Commissioning Procedure for Induced Draft Fan System Page: 1 of 14 E07007 Document Class 1 CHENGDA ENGINEERING CORPORATION OF CHINA CHENGDA JOB NO. E07007 A For approval Oct. 20, 2008 Rev. Description Date Prepared Checked Reviewed Approved PT. PLN (PERSERO) OWNER’S DWG. NO. PT. PLN (PERSERO) JASA SERTIFIKASI (LMK) Client’s Project No. PLTU 2 BANTEN-LABUAN (2x300MW) Labuan, Banten, the Republic of Indonesia DWG. NO. E07007-PR-TM-1003 Electronic File Name: Date of Issue: Revision No. Oct. 20, 2008 A This document is restricted. Neither he whole nor any part of this document may be disclosed to any third party without the prior written consent of Chengda Engineering Corporation of China, in which the copyright of this document is vested. All copyrights reserved. Neither the whole nor any part of this document may be reproduced, stored in any retrieval system or transmitted in any form or by any means (electronic, mechanical, reprographic, recording or otherwise) without the prior consent of the copyright owner. 1. Purpose The purpose of this document is to establish the commissioning procedure for IDFbody and its system. Inspect and adjust the IDF body、motor、piping and its accessories, and ensure the running performance of the equipments is normal, control and protection is correct, so that it can satisfy the requirements of running. 2. Reference document Drawing NO:F289S-J0201B-02、F289S-K0201B-05 3. Instrument Pocketable vibration meter: vm-63a; Infrared thermometer: Raytek PM Plus; Digital tachometer: EMT260B; DCS and Local meters for other parameters. 4. Safety precautions 1) Before the commissioning, the principal must instruct all testers to understand the purpose、require、procedure、danger and safety measure of the commissioning, and all testers should know their duty. 2) When coming into construction locale, notice alert mark; prohibit going into ineligible walkway, dangerous work place and non-lighting place. 3) Before the commissioning, assure that all protections are work normally. 4) Verify the earthing of fan motor and safeguard of coupling before start fan. 5) Close the guide blade tightly before startup. 6) Assign a site supervisor and keep away at axial safe zone while running fans. 7) Monitor the motor currents strictly, it is forbidden to work overload. 8) Monitor the parameters of IDF strictly, shut down IDF manually at emergency. 9) While accident shutdown, carry out check only after switching out power and hanging a sign of NO OPERATION. 5. Main equipment specification Fan type AN25e6 Motor type YKK710-6TH Volume flow 282m3/s Total pressure 5756Pa Fan speed 995r/min Motor speed 995r/min Motor output 2100kw voltage 6kV current 238A 6. Pre-Commissioning procedure 6.1. Precondition for pre-commissioning There is turn over package from construction team to commissioning team said that system ready to test. 1) Installation of fan & its auxiliary equipment completed and accepted. 2) Electrical installation finished and protection function is normal. Individual running of fan motor finished with correct rotary direction and startup current record. 3) There is enough lighting at site. 4) Removing of debris and scaffold around fan. There is good covering of trench and no flammables & explosives locally. 6.2. Dampers check The purpose of the inspection is to make sure that the damper can be operated at DCS, and the position of the damper is the same between CRT display and local meter. 1) Full open and full close MV (motor-drive valve) check 2) The blade (control valve) check Refer to appendix 1. 6.3. Function check Function check includes the following items. 1) IDF A #1 cooling fan logical function check 2) IDF B #1 cooling fan logical function check 3) IDF A&B inlet dampers logical function check 4) IDF A&B outlet dampers logical function check 5) IDF A&B inlet connecting dampers logical function check 6) IDF A&B sequence start logical function check 7) IDF A &B sequence stop logical function check 8) IDF logic function inspect 6.4. IDF protection function check Apply the analog signals to every measurepoint; make sure every measure point can work correctly. Refer to appendix 2. 7. Trial operation In principle, the IDF and FDF should running at the same time. 7.1. Necessary precondition check Refer to appendix 3. 7.2. Trial operation process 7.2.1. Cooling fan check and start 1) The piping of the cooling fan system is expedite 2) The inlet valves of the cooling fans should be open. 3) Start up one cooling fan. 4) Turn the linkage switch of the spare cooling fan to “auto” position. 7.2.2. Startup one IDF Start one IDF as its procedure and keep the blade’s opening at 0 percent. Adjust blade according the requirement. 7.2.3. Start up one FDF Start up FDF should according to the commissioning procedure for FDF system and keep opening of 0 percent. Adjust blade as demanding. Keep normal furnace pressure by adjusting guide blade. Check and record the parameters of IDF. 7.2.4. Start up the other IDF and FDF Start the other IDF and FDF, keep normal furnace pressure. The process and parameter monitoring are as above. 7.2.5. Adjust and record of the commissioningfor IDF Adjust guide blade and make the IDF running at a big load state. If IDF can run 8 hours continuously, the commissioning is successful. The commissioning result records are shown in appendix 4. 6.3Adjust and record of the commissioningfor Boiler Unit Startup Necessaryconditions check for IDF commissioning is the same as 6.1. During the commissioningfor boiler unit startup, record the running data of the IDF when the unit load is 0%, 25%, 50% and 100% Appendix I Check list of IDF system dampers 1 (MV) PLTU2 BANTEN-LABUAN(2×300MW) Unit:System name:IDF systemDate: NO. Description Result SUBCON CHENGDA OWNER open close open/close time 1 空预器A进口烟气挡板1 AH A inlet gas damper 1 10HNA10AA001a 2 空预器A进口烟气挡板2 AH A inlet gas damper 2 10HNA10AA001b 3 电除尘A出口烟气挡板1 ESP A outlet gas damper 1 10HNA11AA001a 4 电除尘A出口烟气挡板2 ESP A outlet gas damper 2 10HNA11AA001b 5 引风机A出口烟气挡板1 IDF A outlet gas damper 1 10HNA12AA001a 6 引风机A出口烟气挡板2 IDF A outlet gas damper 2 10HNA12AA001b 7 空预器B进口烟气挡板1 AH B inlet gas damper 1 10HNA20AA001a 8 空预器B进口烟气挡板2 AH B inlet gas damper 2 10HNA20AA001b 9 电除尘B出口烟气挡板1 ESP B outlet gas damper 1 10HNA21AA001a 10 电除尘B出口烟气挡板2 ESP B outlet gas damper 2 10HNA21AA001b 11 引风机B出口烟气挡板1 IDF B outlet gas damper 1 10HNA22AA001a 12 引风机B出口烟气挡板2 IDF B outlet gas damper 2 10HNA22AA001b 13 电除尘出口联络门 ESP outlet connecting damper 10HNA13AA001 Appendix I Check list of IDF system dampers 2 (CV) PLTU2 BANTEN-LABUAN(2×300MW) Unit:System name:IDF systemDate: NO. Description Result SUBCON CHENGDA OWNER 0% 50% 100% open/close time 1 引风机A静叶 IDF A static blade 10HNC11AN001 2 引风机B静叶 IDF B static blade 10HNC21AN001 Remark: AppendixIIIDF protection function check PLTU2 BANTEN-LABUAN(2×300MW) Unit:System name:IDFsystemDate: NO. Descriptions Alarm/trip value Test value 1 IDFmotor front bearingtemperature (℃) 85/95 2 IDFmotor rear bearingtemperature (℃) 85/95 3 IDFmotor coiltemperature 1 (℃) 125/130 4 IDFmotor coiltemperature 2 (℃) 125/130 5 IDFmotor coiltemperature 3 (℃) 125/130 6 IDFmotor coiltemperature 4 (℃) 125/130 7 IDFmotor coiltemperature 5 (℃) 125/130 8 IDFmotor coiltemperature 6 (℃) 125/130 9 IDFfront bearingtemperature 1 (℃) 90/100 10 IDFfrontbearingtemperature 2 (℃) 90/100 11 IDF middlebearingtemperature 1 (℃) 90/100 12 IDFmiddlebearingtemperature2 (℃) 90/100 13 IDFrear bearingtemperature 1 (℃) 90/100 14 IDFrear bearingtemperature 2(℃) 90/100 15 IDFX direction bearing vibration (mm/s) 4.6/7.1 16 IDFY direction bearing vibration (mm/s) 4.6/7.1 Remark: COMPLETED BY SUBCON CHENGDA OWNER NAME SIGNATURE DATE AppendixIII Checklist ofnecessary precondition PLTU2 BANTEN-LABUAN(2×300MW) Unit:System name:IDF systemDate: NO. Description Requirement result 1 IDF body eligible 2 IDF outlet damper \static blade Operate flexibly; local and CRT display are correct. 3 Air and Gas system dampers Operate flexibly。 4 Cooling fan According with design request. 5 Cooling fan linkage According with design request. 6 Electric equipment eligible 7 Trip button eligible,can be put into operation。 8 IDF motor Insulation eligible 9 Test spot \ meter Local meters and CRT display are all normal 10 PAF protection function No signal constraint 11 Turn gear before IDF startup No friction 12 Air and Gas flue no sundries、no one work in the air and gas flue 13 IDF Eligible,can be put into operation Remark: COMPLETED BY SUBCON CHENGDA OWNER NAME SIGNATURE DATE Appendix Ⅳ-IFan bearing temperature PLTU2 BANTEN-LABUAN(2×300MW) Unit:System name:IDF systemDate: Time Blade Opening (%) Motor current (A) Temp.(℃) H:90℃ HH:100℃ Rated current (A) #1 #2 #3 #4 #5 #6 Remark: #1 10HNC11CT009 IDF Front bearing Temp. 1 #2 10HNC11CT010 IDF Front bearing Temp. 2 #3 10HNC11CT011 IDF Middle bearing Temp. 3 #4 10HNC11CT012 IDF Middle bearing Temp. 4 #5 10HNC11CT013 IDF Rear bearing Temp. 5 #6 10HNC11CT014 IDF Rear bearing Temp. 6 The KKS number should be changed from HNC11 to HNC21, when FDF B is used. COMPLETED BY SUBCON CHENGDA OWNER NAME SIGNATURE DATE Appendix Ⅳ-II Fan motor bearing temperature PLTU2 BANTEN-LABUAN(2×300MW) Unit:System name:IDF systemDate: Time Blade Opening (%) Motorcurrent (A) Temp.( ℃ ) H:85 ℃ HH:95℃ Rated current (A) #1 #2 Starting current (A) : Remark: #1---- 10HNC11CT007 IDF A motor front bearing temp. #2---- 10HNC11CT008 IDF A motor rear bearing temp. #1---- 10HNC21CT007 IDF B motor front bearing temp. #2---- 10HNC21CT008 IDF A motor rear bearing temp. 2 1 COMPLETED BY SUBCON CHENGDA OWNER NAME SIGNATURE DATE Appendix Ⅳ-III Fan motor coil temperature PLTU2 BANTEN-LABUAN(2×300MW) Unit:System name:IDF systemDate: Time Blade Opening (%) Motor current (A) Temp.(℃) H:125℃ HH:130℃ Rated current(A) #1 #2 #3 #4 #5 #6 Remark: #1---- 10HNC11CT001 IDF A MOTOR COIL U TEMP. 1 #1---- 10 HNC21CT001 IDF B MOTOR COIL U TEMP. 1 #2----10 HNC11CT002 IDF A MOTOR COIL U TEMP. 2 #2----10 HNC21CT002 IDF B MOTOR COIL U TEMP. 2 #3---- 10 HNC11CT003 IDF A MOTOR COIL V TEMP. 1 #3---- 10 HNC21CT003 IDF B MOTOR COIL V TEMP. 1 #4---- 10 HNC11CT004 IDF A MOTOR COIL V TEMP. 2 #4---- 10 HNC21CT004 IDF B MOTOR COIL V TEMP. 2 #5----10 HNC11CT005 IDF A MOTOR COIL W TEMP. 1 #5----10 HNC21CT005 IDF B MOTOR COIL W TEMP. 1 #6----10 HNC11CT006 IDF A MOTOR COIL W TEMP. 2 #6----10 HNC21CT006 IDF B MOTOR COIL W TEMP. 2 COMPLETED BY SUBCON CHENGDA OWNER NAME SIGNATURE DATE Appendix Ⅳ-Ⅳ Bearing vibration PLTU2 BANTEN-LABUAN(2×300MW) Unit: System name:IDF systemDate: Time Blade opening (%) Vibration(mm/s) Motor Fan(H: 4.6HH: 7.1 ) Free end(#1) Fixed end(#2) #3 Horizontal Vertical Horizontal Vertical Horizontal Vertical X Y X Y X Y 3 2 1 Remark: #1,#2-meter measuring #3-DCS display COMPLETED BY SUBCON CHENGDA OWNER NAME SIGNATURE DATE Appendix Ⅳ-ⅤParametertable PLTU2 BANTEN-LABUAN(2×300MW) Unit:System name:IDFsystemDate: Time Blade Opening (%) Current (A) Fan inlet pressure (kPa) Fan inlet temp. (℃) Fan outlet temp. (℃) Remarks: COMPLETED BY SUBCON CHENGDA OWNER NAME SIGNATURE DATE- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 印尼 LABUAN 风机 调试 程序 EN
咨信网温馨提示:
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【精***】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【精***】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【精***】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【精***】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。
关于本文