预制梁场临时用电方案.doc
《预制梁场临时用电方案.doc》由会员分享,可在线阅读,更多相关《预制梁场临时用电方案.doc(12页珍藏版)》请在咨信网上搜索。
1、(完整版)预制梁场临时用电方案唐廊高速公路天津段一期工程二标预制梁场临时用电安全专项方案编制: 审核: 中铁十二局集团有限公司唐廊高速公路天津段一期工程二标项目部2013年05月20日清水混凝土的配合比设计中,要针对当地水泥、砂石、外掺料及外加剂等原材料影响混凝土质量的多种因素进行分析,确定主要控制因素,并从经济性和使用要求综合考虑,优选出符合生产条件的最优方案组合。obstacles, correcting misunderstandings, advocate good cadre style. 2, adhere to the scientific decision-making and
2、 democratic decision-making decision-making law. Correctly handle to ensure that government decrees and based on the actual creative work, giving full play to subjective initiative, put an end to implement the conference meeting, to document the implementation of documents etc. Improve the scientifi
3、c and democratic decision-making mechanism, improve and implement the decision to solicit the views of experts, the public hearing system. Improve the important decision of risk assessment mechanism and legal review mechanism. 3, to promote team unity. Uphold and improve the system of annual party b
4、ook talk heart to heart, mind and Party members, Party members to exchange each other not less than 2 times. The implementation of sound team democratic life system, consolidate and enhance the partys mass line educational practice will promote the achievement of the topic of democratic life, critic
5、ism and self-criticism normalization, a long-term. Adhere to the party on the basis of the principle of unity, enhance internal communication, strengthen internal supervision, self Sleep maintenance team collective image and authority. (three) to ensure the execution is not strong or disguised to re
6、sist government decrees issues. Individual Bureau leadership team members lack of learning political theory system, not from the objective reality, not with the partys interests above all the principles to deal with personal problems. In the specific work safety supervision in the execution is not s
7、trong, in the implementation of the decision to deploy the discount, make choices, engage in work, the implementation of the agreement, uncomfortable is not performed, open or disguised to resist, the lack of subject consciousness of the party organization, the lack of resist in society all kinds of
8、 bad habits and unwholesome tendencies of courage Gas and courage. Such as the liability insurance of safe production work, individual leaders that have someone arrested, and no funding, not in the global chess perspective to the countryside to carry out daily inspection, found none of my business a
9、cceptance of the resumption of production in an armchair, with a pen, indifferent. Corrective measures: (LED Leadership: Luo Mingjun, rectification time: before September 25th, insist for a long time) 1, to strengthen the sense of responsibility, work to solve the lack of decent occupation explain a
10、way, conduct problems. To establish the overall concept, eliminate departmentalism. Strict assessment and accountability, to solve the spiritual slack, nianqingpazhong, status quo, To establish and perfect the muddle along and other issues. Bureau staff conduct work regulations, standardize the beha
11、vior of personnel. 2, strengthen the responsibility system. One is the in-depth study and implement the Hunan provincial Party and government leading cadres Interim Provisions on the work safety of a pair of (Hunan Office issued 2013 No.预制梁场临时用电安全专项方案一、 工程概况: 根据合同要求,唐廊高速公路天津段一期工程二标段设置制梁场1处,梁场设在红线用地左
12、侧280米,对应里程桩号K6+100,临近马江路右侧左侧,占地面积约50亩(包括梁场建设用地和出入线用地)。制梁场承担自k3+300k10+239.635段内所有桥梁的预制梁任务,共计需预制13米先张板梁780片,20米后张板梁78片,20米小箱梁290片,混凝土总量约为12000m。二、 编制依据1、 招标文件要求。2、 唐廊高速公路天津段一期工程施工图设计。3、 天津市公路工程施工标准化技术指南。三、 供配电方式: 预制梁场配备1台315KVA变压器。从变压器下一路电源至总配电柜,再由总配电柜分配给各分配电箱,由分配电柜配给各开关箱,用电设备接线到开关箱,一台设备一个开关箱.供电方式采用三
13、相五线制TNS系统.在总配电箱及末端箱,以及超过100m的箱内做重复接地,并与保护零线可靠联接。工作零线和保护零线要严格区分,不得混用.所有机电设备的金属外壳必须与保护零线做可靠联接.四、 施工现场配电线路: 1、 架空线路必须采用绝缘铜线或绝缘铝线,并敷设在专用电杆上,不得架在树木和脚手架上。 2、 导线截面应符合下列要求:(1)导线中的负荷电流(即计算电流)不得超过其允许载流量。(2)线路末端电压降不得大于额定电压的5。 (3)单相线路零、相线截面相同,三相五线制线路,N、PE线截面不小于相线之半。(4)为满足机械强度要求,主线采用绝缘铝线截面不小于180mm2,绝.跨越公路、河流、电力线
14、路档距内的架空绝缘线分别不小于180mm2(铝线)和50mm2(铜线)。1、 架空线路的相序排列:同杆分层架设,上起为L1、L2、L3、N、PE;2、 架空线档距35m,线间距0。3m3、 架空线与邻近线或设施的距离为:4、 架空线路要采用无损伤及腐蚀的砼杆,稍径130mm,埋深为杆长的1/10-1/6,松土质应埋深或加卡盘固定。15度45度的转角杆应采用双担双瓷瓶,45度以上转角杆采用十字横担;电杆用拉线或撑杆、绝缘子应符合规范要求.5、 接户线在档距内不得有接头,进线处离地面高度不得小于2.5m。6、 配电线路用熔断器作短路保护时,熔体电流不大于电缆(或穿管绝缘线)允许电流的2.5倍或明敷
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 预制 临时 用电 方案
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【天****】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【天****】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。