    目      录 一、 工程概况 ····················································································2 二、 编制依据 ····················································································2 三、 卸料平台设计 ···········································································2 (一)计算书 ·······················································································3 1、次梁的计算 ·····················································································3 2、主梁的计算 ················································································· 5 3、钢丝拉绳的内力计算 ········································································9 4、钢丝拉绳的强度计算·········································································10 5、钢丝拉绳吊环的强度计算 ······························································10 四、 卸料平台制作和安装 ································································11 五、 卸料平台的检查和验收 ··························································· 12 六、卸料平台安全管理措施 ······························································12 七、附 图 ····························································································13 1、卸料平台平面布置图 2、卸料平台立面图 3、卸料平台剖面图 4、节点详图 卸料平台专项施工方案 一、 工程概况 工程名称:德信·上湖名院工程 建设地点:合肥市经济开发区北临书箱路,西邻松林路 项目业主:合肥德合置业有限公司 设计单位:安徽省城乡规划设计研究院 监理单位: 安徽省建设监理有限公司 勘察单位: 合肥建设工程勘察院 质量安全监督站: 合肥市建筑工程质量安全监督站经济开发区分站 施工单位:浙江东阳第三建筑工程有限公司 拟建的上湖名院工程±0.000相对于绝对标高43.000米(吴淞高程系)。总用地面积:13257平方米,总建筑面积:53404平方米,地下建筑面积:4589.3平方米。其中1号楼建筑面积:12124平方米,2号楼建筑面积:12242平方米,3号楼建筑面积12100平方米,4号楼建筑面积12249平方米。地下室一层高5.8米,一层高5.4米,标准层层高2.9米。结构形式剪力墙结构,建筑物高度98.9米,一类建筑,地下耐火等级二级,建筑设计使用年限50年。建筑防水等级二级,抗震烈度7度。 根据本工程特点,拟在5轴-6轴间设立一卸料平台,平台根据结构施工进度逐层提高。 二、编制依据 1、设计施工图纸 2、《建设施工高处作业安全技术规程》JGJ80-91 3、《建筑施工安全检查标准》JGJ59-99 4、《施工手册》(第四版) 5、《建筑结构荷载规范》GB50009-2023 6、《钢结构设计规范》GB50017-2023 7、合质建(2023)15号文献 8、集团公司CIS形象设计标准 三、卸料平台设计 根据本工程的特点,决定采用悬挑式卸料平台,平台平面布置在5轴-6轴间。平台尺寸为4.5m×2.5 m×1.2m。详见附表:悬挑式卸料平台型号及材料选用表。 序号 平台尺寸(长×宽×高) 主梁锚固长度(mm) 主梁槽钢 次梁槽钢 钢丝绳 限载 型号 间距 型号 间距 直径(mm) 1 4.5m×2.5m×1.2m 1500 [16a 2500 [10 500 20 1吨 主梁、次梁分别采用16a号槽钢、10号槽钢,次梁间距500 mm。所有构件采用焊接。防护栏采用Ø48×3.5钢管,平台栏杆下方固定,设18cm高用模板制作的踢脚板。踢脚板外侧面及防护栏均刷黄黒相间的油漆标记,四周用模板封闭。平台每侧设两根6×37Ф20钢丝绳,每根绳夹具不少于3个。钢丝绳通过梁上面预埋Ф20圆钢吊环拉接,两边各预埋长度为35d,并压入梁主筋内部。但两根丝绳不得拉结于同一对拉环上。平台底面设4mm厚钢板做脚手板,满铺、铺牢。具体如附图。 水平钢梁与楼板压点采用Φ16圆钢拉环,拉环压在楼板下层钢筋下面,并要保证两侧30cm以上搭接长度。 卸料平台限载10KN(1吨)。 (一) 验算 平台水平钢梁(主梁)的悬挑长度4.50 m,悬挑水平钢梁间距(平台宽度)2.50 m。 次梁采用[10号槽钢,主梁采用[16a号槽钢,次梁间距0.50m。最大堆放材料荷载8.00kN/m2。 1、次梁的计算 次梁选择[10号槽钢槽钢,间距0.50m,其截面特性为 惯性距Ix=198.3cm4,转动惯量Wx=39.7cm3, [f] = 215.00N/mm2; E=206×103N/mm2 截面尺寸 b=63.0mm,h=160.0mm,t=10.0mm 1) 荷载计算 (1)钢板自重:3mm×78KN/m2=0.234KN/m2 Q1 = 0.234×0.50=0.117kN/m (2)槽钢自重荷载 Q2=0.1kN/m (3)最大活荷载取2.5kN/m2; Q3 =2.5×0.50=1.25kN/m 经计算得到,静荷载计算值 q = 1.2×(Q1+Q2)+1.4×1.25 ×1.2= 2.36KN.m 2) 内力计算 内力按照集中荷载P与均布荷载q作用下的简支梁计算,计算简图如下 最大弯矩M的计算公式为 M=0.125ql2=0.125×2.36×2.52=1.84KN/m 3) 抗弯强度计算 其中 x —— 截面塑性发展系数,取1.05; [f] ——[10号槽钢抗压强度设计值,[f] = 215.00N/mm2; 通过计算得到强度 =1.84×106/(1.05×39700.00)=44.14N/mm2; 次梁槽钢的抗弯强度计算 < [f],满足规定! 挠度w=5ql4/384EI=5×44.14×25004/384×206×103×198.3×104=5.4mm<l/250=2500/250=10mm 满足规定 2、主梁的计算 卸料平台的内钢绳按照《建筑施工安全检查标准》作为安全储备不参与内力的计算。 主梁选择[16a号槽钢槽钢,其截面特性为 面积A=21.95cm2,惯性距Ix=866.20cm4,转动惯量Wx=108.30cm3,回转半径ix=6.28cm E=206×103N/mm2 1)荷载计算 钢板自重和最大活荷载 (1)0.234×1.2+2.5×1.4=3.78KN/m2 (2)9根次梁总重1.2×0.1KN/m×2.5×9/4.5m×2.5m=0.24KN/m2 化为线荷载 (3.78+0.24)×2.5/2=5.05KN.m (3)栏杆自重1.2KN.m (4)槽钢自重Q2=0.2 kN.m 荷载计算值 q = 5.05+1.2+0.2=6.45KN.m M支=1/2×6.45×0.52=0.8 kN.m M中=1/8×6.45×3.52=9.87KN.m 钢丝绳吊环离糟钢外端1000mm,该处支点反力为 R=6.45×(3.5/2+0.5)=14.51KN 钢丝绳长度= 6.42+3.52开根号=7.29米 角A=520 钢丝绳拉力T=R/sinA=14.51/0.88=16.49KN 主梁承受轴向压力N N=TcosA=16.49×0.615=10.14KN 3) 抗弯强度计算 其中 x —— 截面塑性发展系数,取1.05; [f] —— 钢材抗压强度设计值,[f] = 205.00N/mm2; 通过计算得到强度 =9.87×106/1.05×108300.0+10.14×103/2195.0=91.4N/mm2 主梁的抗弯强度计算强度小于[f],满足规定! 4) 整体稳定性计算 其中 b —— 均匀弯曲的受弯构件整体稳定系数,按照下式计算: 通过计算得到 b=570×10.0×63.0×235/(4500.0×160.0×235.0)=0.499 通过计算得到强度 =9.87×106/(0.499×108300.00)=182.6N/mm2; 主梁槽钢的稳定性计算 < [f],满足规定! 3、钢丝拉绳的内力计算 钢丝绳拉力T=R/sinA=14.51/0.88=16.49KN 主梁承受轴向压力N N=TcosA=16.49×0.615=10.14KN 4、钢丝拉绳的强度计算 钢丝拉绳(斜拉杆)的轴力我们均取最大值进行计算,为 T=16.49kN 钢丝绳的允许拉力按照下式计算: 其中[Fg] —— 钢丝绳的允许拉力(kN); Fg —— 钢丝绳的钢丝破断拉力总和(kN); 计算中可以近似计算Fg=0.5d2,d为钢丝绳直径(mm); —— 钢丝绳之间的荷载不均匀系数, 6×37、钢丝绳分别取0.82; K —— 钢丝绳使用安全系数,取10.0。 选择拉钢丝绳的破断拉力要大于 0.82×16.49/10=13.52kN。 选择6×37钢丝绳,钢丝绳公称抗拉强度1770MPa,直径20mm,最小破断拉力208KN。能满足规定。 5、钢丝拉绳吊环的强度计算 钢丝绳下吊环选用Q235Ф20钢筋,截面积A=314㎜2,混凝土梁上吊环选用Q235Ф16钢筋,截面积A=201㎜2,允许抗拉能力分别为 T=314×2×215N/㎜2=135KN>16.49KN T=201×1.6×215N/㎜2=69.14KN>16.49KN 能满足规定。 6、焊接验算 钢丝绳下接点穿绑在Ф20钢筋吊环上,角度大于45度,吊环焊在16糟钢腹板上,腹板厚6㎜,焊缝高取5㎜、长取100㎜(实际焊缝长150),按角焊缝验算 N/Lt≤ƒ(焊缝抗拉强度取160N/㎜2) 16.49×103/100×5=32.98/㎜2 满足规定 四、卸料平台制作与安装 1、 制作规定 1.1 卸料平台主、次梁连接采用焊接,规定焊缝饱满,无夹渣、咬肉。焊缝高度10mm。 1.2 卸料平台所用材料均需有合格证,并符合相关规范规定。 2、安装规定 2.1 缷料平台加工制作完毕经验收合格后方可吊装。 2.2 吊装时,先挂好四角的吊钩,传发初次信号,但只能稍稍提高平台,放松斜拉钢丝绳,方可正式吊装,吊钩的四条引绳应等长,保证平台在起吊过程中平稳。吊至预定位置后,先将平台槽钢与预埋件固定后,再将钢丝绳固定。紧固螺母及钢丝绳卡子,完毕后方可松塔吊吊钩. 2.3 缷料平台的限重牌应挂在该平台附近的明显位置。规定提高一次验收一次。 2.4 卸料平台安装前由项目技术负责人进行安全技术交底,并履行签字手续。 2.5 安装人员必须通过专业培训及考试合格,持证上岗,并定期进行体检。 2.6 卸料平台安装时,钢丝绳应采用专用的挂钩挂牢,采用其他方式时卡头的卡子不得少于三个.建筑物锐利口围系钢丝绳处应加衬软垫物,钢平台外口应略高于内口。 2.7 钢平台吊装时,需待悬挑梁支撑点固定好,接好钢丝绳,调整完毕,经检查验收合格后,方可松卸起重吊钩,上下操作。 2.8 搭拆卸料平台时,地面应设围栏和警戒标志,并派专人看守,严禁非操作人员入内。 五、卸料平台检查和验收 1、 搭设前对材料进行外观和合格证进行检查。 2、 检查制作和安装是否符合设计规定。 3、 使用中加强平常检查,每周检查一次。 4、每次提高后须经专业人员验收合格后方可使用 六、卸料平台安全管理措施 1、卸料平台的上部位结点,必须位于建筑物上,不得设立在脚手架等施工设备上; 2、斜拉杆或钢丝绳,构造上宜两边各设立前后两道,并进行相应的受力计算; 3、卸料平台安装时,钢丝绳应采用专用的挂钩挂牢,建筑物锐角口围系钢丝绳处应加补软垫物,平台外口应略高于内口; 4、卸料平台左右两侧必须装置固定的防护栏,防护栏内侧采用模板封闲并固定,护拦外围用黄黑油漆刷成斜条形警示色。 5、搭设人员必须戴安全帽、系安全带、穿防滑鞋。 6、钢丝绳与水平钢梁的夹角最佳在45-60度; 7、卸料平台使用时,应有专人负责检查,发现钢丝绳有锈蚀损坏应及时调换,焊缝脱焊应及时修复; 8、操作平台上应显著标明允许荷载,人员和物料总重量严禁超过设计允许荷载,配专人监督。本工程设计荷载为10KN。 9、不得将模板支架、缆风绳、泵送砼和砂浆的输送管等固定在卸料平台上;严禁悬挂起重设备。 10、当有六级以上大风和雾、雨、雪天气时应停止卸料平台的搭设与拆除作业。雨雪后作业应有防滑措施,并扫除积雪。 6、卸料平台使用中应加强平常维护和安全检查。 七、附 图 1、卸料平台平面布置图 2、卸料平台立面图 3、卸料平台剖面图 4、节点详图 1、卸料平台平面布置图 3、卸料平台立面图 卸料平台补充方案 根据合肥市建设委的有关文献卸料平台构造:钢板采用4mm厚的印花钢板;吊环采用Ø20的Q235圆钢。 4、钢丝拉绳的强度计算 钢丝拉绳(斜拉杆)的轴力均取最大值进行计算,为 T=16.49kN 钢丝绳的允许拉力按照下式计算: 其中[Fg] —— 钢丝绳的允许拉力(kN); Fg —— 钢丝绳的钢丝破断拉力总和(kN); 计算中可以近似计算Fg=0.5d2,d为钢丝绳直径(mm); —— 钢丝绳之间的荷载不均匀系数, 6×37、钢丝绳分别取0.82; K —— 钢丝绳使用安全系数,取8。 选择拉钢丝绳的破断拉力要大于 0.82×16.49/8=169kN。 选择6×37钢丝绳,钢丝绳公称抗拉强度1770MPa,直径20mm,最小破断拉力208KN。能满足规定。
    展开阅读全文
    提示  咨信网温馨提示:
    1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
    2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
    3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
    4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前可先查看【教您几个在下载文档中可以更好的避免被坑】。
    5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
    6、文档遇到问题,请及时联系平台进行协调解决,联系【微信客服】、【QQ客服】,若有其他问题请点击或扫码反馈【服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【版权申诉】”,意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:0574-28810668;投诉电话:18658249818。

    开通VIP折扣优惠下载文档

    自信AI创作助手
    关于本文
    本文标题:卸料平台施工方案上湖名院.doc
    链接地址:https://www.zixin.com.cn/doc/3323843.html
    页脚通栏广告

    Copyright ©2010-2026   All Rights Reserved  宁波自信网络信息技术有限公司 版权所有   |  客服电话:0574-28810668    微信客服:咨信网客服    投诉电话:18658249818   

    违法和不良信息举报邮箱:help@zixin.com.cn    文档合作和网站合作邮箱:fuwu@zixin.com.cn    意见反馈和侵权处理邮箱:1219186828@qq.com   | 证照中心

    12321jubao.png12321网络举报中心 电话:010-12321  jubao.png中国互联网举报中心 电话:12377   gongan.png浙公网安备33021202000488号  icp.png浙ICP备2021020529号-1 浙B2-20240490   


    关注我们 :微信公众号  抖音  微博  LOFTER               

    自信网络  |  ZixinNetwork