1、WEEKLY REPORT周报PERIOD OF ACTIVITY日期:04/04/2014-10/04/2014REPORT NO.报告号: WPR 14-15 1. SITE ACTIVITIES THIS WEEK本周工作1) There are 19 persons of BV safety team on site for this week. 本周现场有19名BV安全管理人员。2) Provide safety induction and safety training for contractors 93 workers this week, and sum up to 1882
2、 people for induction. 本周培训了93名入场人员,累计已培训入场人员1882人.3) Jobsite inspection for potential hazards is 218 with an decrease of 50 hazards than 268 last week, workers number has 2.3% increase more than last week, total work hours increases 5.25% to the previous week. Number of potentials gets to 142 cases
3、, with an decrease 17 than last week that indicates some improvements. 现场检查发现了218个隐患,比上周的268减少50个。本周总工时数比上周增加了5.25%,隐患数量减少了18.6%, 整体情况有所改善。隐患数量主要分布在涂装车间达到142个,占总数的60.55%。但涂装本周比上周159个减少17个,也有所改善。4) Take part in the safety walk which organized by client and make the inspection record which was follow
4、up by BV. 参加了业主组织的综合大检查,并形成了检查记录,进行了隐患跟踪。5) One near miss this week. 本周发生险肇事件1个。 6) Have performed checks at all workshops temporary electricals and corrected non-conformity of electrical boxes and connection. To conduct re-permit of all 1-2 levels temporary electrical boxes with new checklists and
5、labels signed for approval as per local codes. 在全部车间开展了临时电气和线路的安全检查并进行纠正。对1-2级电箱安全规范重新签字批准贴许可证和标志。Confiscated 9 extinguishers of non-conformity from several contractors. 收缴了各承包商使用的不合格灭火器9个。7) Have organized all workshop civil contractors safety meeting and will have weekly civil contractors meeting
6、every Tuesday afternoon. 本周组织了车间内施工的土建单位安全会议,并将在每周2下午开安全周会。8) Body & welding shop did evacuation drill. 焊装车间进行了疏散演习。9) 本周抽查了265承包商员工的出入证,发现有5个人员存在无证、出入证过期、人证不符等问题。2. MAIN ACTIVITIES NEXT WEEK 下周工作重点1) There are 19 engineers on site work for next week.下周有19个工程师在现场工作. 2) To raise safety level of all w
7、orkshop civil contractors temporary electrical and construction activities, further improve all contractors electrical safety. 加强车间土建单位的临时用电和作业的安全管理,完善车间内全部单位的临时用电的安全管理规定。3) Continue to apply all commissioning contractors Lockout Tagout rules. 继续推动设备调试作业挂牌、上锁制度。4) 继续对在车间内施工的土建单位进行安全培训,特别是在车间内的临时用电进行
8、安全管理,以及高空作业等其它现场作业活动的严格控制管理。Continue safety training on the civil activities inside the workshops, including temporary electrical power, work at height ect. 5) To be well prepared for coming rainy season electrical safety compaign. 对车间内各个施工单位在即将到来的梅雨季节的安全用电进行预备控制措施.6) To check all entry cards of con
9、tractors and disposals to non-compliance of security management. 对承包商员工的出入证进行抽查,并对发现的问题进行处理。7) 其它业主要求的重点工作 Others key points required by the client. 3. SAFETY, HEALTH AND ENVIRONMENTAL STATUS 现场安全状态; 10)11)12)1) Safety Man-hours Record 安全工时记录Work Days施工天数 Safety Work Record安全施工记录Safety Work Days安全施工
10、天数Total Safety Man-hours总工时Weekly Safety Man-hours本周工时Accident Loss Rate of 200000 Safety Man-hours 20万工时事故损失率Press workshop冲压车间8080804436440820Body workshop焊装车间808080114510110000Paint workshop涂装车间808080339044566200T&F总装车间8080806165068880Quality & Trial-produce质量和试制车间80808073792920Total 808080573294
11、7888202) Accident Records事故记录:Safety Statistics安全统计Near miss未遂事故First Aid现场急救Medical医疗处理Lost Time工时损失Injuries轻伤 Fatal 重伤及以上Safety Days安全施工周期This Week1000To Date180003) Accident Reports事故报告: One case of near miss: 一起未遂事件:Date日期Accident and Loss Description 事故过程和损失描述Root Cause and Preventive measures事
12、故原因和预防措施10/4While setting up vent ducts Sinoconstruct site a standing tubing fell down to the ground without personnel injury or loss. 中建安装在焊装车间安装风管时,一根立管倾倒,未造成人员伤害和其它损失。Incident causes: operation method is not a correct one. 事件原因:操作方法不合理。Preventive measures: To conduct training to the relevant work
13、ers. 预防措施:对员工进行教育。4) The line chart about the amount of weekly man-hours and the Accident Loss Rate of 200000 Safety Man-hours 每周工时数量与20万工时事故损失率的拆线图4. SITE MANPOWER 现场人员投入DATEFri.(21/3)Sat(22/3)Sun(23/3)Mon.(24/3)Tue. (25/3)Wed.(26/3)Thu.(27/3)Average平均数Trend增减趋势Press workshop冲压车间7257414669756461Bod
14、y workshop焊装车间235224235229241248266240Paint workshop涂装 车间951961888996931925994949T&F总装车间140137141149153148148145Quality & Trial-produce质量中心和试制车间32100052Total总人数140113811306142013941396148313975. Site HSE training statistic 现场安全培训统计Training time Statistic培训课时Trainee Statistic受训人员统计Training Hours培训学时W
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EHSEenvironmentHhealthSsafety 环境 职业 健康 安全 周报 每周 报告 模板
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【天****】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【天****】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。
链接地址:https://www.zixin.com.cn/doc/3396757.html