英文版IT项目管理论文.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 英文 IT 项目 管理 论文
- 资源描述:
-
Project management case studies and learning experience 1 Introduction to Project Management Project management is the application of knowledge, skills, tools and techniques to project activities to meet the needs of the project. The project manager should not be confined to trying to meet the specific scope of the project, time, cost and quality objectives, as well as the need to promote the whole process to meet the needs and expectations of the project activities involve or affect. 1.1 Project Integration Management Project Integration Management is the entire life cycle of the project, bringing together the knowledge areas of project management, integration execution and control of all project plans to ensure that all the work and activities of the various elements of the project coordinated. Integrated management of the project from a global, integrated view through the various elements of the organic coordination of the project (schedule, cost, quality and resources), trade-offs and choices, the specific objectives and programs of the mutual influence of the project to eliminate as much as possible the limitations of the individual management of the project, in order to achieve the maximum to meet the needs of the project stakeholders and the purpose of the hopeful. 1.2 Project Scope Management The scope of the project management affect the success of information systems projects. In practice, the "demand spread" is one of the most common causes of information systems failure, information systems projects are often started in the project, plan, execute, or even end, constantly adding new features, whether it is the customer's requirements or project staff on the new the test of the technology, may lead to uncontrolled information system project scope, so that the information system projects have been severely affected in terms of time, resources and quality. 1.3 Project Time Management The primary task of project management is to develop an idea of a good project plan to determine the project's scope, schedule, and cost. The completion of the project in the given time the important binding targets of the project, and the ability to deliver progress is an important measure of project success flag. Therefore, progress control project control is the soul of the project. Project management with a creative process, project uncertainty is large, the control of the progress of the project is the most difficult in the project management. 1.4 Project Cost Management The cost of the project is the sum of the whole process of the project cost of the various costs. Cost management of the project is very important for the organization, cost management is not just the cost of the project monitoring and recording, but the need for cost data analysis to discover the pitfalls and problems of the project's cost, suffered a possible loss in the project take the necessary action. The project cost management hopes to save the cost of the project, but that does not mean to blindly reduce costs. For example: In the information systems project, reducing test can undoubtedly reduce the cost of the project, but not tested, like many information systems have been, as a test, may have disastrous consequences for the project, and ultimately, or makes the cost of the project was greatly enhanced, or project to the brink of failure. 1.5 Project Quality Management Quality is the entity to meet the characteristics of explicit or implicit demand capacity sum, express or implied demand according to the needs of the project to develop the foundation documents. Information system project, the general system requirements specifications as the foundation documents of the project requirements. Quality management as part of the project management has a very important position. Quality management, quality management process through the implementation of the project, using some basic project management tools and techniques to ensure the quality of the information system. Time, cost, and quality are the three main objectives of the project management, if the quality can not meet the requirements, even if the progress is even faster, cost savings, the project does not make sense. 1.6 Project Human Resource Management The people decided the key to the success of organizations and projects. Especially in the field of information systems, the qualified candidates is difficult to find and retain a project. Effective management of human resources, project managers think the most difficult thing. Project Human Resource Management for the most effective use of the process involved in the project staff. It includes all stakeholders of the project, as patrons, customers, partners, suppliers / subcontractors, project team members. Discussion of patron, partner, customer management is beyond the scope of this chapter, the chapter will focus on the project team of human resource management. Project Human Resource Management, including the preparation of three main process of the formation of the project team and project team building. The main content of the human resources planning, including the identification, recording and distribution project roles, responsibilities, consult reporting relationships, the output of this process, including the allocation of roles and responsibilities matrix reporting relationships, as well as the project's organizational structure; project team formed mainly recruitment and human resources needed assigned to the project work, project personnel is key to the success of the information system project; project team building, including the training of the project team the ability of the individual and the collective, in order to improve the performance of the project. For many information system projects, whether training team and collective capacity, is also the success of the project to be considered one of the factors. 1.7 Project Communications Management Communication is passed between interpersonal and communication of information is essential to success of the project, but also very important. The main purpose of the communication interaction the two sides to establish a relationship of mutual understanding of each other and respond to each other, and look forward to each other through the act of communicating with the process of acceptance and reach a consensus. Information system project, the communication between the project stakeholders throughout the entries from the entire life cycle, many experts believe that an important reason for the information systems project failure is the failure to communicate. 1.8 Project Risk Management The projects need to achieve the project objectives within a limited time at a limited cost, risk will affect it. The purpose of risk management is to minimize the negative impact of the risk on the project objectives, to seize the opportunity of the risks and increase the project stakeholders income. Must be assessed as project management, project risks, develop risk response strategies, and targeted allocation of resources, and develop plans to ensure that the project smoothly. 1.9 Project Procurement Management Project Procurement is the process of the products and services needed to purchase items from outside the project. The procurement process involves both have different goals or more parties, the mutual influence of the parties under certain market conditions and constraints. Through procurement management and operation of processes and standardization, to reduce costs and increase the role of profit. Project procurement management process including procurement plan, contract preparation, tendering, supplier selection, contract management and contract closeout, etc.. 2 IT Project Management Case Study 2.1 Case Scenarios A regional government departments to build a comprehensive network applications-oriented restructuring and consolidation of the existing distribution of multiple management systems and services on each server platform, the entire project by the government's information department in charge of unified planning, phased construction, the leading group composed by the principal leaders of various build units, tender to select an IT technology company responsible for the construction of the system. 2.2 Case Study The needs analysis can be broadly divided into three steps. (1) demand for the collection of information. (2) demand information analysis finishing, finishing work to do analysis of the collected information. (3) needs assessment information. Every stage of the development process to go through the review, confirm that the task is completed, to avoid errors and omissions or corrective work. The needs assessment by produce specification is a sign of the end of the requirements analysis phase, 'This review may result in the needs analysis process backtracking, even repeated. However, we must let the expected target to achieve, to the requirements analysis phase of the work was temporarily a paragraph. From a customer perspective, identifying needs is the first activity of the project initiation process and throughout the project life cycle, customers by identifying the business or market demand, the opportunity to determine the direction of investment and project opportunities, in the process, will give the project objectives,feasibility analysis and project to provide direct and effective basis for the writing of the book provide a basis for the request for proposal. From the point of view of the construction side, identifying needs is to get the customer's request for proposal, or just to get the initial customer demand intention, the project team angle to identify the actual problems of the customers from the technology, application and project implementation, the basic intent and trueideas, so as to achieve effective communication with customers, an accurate analysis of the needs and problems, and to devise a feasible and reasonable, the right technology and provide the basis for the implementation of the solution. Started early in the software project, the user will be presented to the developer described demand content including: preliminary outlook of the target product description of the work environment and the user of the target product, aimed solely to explain their needs to the developers. Requirements specifications and requirements description is completely different, it is by software developers formed after the needs analysis document, its content is more systematic, accurate and comprehensive. Software testing is a planned, organized and systematic software quality assurance activities, rather than casual, loose, messy implementation process. In order to regulate the content of software testing, methods and processes, to test the software before, you must create a software test plan. Software test plan is a programmatic document guiding the testing process includes product overview, test strategies, test method, the test area, the test configuration, the contents of the test cycle, test resources, test the exchange, risk analysis. With the software test plans, project members involved in the testing, especially test managers can explicitly test task and test methods to maintain test implementation process smooth communication, tracking and control the progress of the test and respond to various changes in the testing process. The division of the testing phase should be divided with the development phase corresponding needs analysis corresponding confirmation test, corresponding to the outline design integration testing with the detailed design of the corresponding unit test. Unit test module testing usually placed in the coding phase, to complete the test after he wrote the module code in this module, check whether it implements the module functions and algorithms specified in the detailed design specification by the programmer. The unit tests to verify the correctness of the detailed design (each module) test, usually done by members of the development group's self-test and cross test. General testing process for the: writing software unit test instructions, software unit testing, writing software unit test reports. In addition to unit testing, integration testing and validation testing. Integration testing, also known as assembly and testing in the development environment, validate to outline design correctness test. Integration testing in accordance with the test plan and use cases, completed by a member of the test group. Confirmation test in the operating environment, user participation tests verify the correctness of requirements specifications, a major test software functionality and user needs are the same. 3 IT Project Management Learning Experience The learning experience sum up in the following points: 1) Project management just begun our side, think project management is the project manager of a project to project involves work resources to effectively manage. Project management only superficial understanding should be based on correct understanding of IT projects targeting system management method, the high efficiency of the project through a temporary flexible organization, specialized in the process of learning, however, gradually found coordination and optimization plan, organize, direct and control, in order to achieve the dynamic management of the whole process of the project and the project objectives. 2) Team is the success of the project management environment good project team, there should be a common recognition of a clear goal, a reasonable division of labor, good communication between team members trust each other and can actively participate in the team. We usually work in our company is a large project team, each department and each job group is a small project team. 3) The project manager is the the soul project manager of the project management is a project management role, it is the responsibility of people to achieve the project objectives and, at the same time is the heart and soul of a team. The project manager is not necessarily the strongest people in the team, but it is the most significant responsibility. He should have strong willpower, cohesion, compressive strength, will not easily be outside world and the influence of others. 4) Communication is bridge project management bridge communication is essential to the success of the project. Work to do at each stage of the project to achieve the desired results, it is necessary to establish channels of communication between the internal project team and the project team and the external environment, the rapid and accurate transmission of information so as to achieve the harmonization of the members; clear project members their respective responsibilities, to understand the contribution of their work done by the achievement of project objectives. This is what I learned in展开阅读全文
咨信网温馨提示:1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前可先查看【教您几个在下载文档中可以更好的避免被坑】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时联系平台进行协调解决,联系【微信客服】、【QQ客服】,若有其他问题请点击或扫码反馈【服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【版权申诉】”,意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:0574-28810668;投诉电话:18658249818。




英文版IT项目管理论文.doc



实名认证













自信AI助手
















微信客服
客服QQ
发送邮件
意见反馈



链接地址:https://www.zixin.com.cn/doc/3675441.html