杆与墙面的距离为0.9m。双排脚手架的立杆间距为1.5m,大横杆间距为1.7m。外脚手架立杆接头和横杆接头的要
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 完整 word 发电 机房 脚手架 施工 方案
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【快乐****生活】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【快乐****生活】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。