1、大连交通大学2015届本科生毕业设计(论文)外文翻译Literature review of JIT-KANBAN systemAbstractIn this paper, JIT (JustInTime) -KANBANliterature survey was carried out and presented.Theintroductory section deals with the philosophy of JIT,andthe concept involved in the push and pull system. Theblocking mechanisms in the k
2、anban system are alsodiscussed elaborately。 Besides these sections, the importanceof measure of performance (MOP) and the applicationof the same with respect to JITKANBAN arepresented。 The recent trends in the JIT-KANBAN arediscussed under the heading “Special cases”. In this review,100 state-ofart
3、research papers have been surveyed。 Thedirections for the future works are also presented。1 IntroductionJust -InTime (JIT) manufacturing system was developedby Taiichi Ohno which is called Japanese “Toyotaproduction system”JIT manufacturing system has theprimary goal of continuously reducing and ult
4、imatelyeliminating all forms of wastes (Brown et al。 5,Ohno54, Sugimori et al。 82). Based on this principle,Japanese companies are operating with very low level ofinventory and realizing exceptionally high level of qualityand productivity (Richard J。 Tersine 62, James H. Greene 30). JIT emphasizes “
5、zero concept” which meansachievement of the goals of zero defects, zero queues,zero inventories, zero breakdown and so on。 It ensures thesupply of right parts in right quantity in the right place andat the right time。 Hence, the old system of materialacquisition and, buyer and seller relationships a
6、re changedto new revolutionary concepts (Womack et al. 91,Womack and Jones 92, Markey et al。 45)。 Similarly,JIT becomes an inevitable system at plant level, whichintegrates the cellular manufacturing, flexible manufacturing,computer integrated manufacturing and Robotics(Schonberger 63, Golhar 12)。Du
7、e to the technological advancement, the conventionalmethod of push production system linked with MaterialRequirement Planning (MRP) was changed to pull type JITproduction system to meet out the global competition,where the workinprocess (WIP) can be managed andcontrolled more accurately than the pus
8、h productionsystem (Mason Paul 46)。KANBAN system is a new philosophy, which plays asignificant role in the JIT production system. Kanban isbasically a plastic card containing all the informationrequired for productionassembly of a product at each stageand details of its path of completion. The kanba
9、n system isa multistage production scheduling and inventory controlystem。 These cards are used to control production flowsand inventory. This system facilitates high productionvolume and high capacity utilization with reduced productiontime and workinprocess。The objectives of this paper are as liste
10、d below1) Critical review of JIT literature.2) Segregating the different research articles of JIT。3) Exploring the recent trends in JIT-Kanban system andderiving directions for future research.In this paper, the articles are reviewed and an appropriateclassification is presented。The kanban study was
11、 madeelaborately, since it acts as a basic communicator and feedbackagent to the JIT system。 Push and pull system,principle of operation of kanban cards, Blocking mechanism,Toyotas formula, and the measures of performances(MOP) are also discussed in this paper. The latest trends inJIT-Kanban system
12、are also addressed separately under theheading “Special cases”。 Finally, the directions for futureresearches are presented。6。1。1 Flow shopKanban system is widely implemented in repetitivemanufacturing environment。 Fora single card operationalsystem, Sharadhapriyadarishini et al. 77 have developedtwo
13、 heuristics and proved that these are more efficient.Saradhapriyadarishini et al。 78 have proposed a recursiveequation for scheduling the single card kanban system withdual blocking. They proposed a heuristic with twinobjectives of minimizing the sum of total weighted timeof containers and weighted
14、flow time of part-types。Rajendran 61 has done a work on two card flow shopscheduling with n parttypes。 In this paper, mathematicalmodels for time tabling of containers for different problemshave been formulated。 Then, a heuristic was developed tominimize the sumof weighted flow time, weighted earlin
15、ess,and weighted tardiness of containers. Hemamalini et al。 22have done similar work. In this work, the heuristic developedis simulated annealing algorithm. This is compared withrandomsearchmethod。 In these papers, the comparisons aredone only based on mean relative percentage increase。Instead of th
16、is approach, comparisons based on completeANOVA experiments would provide reliable inference.Peter Brucker et al。 58 have carried out research onflow shop problem with a buffer of limited capacitybetween two adjacent machines。 After finishing theprocessing of a job on a machine, either the job is to
17、 beprocessed on the following machine or it is to be stored inthe buffer between these machines. If the buffer iscompletely occupied, the job has to wait on its currentmachine but blocks this machine for other jobs。 In thispaper, they determined a feasible schedule to minimize themakespan using tabu
18、 search. The results of the problemusing tabu search were compared with that of benchmarkinstances。 The comparisons are done only based on relativeimprovements。 Instead of this approach, comparisonsbased on complete ANOVA experiments would providereliable inference。6.1.2 Assembly lineAssembly lines
19、are similar to the flow shops in whichassembly of parts are carried out in a line sequence。 In amulti product assembly line, the sequencing of the jobs is achallenging task。 Drexl et al。 16 considered an assemblyline sequencing mixed model problem. It is a combinatorialproblem. They formulated this
20、combinational problem asinteger programming model。 This model can be used onlyfor small size problems due to the limitations of operationsresearch software with respect to handling the number ofvariables and constraints, which are present in the integerprogrammingmodel。 Xiaobo et al。 94 have conside
21、redsimilar work on mixed modelassembly line sequencingproblem with conveyor stoppages。 They proposed branchand bound algorithm, and simulated annealing algorithmfor finding the optimal solution and suboptimal solution ofthe mixedmodel sequencing problem, respectively tominimize the total conveyor st
22、oppage time。 The branchandbound method was devoted to find the optimalsolution of small-sized problems, whereas the simulatedannealing method was used to cope with large-scaleproblems to obtain a good suboptimal solution. Future,research on simulated annealing applied to this problemcan be directed
23、to establish a better seed generationalgorithm。 However, the practitioner should spend considerabletime in fixing the parameter called temperature(T) in the simulated annealing algorithm by trail and errormethod before actually solving the problem。6。1.3 Batch production systemIn a batch production s
24、ystem, the switching over from oneproduct to other product depends on many factors such asstock reaching to the threshold level, different priorityschemes, economical setups, etc. Tafur Altiok et al。 86have dealt this issue differently for the pull typemanufacturing system with multi product types.
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 工业 工程 生产 外文 翻译
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【人****来】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【人****来】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。