1、Risk Assessment Part 1: Assessment with existing control measuresABusiness: TURBINE SYSTEMSDepartment: DIMENSIONALDept. no.: 2225Location: PCFActivity (or area) being assessed: Dytel/Moore Vernon GaugesBAssessment ref. no. Date of assessment: 31/03/04Assessor(s)/team: P.REEKG.STICKAS.SARGEANTPeople
2、Rolls-Royce: 8 Frequency/duration: 8hs 3shftsaffected: Others: 0 Frequency/duration: N/A QPeriodic reviews maximum intervals for activities with:Medium risk (but ALARP) - annuallyLow risk - three-yearly1st ReviewDate: 31/03/05Name: P.REEKSigned: 2nd ReviewDate: Name: Signed: 3rd ReviewDate: Name: Si
3、gned: 4th ReviewDate: Name: Signed: DJCEGHHazard(potential for harm)Hazardous event(what happens)Foreseeable cause(cause of hazardous event)F Consequence (outcome)Existing control measures usedProbability1 to 5Risk1 to 25Details of harmValue1 to 5Example: Working at heightFall from ladderLoss of bal
4、anceBroken limbs3Ladder in good condition, at correct angle and tied off39medium1Trapped HandFixture closing on componentsUnsafe working practicesBroken fingers1Safe procedures,Machine integrated122Operation of machineRSIContinuous loading & unloading of componentsWrist & backache2Intermittent break
5、s363Visual imparementExamining results on display screensContinuous use of DSEGradual deteration of eyesight3DSE legislation, not a continuous process264NoiseGeneral factory noiseFinish area extraction & machine noiseGradual hearing impairment3Area is ppe controlled & hearing protection must be worn
6、265Physical injuryDropping of tooling fixturesunsafe working practicesBruises & abrasions, possible broken fingers1Operator training126Hand held tooling vibrationVibration white finger from moving partsContinuous use of air toolsVibration white finger2Annual monitoring OHD26 Risk Assessment Part 2:
7、Assessment of risk reduction actionsLead AssessorAccountable ManagerSignedName (print)PositionDatePMNLK Re-assess risks to show how proposedactions will be effective in reducing the risk.Also consider whether any newhazards will be introduced .Proposed actions(risk reduction measures)Expected risk a
8、ftercompletion of actionsPlanned action completion dateActual completion dateI confirm that the proposed actions havebeen completed and that the expectedrisk reduction has been achievedConsequenceProbabilityRiskNameSignatureDateExample (continued):Use tower scaffold or hydraulic access platform but
9、remember to consider additional hazards326med1/1/200125/12/2000J. BloggsJoe Bloggs26/12/20001 2 3 4 Noise reduction plan in progress0025 6 Better Hand tooling111RConsequenceProbabilityPeopleAssetsEnvironmentReputationIncredibleExtremely unlikely to ever occurImprobableUnlikely but may occur exceptio
10、nallyOccasionalLikely to occur some timeProbableLikely to occur oftenFrequentRegular or continuous occurrence12345Multiple fatalitiesExtensive damageSignificant harm*International impact5HighSingle fatalityMajor damageModerate, long-term harm*National impact4MediumMajor injuryLocaliseddamageModerate
11、, short-term harm*Considerable impact3LowLost time injuryMinor damageLow impact, little harm*LimitedImpact2 First aid injuryNo damageNo impact*No Impact1* Refer to “Environmental Aspects and Impacts Assessment methodology and EnvAID users guide” for explanation of environmental probability and conse
12、quence categories.Page 5Guidance on Completion of Risk Assessment FormBox/ColumnExplanation (for detailed guidance refer to risk assessment guidance document) AProvide details of the activity being assessed and the business and department to which it relates. Where the risk assessment is generic it
13、should be clearly stated.Indicate the people who could be affected (including contractors and the public) and the frequency and duration of exposure precise details are not required.BA unique reference number should be allocated to the assessment, and the date of the initial assessment and the main
14、parties involved should be recorded.CHazard: The hazard is the thing with the potential for harm, such as a flammable substance, rotating machine or deep water. Record all of the significant hazards associated with the activity being assessed. Ignore any trivial hazard.The form provides space for li
15、sting six hazardous events (i.e. outcomes) if more are needed, continue on an additional sheet.Although the risk assessment matrix covers risks to people, assets, environment and reputation, each of these risk areas should be considered separately, e.g. consider environmental hazards independently.D
16、Hazardous Event: Give a very brief description of the hazard scenario or event i.e. what happens that could lead to harm.EForeseeable cause: Record the plausible causes of each hazard being released or the foreseeable causes of exposure to the hazards.E.g. how the substance is released, how a person
17、 becomes trapped in a dangerous machine, how a person comes into contact with deep water.FConsequence: This column is divided into two parts. The first gives brief details of the outcome of the hazardous event, whilst the second part records the value associated with the harm, taken from the risk ma
18、trix. Clearly the description of the harm should relate to the appropriate category in the matrix. First aid injury: local first aid treatment received but no significant lost time.Lost time injury: off-site medical treatment or short-term lost time (e.g. days).Major injury: immediate major trauma l
19、ong-term lost time (e.g. weeks)It is important to be realistic is considering consequence, and although unlikely events should be considered, they should nevertheless be plausible. Note that if there is more than one plausible outcome from a hazardous event, each will need to be considered separatel
20、y.Taken together, columns C to F should provide an understanding of the hazardous event being considered.GExisting Control Measures: The presence of any existing control measures may reduce both the probability of an incident occurring and the scale of the consequences, and should be recorded to ens
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 风险 管理 英文
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【丰****】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【丰****】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。