lng墙体施工方案书-施工方案.doc
《lng墙体施工方案书-施工方案.doc》由会员分享,可在线阅读,更多相关《lng墙体施工方案书-施工方案.doc(51页珍藏版)》请在咨信网上搜索。
Fujian LNG Terminal and Trunkline Project _____________________________________________________________________________________________________________________________ Method Statement for Cracks control method of mass concrete ______________________________________________ REVISION :A PAGE: 13/48 0 2009.10.6 张晓斌 廖明强 刘俊 B 2009.9.25 张晓斌 廖明强 刘俊 A 2009.9.2 张晓斌 廖明强 刘俊 版次 Rev. 日期 Date 编 制 Prepared By 审 核 Reviewed By 批 准 Approved By CBI 业主/监理 Owner/Supervisor 修 改 说 明 提交供审核 Revision Description. IFC (Issue for Construction) 中国核工业华兴建设公司 CHINA NUCLEAR INDUSTRY HUAXING CONSTRUCTION CO. 福建LNG一期新增3#、4#储罐工程 FJLNG Phase I Additional #3 And #4 Tanks Project 液化天然气低温储罐土建工程 LNG Cryogenic Tank Civil Works 编码CODE FJLNG-CO2-HUAX-014 文件类别 Doc. Type 方案Method Statement 文件名称 Doc. Title 福建LNG罐混凝土墙体施工方案 Method Statement for the Concrete Wall of FJLNG Tank 版次Rev 页码Page A B C D E F G 版次Rev 页码Page A B C D E F G 0 11 1 12 2 13 3 14 4 15 5 16 6 17 7 18 8 19 9 20 10 21 Fujian LNG phrase 1 Additional 3# & 4# Tanks Project _____________________________________________________________________________________________________________________________ Method Statement for the Concrete Wall of LNG Tank ______________________________________________ REVISION :0 PAGE: 51/51 CHANGE RECORD PAGE REVISION DESCRIPTION OF REVISION A Issue for Review B Issue for Review 0 IFC REVISION TABLE PAGE REVISION PAGE REVISION APPENDIX REVISION A A A 1 X 26 X 1 X 2 X 27 X 2 X 3 X 28 X 3 X 4 X 29 X 4 X 5 X 30 X 5 X 6 X 31 X 6 X 7 X 32 X 7 X 8 X 33 X 8 X 9 X 34 X 10 X 35 X 11 X 36 X 12 X 37 X 13 X 38 X 14 X 39 X 15 X 40 X 16 X 41 X 17 X 42 X 18 X 43 19 X 44 20 X 45 21 X 46 22 X 47 23 X 48 24 X 49 25 X 50 目 录 Content 1. General概述 6 2. Scope 范围 6 3. References 参考文献 7 3.1. Drawing 图纸 7 3.2. Specifications 规范 11 4. Construction preparation 施工准备 11 4.1. Personnel人员 11 4.2. Construction materials施工主要材料 11 4.3. Construction equipment and tools施工机具 11 5. Construction methodology施工方法 14 5.1. Construction sequence 施工顺序 14 5.2. Survey control 测量控制 15 5.3. Installation of embedded parts 预埋件安装 17 5.4. Rebar fabrication and fixing 钢筋制作及安装 21 5.5. Pre-stressing duct erection 预应力管道安装 25 5.6. Formwork erection 模板支设 25 5.7. STRIKING OF FORMWORK 拆模 37 5.8. Horizontal construction joints treatment水平施工缝的处理 38 5.9. Concrete work 混凝土浇注工作 39 5.10. Temporary Construction Opening 临时施工洞口 41 6. Contingency Plans 应急方案 42 7. Controls 控制 42 8. Access 通道 43 9. TRAINING 培训 44 10. Safety plan for wall construction墙体施工安全方案 45 10.1. Physical barrier to be installed安装硬围护 45 10.2. Climbing of Doka formwork 多卡模板爬升 45 10.3. Fall protection 防坠落保护 45 10.4. Access and emergency access 通道和紧急通道 46 10.5. Electrical safety measure 用电安全措施 46 10.6. Bad weather plan 坏天气计划 46 11. Appendix 附件 47 1. General概述 This method statement is established to define construction method for the concrete wall of FJLNG phrase 1 Additional 3# and 4# Tanks project. 此方案适用于福建LNG一期新增3#和4#储罐工程混凝土墙体施工方案。 2. Scope 范围 Variations of sequence or method may evolve as the work progresses, which will maximize efficiency and use of available equipment and resources. A revised Method statement will be issued for variations in work practice. 施工顺序或方法会随工程进展而改动,以便最大化的提高资源使用效率。 The tank wall is circular on plan, tank height of 50054mm, 1000mm thick tapering down to 550mm thick at a height of 6750mm. The inner radius of wall is 41000mm, the outer radius is 41550mm, and the thickness of standard wall is 550mm. The concrete C50 will be used for the wall, reinforced with high yield steel reinforcement on the faces of the wall and cryogenic reinforcement just be used on the inner face of lift 2. 罐体墙体为圆形, 罐高50054mm, 在高度6750mm范围内,罐厚从1000mm渐变到550mm. 墙体内径为41000mm,外径为41550mm,标准墙体厚度为550mm。墙体使用C50混凝土,墙体钢筋高屈服钢筋,第二层墙体内侧使用低温钢筋。 Post Tensioning is applied to horizontal and vertical pre-stressing ducts built into the walls. 预应力适用于墙体的水平和竖直预应力管道。 The description of tendon prestressing and duct grouting will be addressed in separated method statement. 预应力和孔道灌浆的描述参见单独的施工方案。 During construction of the wall, welding joints and deformation of inserts control shall be performed by the mechanical subcontractor in accordance with the relevant specification, other work shall be carried out by civil contractor. The mechanical subcontractor shall use the access and platform set by civil subcontractor for welding of inserts. 在罐筒体施工过程中,预埋件焊接连接和变形控制措施工作由机械分包商按照相关规范执行,其余相关工作均由土建分包商完成。机械分包商进入筒体执行预埋件焊接时,可利用土建分包商设置的通道和操作平台。 Construction will be 11 lifts of the following heights: 施工每层高度: Lift No Height (mm) Concrete Dosage(m³) 1 3375 790 2 3375 621 3 3800 587 4 3800 587 5 3800 587 6 3800 587 7 3800 587 8 3800 587 9 3800 587 10 3775 584 11 11-1 2275 534 11-2 1100 437 3. References 参考文献 3.1. Drawing 图纸 General Arrangement 总体安排 DD-DWG-TS-ST-025101 Tank #TS-T-02-03 Orientation 3#罐定位图 DD-DWG-TS-ST-025102-01 Tank #TS-T-02-04 Orientation 4#罐定位图 DD-DWG-TS-ST-025102-02 Outer Paste on Liner 衬里的外部粘贴材料 DD-DWG-TS-ST-025122 Outer Liner Embed Details 外罐衬里预埋件详图 DD-DWG-TS-ST-025123-01 Outer Liner Embed Details at TCO 临时洞口外罐衬里预埋件详图 DD-DWG-TS-ST-025123-02 Outer Liner Embed Details 外罐衬里预埋件详图 DD-DWG-TS-ST-025123-03 3" Outer Bottom Insulation Purge N13 3"外罐底隔热层排气管N13 DD-DWG-TS-ST-025192 Outer Liner Embed Details 外罐预埋件详图 DD-DWG-TS-ST-025139 2" Dia Pres. Equalization - N14A/B & N20A/B 2"稳压管N14A/B & N20A/B DD-DWG-TS-ST-025194 Temporary Outer Line Rain Gutter 临时外排水管 DD-DWG-TS-ST-02ER5 Compression Bar Anchor抗压钢筋锚固件 DD-DWG-TS-ST-025158 Embedment Plates for Escape Ladder逃生梯预埋件 DD-DWG-TS-ST-025270 Embedment Plates for Escape Ladder逃生梯预埋件 DD-DWG-TS-ST-025271 Embedment Plates for Main Stairway 主要通道预埋件 DD-DWG-TS-ST-025272 Embedment Plates for Main Stairway 主要通道预埋件 DD-DWG-TS-ST-025273 Embedment Plates for Main Pipe Rack 主管支架预埋件 DD-DWG-TS-ST-025274-01 Embedment Plates for Main Pipe Rack 主管支架预埋件 DD-DWG-TS-ST-025274-02 Embedment Plates for Firewater Piping 消防管道预埋板DD-DWG-TS-ST-025275 Embed Plates for Circumferential Handrail 环形栏杆预埋件图纸 DD-DWG-TS-ST-025277 Embed plates for roof walkway 穹顶走道预埋件 DD-DWG-TS-ST-025280 Roof embed dimensions 穹顶预埋件尺寸 DD-DWG-TS-ST-025284 Roof embed dimensions 穹顶预埋件尺寸 DD-DWG-TS-ST-025285 Circumferential handrail 环形栏杆 DD-DWG-TS-ST-025321 Concrete Tank Elevation 混凝土罐体立面图 DD-DWG-TS-ST-025400 Reinforcing Steel Bend Details 钢筋弯曲详图 DD-DWG-TS-ST-025411 Concrete Wall Reinforcement 混凝土墙体钢筋 DD-DWG-TS-ST-025415 Starter Bar Arrangement @Buttress 扶壁柱处插筋布置图 DD-DWG-TS-ST-025416 Concrete Wall Reinforcement Arrangement @Buttress扶壁柱混凝土墙体钢筋布置图DD-DWG-TS-ST-025417 Concrete Wall Pre-stress Details 混凝土墙体预应力详图 DD-DWG-TS-ST-025418 Temporary Construction Opening (Concrete Wall) 临时施工洞口(混凝土墙体) DD-DWG-TS-ST-025419 Concrete roof reinforcement 混凝土穹顶钢筋 DD-DWG-TS-ST-025420 General note总说明 DD-DWG-TS-ST-0253000 Anchorages details and wall typical section锚具详图和墙体截面图 DD-DWG-TS-ST-0253001 Wall Plan and Sections墙体平面和截面图 DD-DWG-TS-ST-0253002 Horizontal Prestress Layout(sht 1)水平预应力分布图(1) DD-DWG-TS-ST-0253003 Horizontal Prestress Layout(sht 2)水平预应力分布图(2) DD-DWG-TS-ST-0253004 Setting-out for horizontal prestress ducts水平预应力管定位 DD-DWG-TS-ST-0253005 Horizontal prestress layout at wall buttress扶壁柱水平预应力分布图DD-DWG-TS-ST-0253006 Vertical prestress layout(U-shaped ducts) 竖向预应力分布(U形管) DD-DWG-TS-ST-0253007 Vertical prestress layout(U-shaped ducts) 竖向预应力分布(U形管) DD-DWG-TS-ST-0253008 Vertical prestress typical setting-out of steel pipe竖向预应力钢管定位DD-DWG-TS-ST-0253009 Setting-out plan of steel pipes for vertical prestress ducts(sht 1) 竖向预应力管钢管定位平面图(1) DD-DWG-TS-ST-0253010 Setting-out plan of steel pipes for vertical prestress ducts(sht 2) 竖向预应力管钢管定位平面图(2) DD-DWG-TS-ST-0253011 Setting-out plan of steel pipes for vertical prestress ducts(sht 3) 竖向预应力管钢管定位平面图(3) DD-DWG-TS-ST-0253012 Setting-out plan of steel pipes for vertical prestress ducts(sht 4) 竖向预应力管钢管定位平面图(4) DD-DWG-TS-ST-0253013 Setting-out for vertical prestress duct竖向预应力管定位 DD-DWG-TS-ST-0253014 Vertical prestress-Typical steel pipe details & at buttress setting-out竖向预应力-钢管详图及扶壁柱处的定位 DD-DWG-TS-ST-0253015 Vertical prestress steel pipe at opening-Detals临时洞口的竖向预应力钢管详图DD-DWG-TS-ST-0253016 Connection detail of prestress ducts at opening临时洞口的预应力管连接详图DD-DWG-TS-ST-0253017 Tank wall pre-stressing sequence墙体预应力张拉顺序DD-DWG-TS-ST-0253018 3.2. Specifications 规范 Project Specification for Cast-in-Place Concrete Construction for Cryogenic Storage Tank 低温储罐现浇混凝土规格书 DD-SPC-TS-ST-02504 Project Specification for Pre-stress Materials and Installation 预应力材料及安装规范 DD-SPC-TS-ST-02505 4. Construction preparation 施工准备 4.1. Personnel人员 Relevant staff and crews are all through mobilization training and technique training. Special workers are all with special work certificates. The future mobilized personnel also will be trained. 相关管理人员和施工人员已经经过进场培训,特种操作人员持有相应的特种操作证书,相关施工人员和管理人员已经经过相应的技能培训,后续进场人员会按照既定的培训计划进行进场培训和技能培训。 4.2. Construction materials施工主要材料 The recently necessary constructions materials have already arrive at jobsite and qualified after test and ready for usage. The future mobilized materials will also be tested and accepted as per specifications and approved for usage after being tested qualified. 目前所需施工主要材料已经报批进场,并检验合格,正式施工时可以投入使用。后续材料会按照规范要求进行材料进场验收,合格后方可投入使用。 4.3. Construction equipment and tools施工机具 A part of wall construction equipment and tools have already get to jobsite being installed, accepted and used. The future equipment and tools also will be tested for acceptance before being used. The equipment and tools at jobsite now are as follows: 墙体所需施工机具部分进场安装完毕,并通过验收,且已经投入使用。后续设备会按照现场要求进行验收,合格后投入使用。已经进场的设备和施工机具见下表: 序号No. 设备名称Equipment 产地Producing Area 规格/型号Specification/Type 单位Unit 数量Quantity 1 砼搅拌运输车 Truck Mix 中国China XEJ5270(6m3/each每罐) 辆Each 2 XZJ5259(8m3/each每罐) 辆Each 4 2 平板货车Lorry 中国China T850(8t) 辆Each 1 3 自卸车Dump Truck 中国China EQ3141G(7.5T) 辆Each 1 4 拖头Tractor 中国China EQ4150J(25t) 辆Each 1 5 拖板Trailer 中国China SE9410(25t) 辆Each 1 LY9381(20t) 辆Each 1 6 汽车吊 Mobile Crane 中国China 25t 台Each 1 7 塔式起重机 Tower Crane 中国China 21CJ210 台Each 1 21CJ290 台Each 2 TC6515C-12E 台Each 3 TC7052 台Each 1 8 砼搅拌站 Batching Plant 中国China HZS50B(50m3/h) 套Set 2 9 砼布料机 Concrete Placing Boom 中国China (固定式fixed)38m 套Set 2 (行走式 movable)38m 套Set 1 10 振捣棒 Vibrator 中国China Ф35—ф70 根Each 15 11 大型移动式钢筋剪切生产线 rebar cutting product line 中国China GJW-150 套Set 1 12 钢筋大弧弯曲机 Rebar Large Arc Bending Machine 美国America KRB11# 34 台Each 1 13 自动钢筋弯曲机Rebar Bending Machine 中国China XGW-40 台Each 2 14 木工圆锯机Carpenter Circular Saw 中国China MJ-106A 台Each 1 15 木工平面刨 carpenter plane 中国China MB-504 台Each 1 16 水泵 pump 中国China AS75-2CB 台Each 2 17 高压水枪 High pressure water jet 中国China 猫王1.35MPa 台Each 2 18 吸尘器 Vacuum 中国China WVD2002 台Each 1 19 水准仪 Level 瑞士 徕卡NA728 架Each 2 20 全站仪 Total Station 瑞士 TCR702 架Each 1 21 手提圆盘电锯 Portable circular Saw 中国China C235 台Each 2 22 电钻 Electrical Drill 中国China JIZ SD05--13A 台Each 4 23 交直流电焊机 Electrical Welding Machine 中国上海Shanghai China ZXZ1-400/500 台Each 4 24 逆变电焊机 Reverse Welding Machine 中国China ZX7-400B 台Each 4 25 空压机 Air Compressor 中国China LGD-20/8(20m3) 台Each 1 26 抽水泵 Water Pumping 中国China 200扬升 台Each 4 27 装载机 loading Truck 中国China ZL-50 台Each 1 XG951 台Each 1 28 皮带运输机 Conveyer 中国China 架Each 2 29 波纹管加工机械 中国China 套Set 1 5. Construction methodology施工方法 5.1. Construction sequence 施工顺序 Previous lift前一层 Rebar mats pre-fabrication预制钢筋网片 Treatment of construction joint施工缝处理 Rebar mats and inserts installation钢筋网片和预埋件安装 Horizontal /vertical sheath installation水平/垂直预应力管安装 Fixing Rebars at the buttress附壁柱钢筋绑扎 Lifting and Installing the inner formwork内模板提升和安装 Adjusting and fixing inserts and ducts预埋件与预应力管道校正与固定 Cleaning, lifting and installing the outer formwork外模板清理、提升和安装 Concrete mixing and transporting混凝土搅拌与运输 Survey checking and reporting测量检查和报告 Joint inspection and acceptance联合检查和验收 Moistening of construction joint施工缝润湿 Concrete pouring, roughing construction joint and curing混凝土浇筑、施工缝冲毛和养护 Removing formwork and applying curing compound模板拆除和刷养护剂 Geometrical survey and surface inspection & treatment罐体测量和表面处理 Next lift commencement开始下一层 Installation of rebar mats, inserts and ducts for next lift下层钢筋、预埋件和管道安装 The construction sequence of concreting for one wall lift is shown as follows单层墙体施工顺序如下: 5.2. Survey control 测量控制 After the concrete at central area of pile cap reached enough strength, the survey team shall set the center point accurately by using the survey control points approved by Contractor. An- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- lng 墙体 施工 方案
咨信网温馨提示:
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【快乐****生活】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【快乐****生活】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【快乐****生活】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【快乐****生活】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。
关于本文