试议换热器制造工艺指导流程模板.doc
《试议换热器制造工艺指导流程模板.doc》由会员分享,可在线阅读,更多相关《试议换热器制造工艺指导流程模板.doc(6页珍藏版)》请在咨信网上搜索。
1、接管和法兰Nozzle and the flange将坡口加工好接口和相对应法兰进行组装,要求:间隙34mm,错边在1.5mm以下,氩弧焊打底,全熔透结构。焊接完成后送无损检测,检验标准RT( )%,级合格。Assemble the groove machined nozzle with the corresponding flange, requirements: the gap is 3 4mm, the staggered side is less than 1.5mm, argon arc bottoming, full penetration structure. After wel
2、ding,having a non-destructive testing, the inspection standards is RT () class, III qualified.支座点焊Supportswelding1.按图对支座底板、筋板、立板进行组装前检验。In accordance with drawings, inspect the supports backplane, ribs, riser before assembling.2.组装各部件,点固,加支撑件等,焊接。Assemble every component, solid point, support pieces
3、, and welding.接管支座和壳体组装Nozzle supports and shell assembling1.按先前标出0、90、180、270方位点,延长在壳体上。Base on the previously marked 0 , 90 , 180 , 270 compass points, extending to the hcase.2.画出接管、支座,预开孔,安装位置,即坐标点。Draw the nozzle, supports, pre-openings, the installation location, that is, the coordinates of poi
4、nts3.检验合格后,开孔,然后打上坡口,角度为外坡口30After Inspection, opening, then grooving,the angle of the outer groove is30 4.组对接管和壳体,组装前,接管必需将补强圈带上固定好,一起装配。Connect nozzle to shell, before assembling,the nozzle must fix the reinforcement ring,along with the equipment.5.接管和壳体组对间隙为23mm,且间隙均匀。The gap of the nozzle and sh
5、ell is 2 3mm, and the gap is uniform6.焊接完成后,内接管须清根封底,焊缝打磨和母材齐,并倒245圆角。After welding, to nozzle requires to clear the root of the back cover, weld and polise to ensure the base metal level, and the fillet is 2 45 .管箱Tube box1.封头:材质确定,标识移植,切割,外协模压,回厂检验,材质为( ),( )。Head: Material confirmation , mark and
6、 transplante, cutting, outsourcing molding, back to the factory inspection, the material is (), ().2.短节:材质确定 a.按排版图尺寸划线下料坡口加工。(见具体工艺文件) Short section: material confirmation a. Drawing, crossed material and groove processing by the size of the layout chart. (See the specific process documents). b.卷板,
7、纵缝焊接,校圆,纵缝RT( )%,级合格,车加工削薄。 b. coil, longitudinal seam welding , regulate round, longitudinal seam RT (), III class qualified ,vehicle processing thinning.3.管箱法兰和短节组装:a.管箱法兰和短节组焊,封头和短节组焊。Flange and short section of the tube box assembly: a. tube box flange and a short section welding,the head and a
8、short section welding。b.对环缝进行射线检测。Ring sewn-ray detection.c.和壳体联接,整体划线,开孔,接管组装,焊接,确保其整体一致性。Connection with the shell, the overall drawing,openings, nozzle assembly, welding, ensure that its overall consistency.d.卸下管箱,对接管法兰清根封底,划出隔板安装线,再按封头实样放样切割,装配隔板和焊接,装配要求:每层隔板端口尺寸必需和固定端管板( )槽一致吻合。(d) Remove the t
9、ube box, clear the root of the nozzle of the flange, draw the bulkhead install line, and then cutting base on the real shape of the head, assembling the bulkhead and welding, assembly requirements:each partition port size must be consistent with the fixed end of the tube plate () notch.e.做好热处理前支撑,预防
10、热处理使隔板变形。Do good support before heat treatment to prevent heat treatment so that bulkhead deformationf.热处理完成冷却后,再加工密封面,确保法兰密封面和隔板端平面一致。After the heat treatment and cooling, reprocessing the sealing surface to ensure the flange sealing surface and the baffle-side plane consistent.外头盖the outsidebonnet
11、1.封头:材质确定 划线,标识移植,切割,外协模压,回厂检验,贴合格标签。Head: The material confirmation, mark and transplante, cutting, outsourcing molded, back to the factory inspection, paste qualified label.2.短节:材质确定 按图尺寸划线,切割,坡口精加工,卷板,焊接,校园。Short sections: materials confirmation drawing base on the size of the chart, cutting and
12、finishing of the groove, plate bending, welding, regulate round.3.法兰和封头,短节组焊:a.将合格封头和短节及对应法兰组焊,错边量控制在02mm之间。Flange and the head, a short section of welding: (a) welding the qualified head ,a short section and the corresponding flange, the stagger volume is controlled between 0 2mm.b.环缝焊接,无损检测。(b).Th
13、e girth welding, nondestructive testing.c.划线开孔,安装管嘴和吊耳,焊接 (c). Drawing and opening, install the nozzle and lug ,welding.d.和壳体、管箱、浮头盖,一并整体热处理。(d).The shell, tube box, floating cover, together with the overall heat treatment.浮头盖Floating bonnet1.拱盖:材质确定 划线下料,标识移植、切割,外协模压、回厂检验。Ledge: material confirmati
14、on Drawing and cutting, mark transplantation, cutting, outsourcing molding, back to the factory inspection.2.浮头法兰:在材料检验员指定下领取贴有合格标签法兰。 Floating head flange: receive designated qualified label of the flange under the guidiance of the materials inspector .3.将拱盖和浮头法兰组装,装配尺寸图。Assemble ledge and floating
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 换热器 制造 工艺 指导 流程 模板
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【天****】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【天****】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。