管道工程施工质量管理细则KB.doc
《管道工程施工质量管理细则KB.doc》由会员分享,可在线阅读,更多相关《管道工程施工质量管理细则KB.doc(56页珍藏版)》请在咨信网上搜索。
1、QUALITY MANAGEMENT DETAIL RULES ON PIPING CONSTRUCTION CONTRACT管道工程协议施工质量管理细则协议编号: Number of Contract:目录Content1.0编制目的及合用范围Purpose for Preparation and Scope of Application2.0 编制原则Principles for Preparation3.0 执行标准及有关规定Applicable Standards and Relevant Regulations3.1 中国政府的相关法规和政策Relevant laws, regula
2、tions and policies issued by Chinese government:3.2 SECCO项目IPMT质量体系有关文献Documentation related to IPMT quality system of SECCO project:3.3 SECCO项目IPMT规定和规定IPMT regulations and requirements of SECCO project:3.4 施工验收标准及规范Standards and codes for construction acceptance:4.0 冲突和协调Conflict and Coordination5
3、.0 专业技术经理与专业工程师Specialist Technical Manager and Specialist Engineer5.1 专业技术经理Specialist technical manager5.2专业工程师Specialist engineer6.0HSE7.0 施工过程中工程施工质量的控制Quality Control in the Process of Construction7.1 重要依据Main basis7.2 熟悉现场管理体系、建立工作接口Acquaintance with site management system and establishment of
4、 working interface7.3 技术准备Technical Preparations7.4 组织设计交底Organization Design Briefing7.5 图纸与设计文献会审Joint Check-up of Drawings and Design Documents7.6 审查施工组织设计和施工方案Check-up of Construction Organization Design and Construction Plan7.7 施工过程的质量控制点的制定和检查程序Procedures for the Establishment and Inspection o
5、f Quality Control Points in the Construction Process7.8 施工过程中的质量控制Quality Control During the Construction Process7.8.1 原材料的检查与验收原则Principles for the Inspection and Verification of Raw Materials7.8.2管子抽检的内容和比例Contents and Percentage of Pipe Spot-check7.8.3 其他管道组成件抽检的内容和比例Spot-check Contents and Perce
6、ntage of Other Pipe Components7.8.4 阀门的检查与实验(涉及管道视镜、过滤器及阻火器检查)Valve Inspection and Experiment (Including the inspection of pipe signt glass, strainer and flame arrestor)7.8.5采用的重要管道器材标准(规范)Major Piping Specifications Standards (or codes)7.8.5.1材料标准 Material Standards7.8.5.1.1无缝钢管Seamless Steel Pipe7
7、.8.5.1.2焊接钢管Welded Steel Pipe7.8.5.1.3管件Pipe fittings7.8.5.1.4联接件Pipe joints7.8.5.1.5阀门Valves7.8.5.2应用规范Application specification7.8.5.2.1管子Pipe7.8.5.2.2管件Pipe fittings7.8.5.2.3 联接件Pipe joints7.8.5.2.4阀门Valves7.8.6 管道防腐Pipingcorrosion prevention7.8.7 管道的预制加工工艺Pre-fabrication process for pipe7.8.8 碳素
8、钢管道焊接、热解决及质量检查Welding, heat treatment and quality inspection for carbon steel pipe7.8.9 阀门安装Valve installation7.8.10 低温材料检查及安装Cryogenic material inspection and installation7.8.11 静电接地安装Static grounding erection7.8.12 管道系统实验、吹除与清洗Test, purging and cleaning for piping system7.8.13 工程中间交接Engineering in
9、termediate takeover7.8.14 竣工验收Completion acceptance7.9 专业工程师应保存的资料Documents to be retained by specialist engineer附录1: 管道安装工程质量控制点Appendix 1 Quality Control Points for Piping Installation Project附录2: 工业管道施工管理台帐Appendix 2 Industrial Piping Construction Management Record Book 1.0编制目的及合用范围:Purpose for P
10、reparation and Scope of Application1.1 本规定合用于上海SECCO 90x104t/a乙烯项目(以下简称SECCO项目)的现场施工质量管理工作。These stipulations are applicable to the site construction quality management of Shanghai SECCO 90x104t/a Ethene Project (hereinafter referred to as SECCO project).1.2本规定是为了明确SECCO项目的现场施工质量管理工作的职责、工作内容、工作流程、方法
11、以及设计、采购、施工的协调,推行现代化、科学化、规范化的项目管理模式而编制的。These stipulations are prepared for the purpose of defining the responsibilities, working contents, operating process and procedures for the site construction quality management of the SECCO project and for coordination among the design, procurement and constru
12、ction, so as to pursue the modernized, scientific and standardized mode for project management.2.0编制原则Principles for Preparation2.1 本细则在项目质量管理目的合理分解、项目质量管理组织已经确立的前提下,以项目的规律效应性和操作实用性为原则编制的。These rules are prepared on the principle of the law effectiveness and operating practicability of the project,
13、under the precondition that the objectives of the project quality management have been reasonably decomposed and the organization of project quality management has been established.2.2本细则注意到质量检查评估中工程划分与WBS分解结构在施工管理中的内在联系,我们强调将两者的划分尽量统一。These rules have given full attention to the inherent links betw
14、een the project component division in the quality inspection and evaluation and WBS decomposed structure in the construction management. We emphasize that the two divisions should be unified as far as possible.2.3 为加强积极控制的力度,本细则建议建立专业施工管理台帐,将施工质量控制纳入现场施工管理体系,专业工程师应参与重要的材料和设备的招标订货会议,了解产品质量、协议技术规定、厂家售
15、后服务及到货情况。以便在施工管理台帐中列出每月到货清单,使材料报检及工程报检工作系统化。In order to strengthen the power of active control, it is recommended by these rules that a specialized construction management record book is established to integrate the construction quality control into site construction management system. It is also su
16、ggested that specialist engineers should participate in the bidding and ordering meetings for important materials and equipment to get acquainted with the product quality, the technical requirements of the contract, after-sale service provided by manufacturer and the delivery status. And then it is
17、possible to put the monthly goods-arrival list in the construction management record book and to realize the systematization of material acceptance and engineering inspection procedures.3.0执行标准及有关规定Applicable Standards and Relevant Regulations3.1 中国政府的相关法规和政策:Relevant laws, regulations and policies
18、issued by Chinese government:压力管道安全管理和监察规程Regulations for Pressure Piping Safety Management and Supervision压力管道安装安全质量监督检查规则Rules for Pressure Piping Installation Safety and Quality Supervision and Inspection3.2 SECCO项目IPMT质量体系有关文献:Documentation related to IPMT quality system of SECCO project:规划管理计划(
19、PMP)Program Management Plan (PMP)质量管理策略 Quality Management Strategy质量管理组织体系 Quality Management Organization System工程质量管理规定 Regulations for Project Quality Management质量审核程序 Quality Check Procedures承包商质量(QA/QC)标准Quality Assurance/Quality Control (QA/QC) Standard for Contractors施工管理细则Construction Manag
20、ement Detail Rules3.3 SECCO项目IPMT规定和规定:IPMT regulations and requirements of SECCO project:装置布置原则 Plant Layout Philosophy管道材料规定 Specifications for Piping Materials工艺及公用工程管道设计规定 Process and Utility Piping Design Requirements地下钢管涂层及包覆标准Standard for Coating and Wrapping of Underground Steel Pipe 管道制作 Fa
21、brication of Piping蒸汽伴热管规定Steam Tracing Piping Requirements管道支撑标准 Standard for Piping Support管道柔性-设计标准Piping FlexibilityDesign Criteria管道的现场试压 Field Pressure Testing of Piping隔离材料及应用热保温Insulation Materials & Application -Hot Service隔离材料及应用冷保温Insulation Materials& Application-Cold Service管道及设备的隔音保护So
22、und ControlInsulation of Piping and Equipment标准详图 Standard Detail Drawing管道焊接标准Standard for Piping Welding3.4施工验收标准及规范:Standards and codes for construction acceptance:石油化工剧毒、可燃介质管道工程施工及验收规范Specification for Construction and Acceptance of Hypertoxic and Combustible Medium Piping Engineering in Petroc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 管道工程 施工 质量管理 细则 KB
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【人****来】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【人****来】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。