Prince2题库.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- Prince2 题库
- 资源描述:
-
601道题目随机考75道, 皆为单选题,难度比较大,要认真复习。 一定不要给外国人知道,不要互相传阅,谨防哪个傻逼告诉外国人。 学长 祝学弟学妹们顺利毕业,个个都是Merit 1. Which of the following is a characteristic of project work? B A. Projects have a permanent nature B. Projects require people with various and different skills C. Projects repeat the same work over and over D. Projects remove all uncertainty from the work 2. Which of the following is a characteristic of project work? D A. Each project is the same as the previous one B. Projects do not need to end at all C. Every project uses the same team of people D. Projects introduce change 3. Which of the following is a characteristic of project work? A A. Projects are temporary in nature B. Projects can only be undertaken when there are no known risks C. Every project must have the same supplier D. Projects and business as usually are the same discipline 4. Which of the following is a characteristic of project work? C A. Projects remove all uncertainty from the work B. Projects are permanent undertakings C. Projects introduce change D. Projects solve every business problem 5. Which of the following does project management wish to control? B A. People B. Costs C. Profit D. Space 6. Which of the following does project management wish to control? C A. Timekeeping B. Absenteeism C. Benefits D. The ‘day job’ 7. Which of the following does project management wish to control? D A. Risk and People B. Quality and Quantity C. Work practices and Scope D. Costs and Timescales 8. Which of the following does project management wish to control? C A. Business as usual B. The original idea for the product C. Risk and Scope D. Long term product use 9. Which of the following is true for PRINCE2 ? C A. It can only be used on certain types of project B. It is specific to certain industries C. It can be applied to any project D. It concentrated on the Specialist techniques used b developers 10. Why does PRINCE 2 suggest that a study to investigate the situation and determine options for the way ahead be run as a separate project? A A. Each option would have a different Project Plan, Business Case and set of risks B. It would over-complicate the project C. PRINCE 2 cannot handle multiple options D. A feasibility study cannot be part of a programme 11. Which of the following statements is FALSE? C A. Embodies best practice and governance B. Is based on ‘management by exception’ C. requires fixed progress meetings D. promotes consistency of project work 12. Which of the following statements is TRUE? PRINCE 2 provides which of the following? A A. A project management method B. A programme management method C. Line management techniques D. All of the above 13. Which of the following statements is FALSE? A A. Fixed progress meetings B. Delegation of authority C. Dividing the project into management stages D. Time event driven progress reporting 14. Which of the following statements is FALSE? PRINCE 2 provides projects with… D A. good communication channels between project management and the rest of the organisation B. regular reviews of progress against the Business Case C. flexible decision points D. complete absence of deviations 15. In PRINCE 2 what is the name of the product that is used to define the information that justifies the setting up, continuation or termination of the Project? A A. The Business Case B. The End Stage Approval C. The Project Brief D. The Project Mandate 16. In PRINCE 2 what answers the question: Why should this project be done? A A. The Business Case B. The End Stage Approval C. The Project Brief D. The Project Mandate 17. Which one of these is NOT a PRINCE 2 Theme C A. Organisation B. Quality C. Product-based planning D. Progress 18. Which one of these is NOT a PRINCE 2 Theme? B A. Risk B. Quality Review C. Plans D. Change 19. Which one of these is a PRINCE 2 Theme? A A. Risk B. Quality Review C. Product-base planning D. Product Descriptions 20. Which one of these is NOT a PRINCE 2 These? D A. Risk B. Quality C. Progress D. Directing a Project 21. Which of these statements is FALSE? A A. A PRINCE 2 plan is based on Work Breakdown Structure B. A PRINCE 2 plan is kept in line with the Business Case C. A PRINCE 2 plan needs approval D. A PRINCE 2 plan is more than a bar chart showing timescales 22. Which of the following is a reason for tailoring PRINCE 2? C A. Ensuring that the method is related to the project’s environment B. Ensuring the project’s control is based on the project’s scale C. Both of the above D. None of the above 23. Which of the following provides the vital test of the viability of a project? B A. The Project File B. The Business Case C. Application of specialized techniques D. Technical Stages 24. What environment does PRINCE 2 assume? B A. A fixed-price contract B. A Customer/supplier environment C. A specialist environment D. A third-party environment 25. What is defined as: ‘ the result of the change derived from using the outputs’? B A. Items B. Outcome C. Product D. Theme 26. Complete the following phrase… ‘A project is a temporary organization that is created for the purpose of delivering one or more business products according to…’ D A. The customer’s needs B. an agreed contract C. the Project Plan D. an agreed Business Case 27. A project is a temporary organization that is created for the purpose of delivering one or more… C A. Activities B. Stages C. Business products D. Techniques 28. Completed the following phrase… ‘A project is temporary organization that is created for the purpose of delivering one or more_____ according to an agreed Business Case.’ B A. customer’s needs B. business products C. components D. resources 29. What does PRINCE 2 regard as containing the ‘optimum mix of information to judge whether the project is viable’ within a project? D A. The Risk Log B. The Project Initiation Document C. The Project Brief D. The Business Case 30. Which concepts does PRINCE 2 use for senior management involvement? B A. Management by acceptance B. Management by exception C. Management by involvement D. Management by consent 31. What does PRINCE 2 offer to the Project Board because their project responsibilities are in addition to their normal work? D A. Management accountability B. Delegation of accountability C. Regular progress meetings D. Management by exception 32. In PRINCE 2 terminology, which phrase is used to describe an ‘exception’? B A. Where there has been a deviation beyond the tolerance levels B. Where it can be forecast that there will be a deviation beyond the agreed tolerance levles C. Any major issue D. Where a risk actually occurs 33. Which of the following options is detailed in PRINCE 2? C A. People motivation B. Earned Value Analysis C. Product-based planning D. Critical Path Analysis 34. Which of the following techniques is part of PRINCE 2? B A. Earned Value Analysis B. Product-based planning C. Critical Path Analysis D. Gantt charting 35. Which of the following project management aspects is detailed as a theme in PRINCE 2? C A. Contracting B. Earned Value Analysis C. Risk D. Procurement 36. Which of the following options is detailed as a theme in PRINCE 2? B A. Team leadership B. Organisation C. Earned Value Analysis D. Corporate quality management 37. How does PRINCE2 provides a firm basis for defining the scope boundary? C A. By establishing a totally independent Business Case for each project B. By keeping an independent Risk Log for each project C. By identifying, defining and analyzing the projects products D. By defining the Business/User/Supplier roles 38. The PRINCE 2 approach to project management is: A A. Process-based B. Component-based C. Technique-based D. Control-based 39. Which of the following statements is/are correct? C 1. PRINCE 2 is suitable for both small and large projects 2. PRINCE 2 can be applied regardless of the industry or field of work A. Only the first B. Only the second C. Both D. Neither 40. Consider the assertions given below: are the assertions true? B 1. As a project management method, PRINCE 2 is also suitable for programme management 2. The PRINCE 2 method is not dependent on the area of application A. Only the first assertion is true B. Only the second assertion is true C. Both are true D. Neither are true 41. Which of the following three statements are true of a PRINCE 2 project? D 1. There is no standard approach to a project 2. Activities down to the level of Work Package are identified during Project Initiation 3. A project is a temporary structure A. Only 1 and 2 B. Only 1 C. 1, 2 and 3 D. Only 3 42. PRINCE 2 assumes a Customer/Supplier environment and is written from which standpoint? A A. These two parties/may or may not be part of the same organisation B. These two parties will share common senor management C. The two parties will share the same business case D. The two parties must come from commercially separate organisations 43. Which of the following statements is/are correct? B 1. PRINCE 2 is designed to be used on any type of project 2. The way in which PRINCE 2 is applied to each project must be the same 3. Tailoring the method to suit the circumstances of a particular project is critical to its successful use. A. Only the first two B. Only the first and third C. All of them D. Only second and third 44. Which of the following statement is/are correct? C 1. PRINCE 2 is designed to be used on any type of project in any environment 2. The way in which PRINCE 2 is applied to each project cannot vary 3. Enforcing the method in spite of the circumstances of a particular project is critical to its successful use A. Only the first two B. Only the first and third C. Only the first one D. Only the second and third 45. Which role from the following list does PRINCE2 say can be delegated? B A. Project Manager B. Project Assurance C. Executive D. Senior User 46. Which role is there to ensure that proposals for designing and developing the products are realistic? A A. Senior Supplier B. Senior User C. Quality Assurance D. Team Manager 47. Which role represents those who will use the product to deliver benefits? B A. Senior Supplier B. Senior User C. Quality Assurance D. Team Manager 48. ‘…monitoring all aspects of the project’s performance…’ is a responsibility of which role? D A. Team Manager B. Configuration Librarian C. Programme Director D. Project Assurance 49. On behalf of whom do any appointed Project Assurance roles assure the Project? C A. Programme Director B. Project Executive C. One or more members of the Project Board D. Project Manager 50. Which of the following phrases are correct? B 1. A project normally cross-functional 2. A project is likely to required a board base of skills for a comparatively short period of time 3. A project requires specialist skills to be developed over a long period of time 4. Those providing a solution will have different priorities to those with a problem to be solved A. All are correct B. Only one. Two and four are correct C. Only one, two and three are correct D. Only two and four are correct 51. Which individual role is ultimately accountable for the Project? C A. The Project Manager B. The Senior Supplier C. The Executive D. The Senior User 52. Which is a specific responsibility of Project Assurance? B A. Deciding on project issues B. Checking that the right people are being involved C. Making project decisions based on the Business Case Manager D. Reporting highlights to the Project Board 53. Which is NOT a possible responsibility of Project Assurance? A A. Deciding on next stage approval B. Checking that the right people are being involed C. Checking that risks are being controlled D. Constant reassessment of the value-for-money solution 54. Which is a possible responsibility of Project Assurance? A A. Checking that the focus on business need is maintained B. Creation of the Quality Management Strategy C. Giving ad hoc direction to the Project Board D. Reporting highlights to the Project Board 55. Which of the following roles may be assigned to the Project Manager? D A. Executive B. Project Assurance C. Senior User D. Team Manager 56. The use of which of these plans is OPTIONAL? C A. Project Plans B. Stage Plans C. Team Plans D. All of the above 57. The use of which of the following is mandatory in a PRINCE 2 project? C A. The use of management stages B. The initiation stage C. Both of the above D. Neither (A) not (B) above 58. Which does PRINCE 2 regard as the third project interest, given User and Supplier as the other two? C A. Technical B. Management C. Business D. Quality 59. Which does PRINCE 2 regard as the third project interest given Business and Supplier as the other two? B A. Management B. User C. Technical D. Quality 60. Which does PRINCE 2 regard as the third project interest, given User and Business as the other two? D A. Quality B. Management C. Technical D. Supplier 61. Which member of the Project Management Team is responsible for the Business Case? A A. The Executive B. The Senior User C. The Senior Supplier D. The Project Manager 62. Who decides on the use of the Project Assurance role? C A. Programme Management B. The Project Manager C. The Project Board D. Quality Assurance 63. If the project needs staff to handle configuration management, they would be part of which group? B A. Project Assurance B. Project Support C. Specialist Team D. Programme Directorate 64. If the Project needs a configuration librarian, this role would be part of which group? C A. Project Assurance B. Specialist Team C. Project Support D. Programe Directorate 65. Which part of the project organisation assists the Project Manager in handling configuration management? B A. Project Assurance B. Project Support C. Specialist Team D. Programme Directorate 66. If the Project needs staff to handle the use of specific planning and control software, they would be part of which group? D A. Project Assurance B. Programme Directorate C. Specialist Team D. Project Support 67. PRINCE 2 assumes that the Project Manager normally comes from: A A. The Customer B. The Supplier C. An independent consultancy D. The Project Support Office 68. Whose responsibility is it to set the overall tolerance levels for the Project? D A. The Project Manager B. The Project Board C. The Executive D. Corporate or programme management 69. Whose specific responsibility is it to ensure that the desired outcome展开阅读全文
咨信网温馨提示:1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前可先查看【教您几个在下载文档中可以更好的避免被坑】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时联系平台进行协调解决,联系【微信客服】、【QQ客服】,若有其他问题请点击或扫码反馈【服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【版权申诉】”,意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:0574-28810668;投诉电话:18658249818。




Prince2题库.doc



实名认证













自信AI助手
















微信客服
客服QQ
发送邮件
意见反馈



链接地址:https://www.zixin.com.cn/doc/2627927.html