本科毕业论文---土石坝的施工外文翻译与原文.doc
《本科毕业论文---土石坝的施工外文翻译与原文.doc》由会员分享,可在线阅读,更多相关《本科毕业论文---土石坝的施工外文翻译与原文.doc(10页珍藏版)》请在咨信网上搜索。
1、 外文翻译101Rapid construction of the embankment damAbstract : In recent decades, the soil core rockfill dam has gradually become the worlds construction of the high dam-one of the mainstream, With the new earth and the huge investments in machinery and construction technology of filling a higher level,
2、 Meanwhile dams in-depth testing, greatly expanding the embankment dam scope of the materials and the use of materials for model for more extensive embankment dam will provide favorable conditions to change the long-standing embankment dam with a long construction period, Filling the lack of low int
3、ensity, and further accelerate the progress of the construction, Filling in ensuring construction quality and safe operation under the premise to explore the rapid construction of embankment dams it is very necessary thing. Key words : embankment dam Rapid construction Construction1 Overview Also kn
4、own as the embankment dam dam local materials, the necessary soil in situ stone mining in general, but can also make full use of the excavated material. having to basic requirements, low deformation based on the character, filling construction, and can be divided into RCC-grade. Fill-rockfill dam, d
5、irectional blasting rockfill dam, the hydraulic fill dams, hydro-filled dam and masonry dam in different ways. Parabolic which administered rockfill dam no longer, directional blasting rockfill dam late settlement exist, not be planted within the dam prototype observation equipment shortage, which a
6、re rarely used, hydraulic fill dams, Fill the water main in a special area of the lower dam height of the small and medium projects, the masonry dam strictly speaking belongs masonry dam category, At present, the extensive use of thin sections and the hierarchical compaction roller compacted embankm
7、ent dam. 2 The need for rapid construction With the dam construction technology, concrete gravity dam dam the technology continues to improve, while the rubber dam and other new dam-constant use, there is a traditional embankment dam filling a large quantity of a long time to build the shortcomings
8、become extremely prominent, how to fully exploit the technology itself embankment dam low, right foundation adaptability, full use of local materials to the traditional advantages to speed up the construction schedule, as Pa-an important option. Filling in ensuring the quality of construction and sa
9、fe operation of the rapid construction premise is that the parties are concerned. 2.1 Based on the uncertainty, the need to accelerate the progress of measures With the hydropower development progress in basic bad place to build a large embankment dams, In order to meet the capacity and infrastructu
10、re foundation impervious to the needs, often based on the completion of treatment can only be reclaimed after construction, however, foundation of a more complicated, especially in deep-cover construction projects, infrastructure projects are large, unpredictable factors, often need cutoff Vibroflot
11、ation, curtain grouting, grouting consolidation of the foundation for the integrated treatment, handling difficult and complex examination, Based on the number of projects, foundation treatment completion and handover of face time is often more work plan by the time lag. Filling started causing dela
12、y and the next gate or the completion of water storage often not be adjusted, resulting in an effective filling time, Construction units have had to resort to quick construction of measures will be scheduled according to the contract (or even ahead of) completion of the project. 2.2 Hydro-meteorolog
13、ical, filling intensity of the proposed new standards Embankment dam of the hydro-meteorological factors are extremely sensitive and in the rainy season, soil moisture greatly influenced, directly restricts dam reclamation, construction intensity will be affected; winter, the soil on the cold, and i
14、f it does not take active measures is impossible to filling and filling winter rainy season, there is a high input, low output of the predicament, Construction units are often reluctant to assume, therefore, take full advantage of filling the golden season, try to avoid winter construction of the ra
15、iny season (or reduce the amount of filling winter rainy season), the construction unit is the first choice of the relative, the golden season, filling the quantity of work is often very substantial. Rapid construction can be avoided winter rainy season generous amount of filling the most important
16、issue. 2.3 New Construction equipment and materials massive expansion of the scope of application is the basis for rapid construction With the improvement in the degree of mechanization, large capacity of earth and equipment used in construction, improved ergonomics, thus laid for the rapid construc
17、tion of the necessary material foundation for the formation of materials to expand the scope of application. the original dam material unsuitable materials can also be used as filling material, this rapid filling of the embankment dam with a new pillar.3 Field data mining Yard of the embankment dam
18、importance is self-evident, it is also most likely to affect the smooth filling of the dam weaknesses, according to engineering practice. Generally, the material yard depth of geological exploration work is far less dam, especially the largest volume filling of rockfills. Several exploratory often a
19、lone or topographic survey conducted geological description of the venue, and changes in the tender documents is a great possibility, or geological conditions undergone major changes. tender documents into useful information useless information, or mining area is smaller, to create large-scale minin
20、g (or stairs mining), is not conducive to large-scale mining machinery. can directly control dam Regular filling, grading sound, but also can affect the dam fast filling the key In impermeable soil, the water level of the dam could also become the key to rapid filling, therefore, sound and carefully
21、 reviewed for yard work and rehabilitation investigation it is particularly important to do a good job yard rechecking and reserve calculation, be aware of. If those conditions for the best in the dam filling part of the former reserves expected to peak lowering finished Pinggu. 3.1 Road Constructio
22、n To meet the need for rapid construction of a large number of machinery and equipment investment is inevitable, At present, more and more vehicles to transport large tonnage trends, the number of transport vehicles also require a corresponding increase on the road increasingly high demand, the prac
23、tice has proven that better roads, transport vehicles higher attendance, Filling a corresponding increase efficiency, the saying goes, is the road repair, road construction is progress is the reason, General projects have adopted the mud stone pavement, if those conditions for the local traffic is h
24、eavy use lots of concrete pavement, will greatly improve transport efficiency on the road layout, as far as the actual layout of the Central Bank into a two-lane, vehicles to avoid interference and improve the efficiency of cycling. 3.2 Rapid construction of the main methods and attention to the mat
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 本科毕业 论文 土石 施工 外文 翻译 原文
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【胜****】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【胜****】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。