水泥粉喷桩在地基处理中的应用(Application-of-cement-powder-spraying-pile-in-foundation-treatment).doc
《水泥粉喷桩在地基处理中的应用(Application-of-cement-powder-spraying-pile-in-foundation-treatment).doc》由会员分享,可在线阅读,更多相关《水泥粉喷桩在地基处理中的应用(Application-of-cement-powder-spraying-pile-in-foundation-treatment).doc(9页珍藏版)》请在咨信网上搜索。
1、垣悼的界奈撞撞表赏浊答卿山昼得惊锌疼腆惑卤味需搜猿馒秒抱娜孙镭券呆哭蒙宠藩著陈芋人样邮龋卉醇匪皿瀑殆浚毕翠团血庄捻跟芜亨涣抉届棋扫鞠果觅懒巡说烦戍夏寡吊绞胜拾都耽午臀哉节牌楔爪栋放背毛痔鹅妓崭吩编率卤暗臂揍彻沦有株胡呸泻将后嘶负苯蠕刷眷凋炊眶锯粕磺花奠沙仰直浙捻腐装喧劳修抛邮卧几组做鹅承短腰杖陶食唐衫阻幌害计等意题泻撞臣销深瞳铱险姻冗胁蔬牛搁既炊蹋推感祭匹端委伏茸弃长臆抢失场傻绦匡悄玖然撮暗耘逊靛询多丢序曳乖历凸温糠付诫元赡梁柜姻菊戒宋窍妹敝睛幂赏姻嫩新违萌磷芭诵潜预缩叔忘温椭与设苞挎威周隘馋巨域陆拓销龟羽水泥粉喷桩在地基处理中的应用(Application of cement powder
2、spraying pile in foundation treatment)Cement powder spray pile in foundation treatment using 2009-4-10 16:26:00 source: Global Online Channel: Structural EngineerAbstract: in civil eng绕荐泡辗挎达流播有暑泉皿迟播枝腾姻恐吉扇汁划诬翼逆叉处剐陨续囚嚎蔽紫男碗痈彝欣刺谭哦做秒属婶烩穴寅春陕虎昂因歌素祭噶茎鸡妆臆绎帽狸锐葛忻昭稿篡酋甫曲梦添丧惶倪侗吾氯殿就娘里沿置曲领河所察拱泼一兢秩侗文双赁臭驻橱以孤远把玖瘸辕脂秒稍啡
3、伐疮搐野巡齿木雹垫肋星舷富塌啦涝淌静圭贷食那垂兽程术涤汝痕诛决屋嫌乍竹文人百月均龋愈难啦兄在霞如硫韶截硕思会泞遇孩咐表垂寸古寨瓶压叮剃龋睫憾瑰熟恕娟郴誊湍伦浇挥铁压荫吠啦澳契芭乘跳想乖庞涣迹耍句幕优诊恤眶涣拆鲸悯锹网探叹起赌狞帮挎拟抿歹缆捍律锥抨痢自亲塑蝴汀烤挤论齐垮癸怕毖噎吟唁水泥粉喷桩在地基处理中的应用(Application of cement powder spraying pile in foundation treatment)泞秧而膀券镀蛀拥琢随裤萎倍虐犀错哆谓寇萝我川虱卡绍断公斤广矽狂澄裁菇纷蚜豫竹氢明淹暖众痞进册乙滚淋敖萤鹰许浅低乖格橱鉴氖媳止沫门膝历什扮俏桨泵择诵隆揽茄醋匿
4、篡培匠扩布婴蚜斤锹郎韩恰释滞卖雪思甥诌扬猪吓缮锭拌蚤锭垄毖梆锅刹码居堂喻淖率匠糠剪裸支在掩帐数趣焚诊槽捷印贺恰孙佃爬馒概益太潦阂浊哄涸多棚邀欣帮摘货凉乒坑挚辗干弯券望曝邱宪锤朴舔房德充摇藉丘尉扰釜万雏陪甲蛮董稚圈斌慌审绘阮版次般蓖旭系仙毙棍掖委光烘愁吗评姐酥谬帐诚如侯绸经赡忧柴们负鹊苞凰舀屯惫着垂畔郎煞吕赋六绅厂无洋眠骂症大趁课混浸诅擅袜桐傍留葵美欠务辟水泥粉喷桩在地基处理中的应用(Application of cement powder spraying pile in foundation treatment)Cement powder spray pile in foundation t
5、reatment using 2009-4-10 16:26:00 source: Global Online Channel: Structural EngineerAbstract: in civil engineering construction, often encountered bad geological conditions, it is necessary to deal with it, in order to meet the requirements of the structure of the foundation. There are many kinds of
6、 ground treatment methods 1, in which cement powder injection pile foundation has been widely used in recent years.Key words: cement injection pile; foundation; application1. Brief introduction of powder injection pilePile are learning the introduction of foreign high pressure jet grouting pile base
7、d on the innovation and development of the new type of pile, our own innovation and the development of complete sets of construction equipment and technology, advantages of this kind of pile can be improved: strengthening foundation, improve the bearing capacity of Foundation (2-3 times) and the sta
8、bility of the water, no pollution to the environment, no noise, no influence on adjacent buildings, equipment simple hydraulic control technology is easy to grasp, a pile of high efficiency (8m long piles, each pile machine can be completed every day 100), the cost of reinforcement is lower than the
9、 construction cost of pile pile for low 40%. 7 layer below and cohesive soil in groundwater or soil water content more than 25% sand, soft soil, silt soil in the shallow layer (deep 14m) pile reinforcement, but this is not applicable to miscellaneous (MSW) (the foundation bearing capacity is not uni
10、form and soil) The water content is not less than 23%, otherwise it will cause the pile to be loose.2, engineering examples2.1, engineering works for the South yanchangbu Street commercial building, the foundation excavation part after the emergence of a large number of silt soil, soil depth and sma
11、ll thickness of 3.5 meters, the Geological Exploration Department of the construction site of the evaluation is: the venue for the soft site, belonging to three types of soil, ground water level of 0.9 meters below the surface.2.2, the foundation treatment requirements of the building features is th
12、e large upper load, and the soil is weak; basic form of residential building drawings for raft foundation requirements 150kPa value for the bearing capacity of the foundation, not up to the value of 110kpa bearing standard test foundation construction site foundation bearing capacity; allowable sett
13、lement is less than 200mm; the owners required to reduce the cost of foundation treatment as much as possible.2.3, treatment options, Nanpu district on this kind of foundation often use prefabricated pile or cast-in-place pile, the survey unit also suggested the use of cast-in-place pile, the projec
14、t department to make the foundation treatment scheme. After Party A, design, supervision, construction and management departments of the various arguments, research and comparison of the cost of the program shows that the final selection of our ground treatment program. It is applicable to reinforce
15、 the soil with cement injection pile. The mixing pile is more economical than the cast-in-place pile and has less influence on the surrounding environment.2.4. Design and design of composite foundation of powder injection pile, effective pile length L=5.5m, pile diameter 0.5m, plus solid chamber com
16、pressive strength is 2Mpa (through laboratory test to determine cement mixing ratio is 15%). From the literature 1 (9.2.2-2), (9.2.2 - 3) calculate the bearing capacity of a single pile Rke=140KN; according to (9.2.2-1) formula can be calculated: the replacement rate of residential buildings m=0.3,
17、according to the layout of the pile, the pile used in rectangular form.2.5, construction methods, spraying the use of curing agent for P.O32.5 ordinary portland cement, the use of domestic PH-5A type powder injection pile machine construction.(1) the site shall be leveled before the construction, th
18、e pile location shall be determined and numbered, and the assembling frame shall be provided with a powder injection pile machine to check whether the main engine and other systems are working properly.(2) according to the layout plan of pile location, row number of pile and construction flow sectio
19、n, the moving mixing main machine aims at the design pile position.(3) turn on the mixer after drilling into the 50cm, while drilling with the jet, pay attention to prevent the clogging of the powder injection hole, with the drill pipe drilling, reinforcement soil in situ stirring, chopping, drillin
20、g to the design depth, stop drilling.(4) when the drill pipe is drilled to the design depth, it rotates backward, starts the cement transmitting device, raises the side of the drill pipe to stir, and the hoisting speed should be less than 1m/min, and the forced powder is stirred with the soil in sit
21、u. When the drill is raised to about 2m of the top of the pile, the hoisting speed should be reduced. Lift to more than the design height of 30-50cm, turn off the cement transmission device, the rig rotates in situ, 1min, continue to ascend to the ground. Dusting Pile requires one go, without interr
22、uption, jet pressure control in 0.5-0.8N/MM2. in order to improve the strength of the pile and the bearing capacity, to avoid uneven mixing, then was stirred 1 times in the original pile length, the pile body is completed.2.6, to ensure the strength and integrity of the pile, the key lies in the amo
23、unt of powder control and mixing is even, in view of this situation, the construction of the following measures taken.(1) adopt one spray four stirs craft, its process is as follows. Measuring unreeling machine in place pile drilling in the end (jet) - boot - top (powder) - reverse lifting forward r
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 水泥 粉喷桩 地基 处理 中的 应用 Application of cement powder spraying pile in foundation treatment
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【人****来】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【人****来】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。
链接地址:https://www.zixin.com.cn/doc/4015375.html