1、Designation:A 796/A 796M 06Standard Practice forStructural Design of Corrugated Steel Pipe,Pipe-Arches,and Arches for Storm and Sanitary Sewers and OtherBuried Applications1This standard is issued under the fixed designationA 796/A 796M;the number immediately following the designation indicates the
2、yearof original adoption or,in the case of revision,the year of last revision.A number in parentheses indicates the year of last reapproval.A superscript epsilon(e)indicates an editorial change since the last revision or reapproval.1.Scope*1.1 This practice covers the structural design of corrugated
3、steel pipe and pipe-arches,ribbed and composite ribbed steelpipe,ribbed pipe with metallic-coated inserts,closed rib steelpipe,composite corrugated steel pipe,and steel structural platepipe,pipe-arches,and underpasses for use as storm sewers andsanitary sewers,and other buried applications.Ribbed an
4、dcomposite ribbed steel pipe,ribbed pipe with metallic-coatedinserts,closed rib steel pipe,and composite corrugated steelpipe shall be of helical fabrication having a continuouslockseam.This practice is for pipe installed in a trench orembankment and subjected to earth loads and live loads.Itmust be
5、 recognized that a buried corrugated steel pipe is acomposite structure made up of the steel ring and the soilenvelope,and both elements play a vital part in the structuraldesign of this type of structure.This practice applies tostructures installed in accordance with Practice A 798/A 798Mor A 807/A
6、 807M.1.2 Corrugated steel pipe and pipe-arches shall be of annu-lar fabrication using riveted or spot-welded seams,or of helicalfabrication having a continuous lockseam or welded seam.1.3 Structural plate pipe,pipe-arches,underpasses,andarches are fabricated in separate plates that,when assembled a
7、tthe job site by bolting,form the required shape.1.4 This specification is applicable to design in inch-poundunits as A 796 or in SI units as A 796M.Inch-pound units andSI units are not necessarily equivalent.SI units are shown inbrackets in the text for clarity,but they are the applicablevalues whe
8、n the design is done per A 796M.1.5 This standard does not purport to address all of thesafety concerns,if any,associated with its use.It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations
9、 prior to use.2.Referenced Documents2.1 ASTM Standards:2A 760/A 760M Specification for Corrugated Steel Pipe,Metallic-Coated for Sewers and DrainsA 761/A 761M Specification for Corrugated Steel Struc-tural Plate,Zinc-Coated,for Field-Bolted Pipe,Pipe-Arches,and ArchesA 762/A 762M Specification for C
10、orrugated Steel Pipe,Polymer Precoated for Sewers and DrainsA 798/A 798M Practice for Installing Factory-Made Corru-gated Steel Pipe for Sewers and Other ApplicationsA 807/A 807M Practice for Installing Corrugated SteelStructural Plate Pipe for Sewers and Other ApplicationsA 902 Terminology Relating
11、 to Metallic-Coated Steel Prod-uctsA 978/A 978M Specification for Composite Ribbed SteelPipe,Precoated and Polyethylene-Lined for Gravity FlowSanitary Sewers,Storm Sewers,and Other Special Appli-cationsA 1019/A 1019M Specification for Closed Rib Steel Pipewith a Diameter of 36 in.900 mm or Less,Poly
12、merPrecoated for Sewers and DrainsA 1042/A 1042M Specification for Composite CorrugatedSteel Pipe for Sewer and DrainsD 698 Test Method for Laboratory Compaction Character-istics of Soil Using Standard Effort(12 400 ft-lbf/ft3600kNm/m3)D 1556 Test Method for Density and Unit Weight of Soil inPlace b
13、y the Sand-Cone MethodD 2167 Test Method for Density and Unit Weight of Soil inPlace by the Rubber Balloon MethodD 2487 Classification of Soils for Engineering Purposes(Unified Soil Classification System)D 2922 Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods(Shallow D
14、epth)1This practice is under the jurisdiction of ASTM Committee A05 on Metallic-Coated Iron and Steel Products and is the direct responsibility of SubcommitteeA05.17 on Corrugated Steel Pipe Specifications.Current edition approved May 1,2006.Published June 2006.Originallyapproved in 1982.Last previo
15、us edition approved in 2004 as A 796/A 796M-04a.2For referenced ASTM standards,visit the ASTM website,www.astm.org,orcontact ASTM Customer Service at serviceastm.org.For Annual Book of ASTMStandards volume information,refer to the standards Document Summary page onthe ASTM website.1*A Summary of Cha
16、nges section appears at the end of this standard.Copyright ASTM International,100 Barr Harbor Drive,PO Box C700,West Conshohocken,PA 19428-2959,United States.D 2937 Test Method for Density of Soil in Place by theDrive-Cylinder Method2.2AASHTO Standard:Standard Specifications for Highway Bridges32.3F
17、AA Standard:AC No.150/53205B Advisory Circular,“Airport Drain-age,”Department of Transportation,Federal AviationAdministration,197043.Terminology3.1 General DefinitionsFor definitions of general termsused in this practice,refer to Terminology A 902.For defini-tions of terms specific to this standard
18、,refer to 3.2.3.2 Definitions of Terms Specific to This Standard:3.2.1 bedding,nthe earth or other material on which thepipe is laid,consisting of a thin layer of imported material ontop of the in situ foundation.3.2.2 haunch,nthe portion of the pipe cross sectionbetween the maximum horizontal dimen
19、sion and the top of thebedding.3.2.3 invert,nthe lowest portion of the pipe cross section;also,the bottom portion of the pipe.3.2.4 pipe,na conduit having a full circular shape,or in ageneral context,all structure shapes covered by this practice.3.2.5 pipe-arch,na pipe shape consisting of an approxi
20、-mate semi-circular top portion,small radius corners,and largeradius invert.3.2.6 arch,na pipe shape that is supported on footingsand does not have a full metal invert.4.Symbols4.1 The symbols used in this practice have the followingsignificance:A=required wall area,in.2/ft mm2/mm(AL)=maximum highwa
21、y design axle load,lbf NCl=longitudinal live load distribution factor for pipearchesd=depth of corrugation,in.mmE=modulus of elasticity=29 by 106lbf/in.2200 by103MPa(EL)=earth load,lbf/ft2kPa(FF)=flexibility factor,in./lbf mm/Nfy=specified minimum yield strengthFor 6 by 2in.150 by 50mm corrugationTy
22、pe 33=33 000 lbf/in.2225 MPaType 38=38 000 lbf/in.2260 MPaFor 15 by 512in.380 by 140mm and 16 by 6in.400 by150mm corrugations=44 000 lbf/in.2300 MPaFor all other corrugations=33 000 lbf/in.2225 MPafu=specified minimum tensile strengthFor 6 by 2in.150 by 50mm corrugationType 33=45 000 lbf/in.2310 MPa
23、Type 38=48 000 lbf/in.2330 MPaFor 15 by 1512in.380 by 140mm and16 by 6in.400 by 150mm corrugations=55 000 lbf/in.2380 MPaFor all other corrugations=45 000 lbf/in.2310 MPafc=critical buckling stress,lbf/in.2MPah=height of cover,in.mm determined as fol-lows:(1)highwaysfrom top of pipe to topof rigid p
24、avement,or to top of subgrade forflexible pavement;(2)railwaystop of pipeto bottom of tieH=depth of fill above top of pipe,ft mHmin=minimum depth of fill,ft mHmax=maximum depth of fill,ft mI=moment of inertia of corrugated shape,in.4/in.mm4/mm(see Tables 1-34)(IL)=pressure from impact load,lbf/ft2kP
25、ak=soil stiffness factor=0.22 for good side-fillmaterial compacted to 90%of standard den-sity based on Test Method D 698L1,L2,L3=loaded lengths,in.mm defined in 18.3(LL)=pressure from live load,lbf/ft2kPaP=total design load or pressure,lbf/ft2kPaPc=corner pressure,lbf/ft2kPaPf=factored crown pressur
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- A0796_A0796M 06 雨水管 卫生 污水 及其 地下 埋设 管道 波纹 钢管 托架 拱形 结构设计 惯例
![提示](https://www.zixin.com.cn/images/bang_tan.gif)
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【Fis****915】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【Fis****915】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。
链接地址:https://www.zixin.com.cn/doc/364982.html