1、整合管理试题1。 In the initiation phase of your project, it is apparent that different departments of the clientscompany hold different views on project structure and project deliverables。 What is the bestaction for you?A。 Ask the client when they will finalize their requirements。B。 Work with leaderships f
2、rom each department to collaboratively engineer a mutuallyacceptable solution。C。 Make sure the terms and conditions of the contract are clear.D. List the consequences of changes in the contracts requirements section.在项目的启动阶段,客户公司内部各部门关于项目结构和可交付成果明显存在不同观点,你的正确行动应该是B:A. 询问客户什么时候能够达成一致性需求B。 与客户各部门领导合作,
3、策划一个相互都能接受的解决方案C。 确保合同条款清楚D。 在合同要求条款中列明变更的后果2. You have been assigned to upgrade the companys IT infrastructure. Specifically, your teamhas been asked to implement a corporate general ledger system, improve accounting and realestate process, develop a lease tracking system, and implement HR and payr
4、oll system。 Yourproject team has already completed all the initiating/planning activities and receivedsign-off/approvals on the project charter, project scope, and detailed work packages。 Your projectteam is in the process of completing all the work packages。 However, you have just received achange
5、request to add additional reporting functionality to the lease tracking application。Fortunately, you have already determined that this functionality has no effect on the componentsof the “triple constraints”. Which of the following is the BEST action to perform NEXT?A。 Implement the change request a
6、s it has little impact to the project and is easy to implement。B。 Investigate options on how to implement the change requests with minimal impact to theproject。C. Review the change request with the change control board.D. Evaluate the impact of the change request on the other project constraints.你被任
7、命去负责更新公司的IT设施,具体来说,就是要带领你的团队实施公司的财务总帐系统,改善会计和房地产流程,开发租赁追踪纪录系统,并实施人力资源和工资单系统.你得团队已经完成了启动/计划活动,并获得了项目章程、项目范围和具体工作包的批准.你的团队正在完成所有的工作包,但是你收到一个变更请求,要求你为租赁追踪纪录系统增加额外的报表功能。幸运的是,你判断这一功能对“三重约束中的要素没有影响.接下来,哪一个选项是你的最佳行动?CA。 既然对项目的影响很小,也很容易实施,就实施这一变革更请求B。 就如何实施这一变更请求调查可选方案,使它对项目的影响降至最低C。 让变更控制委员会审核这一变革更请求D。 评估这
8、一变革更请求对项目其他约束条件的影响3。 A list of approved configuration identification, status of proposed changes to the configuration,and the implementation status of approved changes, is recorded and reported in which of thefollowing item?A。 Configuration identificationB. Configuration definitionC。 Configuration s
9、tatus accountingD. Configuration verification and auditing关于已经批准了的配置识别,配置的建议变更的状态,和批准变更的事实状态,形成一个列表进行记录和汇报,属于下面哪一项?CA。 配置识别B. 配置定义C. 配置状态记录D。 配置核实和审计4. You have just taken control of a project in the middle of execution and need to learn who hasapproval authority for revisions in scope。 Which docume
10、nt provides this information?A. Resource assignment matrixB。 Change control systemC. Project charterD。 Client organization chart在一个项目的实施过程中,你接管这个项目.你需要了解谁有权力批准范围的修订,从哪个文件中可以获得这一信息? CA。 资源分配矩阵B。 变更控制系统C. 项目章程D。 客户组织关系图5. You have just finished most of the work on a new systems integration project whe
11、n the sellercomes to you with detailed procedures for closeout of the contract。 The contract has alreadyincluded a set of closeout procedures. What should you do?A。 Get a change order firstB。 Revise the closeout procedures after getting managements approvalC。 Create new procedures that are more comp
12、leteD. Assess the quality of the sellers new detailed procedures and if they are better than the currentprocedures, use them一个新系统集成项目的大部分工作就要完成的时候,发包方交给你一套完整的合同收尾程序.而合同中已经包括了一套收尾程序,你应该:BA。 首先让他提交变更单B。 获得管理层批准后再修改收尾程序C。 建立一套更加完善的收尾程序D. 评估新程序的质量,如果更好,则予采用6. During activity definition, a team member id
13、entifies an activity that needs to be accomplished。However, another team member believes that the activity is not part of the project as interpretedby the project charter。 What should the project manager do?A. Try to build a consensus of the team。B。 Make the decision by herself about whether to incl
14、ude it or not.C。 Talk to the end user。D。 Talk with the project sponsor.在活动定义期间,一名团队成员确定了一项需要完成的任务.但是,另外一名团队成员认为按照项目章程理解,该活动不是项目的组成部分.项目经理应该如何做?AA。 试图在团队成员之间达成共识B。 自己决定该活动是否包括在内C. 与最终客户进行商谈D。 与项目发起人商谈7。 Schedule revision are a special type of project schedule updates。 Elements of changing aproject sc
15、hedule include all of the following EXCEPT:A。 Obtain the appropriate levels of approval。B. Submit the appropriate change requests.C。 Evaluate the impact of a change to the schedule.D。 Adjust the project end date to the schedule variance。进度修订是一种特殊类型的项目进度更新。变更项目进度的要素不包括下列哪一个:DA. 获得适当层面的批准B. 提交适当的变更请求C
16、. 评估变更对进度的影响D. 根据进度偏差调整项目完工日期8。 A KEY activity in closing out a project is to:A。 Disseminate status reports and risk assessment。B。 Disseminate information to formalize project competition.C。 Monitor the specific project results to determine if they comply with relevant qualitystandards.D. Transfer a
17、ll the project records to the project owners.项目收尾时的一个关键活动是:BA。 发布状态报告和风险评估B. 发布消息以正式确认项目完工C。 监控具体的项目结果以确定其是否符合相关质量标准D。 把全部项目记录转移给项目所有人9。 You are the project manager on a project that has met all deliverables on schedule and onbudget. What MUST be done to ensure all work was completed correctly and s
18、atisfactorily?A. Obtain formal approval from the contracts manager.B. Perform product verification。C。 Perform scope verification.D. Perform a procurement audit。你是项目经理,所有的交付成果都符合进度和预算。要保证所有工作的正确和满意完成,你必须:AA. 获得合同经理的正式许可B. 执行产品核实C. 执行范围核实D。 执行采购审计10。 During the project execution where schedule and cos
19、t performance were satisfactory, you arenewly promoted as the PM for the project。 What is the most important thing before you attend theintroduction meeting?A. Setting proper project goal sB。 Introduction of team members to stakeholderC。 Checking communication planD。 Making sure that you have obtain
20、ed the Project Charter项目执行期间,进度绩效和成本绩效均令人满意。这时你被任命为这个项目的新任经理,你在出席见面会之前最重要的是什么?DA。设定恰当的项目目标B。向项目干系人介绍小组成员C。检查沟通计划D.保证获得项目章程11. Your company has just presented its new fiveyear strategic plan。 You have received a newproduct request from a customer that is in line with the previous five-year strategic
21、plan, but itdoes not meet the objectives of the new plan。 The product description seems to have a validbusiness driver and to help company development。 As project manager, what is the BEST courseof action?A。 Perform a cost benefit analysis of the project and submit it for management approval.B。 Subm
22、it the product to management for review and approval before proceeding。C。 Inform the customer of the change in corporate direction and ask him/her to take another lookat the project.D. Request a project charter from management and begin a WBS.你的公司正在执行新的五年战略计划.你接到客户的一个产品需求,该产品符合前一个五年战略计划,但不适合新五年计划的目标
23、。产品描述好像具有有效的商业驱动,并有利于公司的发展.作为一个项目经理,什么是最佳行动?BA。 进行项目成本/效益分析并提交管理层批准B. 在行动之前提交管理层审核和批准该产品C。 把公司方向的改变通知客户,并要求他/她对项目是否再考虑一下D。 向管理部门要求一个项目章程,开始制定一个WBS12。 You are performing administrative closure for the project execution phase of the project。Upon completion of this step, you will have project archives,
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 整合 管理 试题
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【w****g】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【w****g】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。