建筑工程技术规范英文版TechnicalSpecifications.docx
《建筑工程技术规范英文版TechnicalSpecifications.docx》由会员分享,可在线阅读,更多相关《建筑工程技术规范英文版TechnicalSpecifications.docx(252页珍藏版)》请在咨信网上搜索。
1、Section VI - Technical SpecificationsTABLE OF CONTENTS1GENERAL PROVISIONS1-11.1FORMAT AND REFERENCING1-11.1.1FORMAT OF THE SPECIFICATIONS1-11.1.2REFERENCING1-11.2DEFINITIONS, TERMS AND ABBREVIATIONS1-21.2.1DEFINITIONS AND TERMS1-21.2.2ABBREVIATIONS1-81.3GENERAL REQUIREMENTS1-111.3.1SCOPE1-111.3.2PUB
2、LIC UTILITIES1-111.3.3ROAD INTERSECTIONS AND JUNCTIONS1-121.3.4WORKMANSHIP AND QUALITY CONTROL1-121.3.5SETTING OUT OF WORK AND PROTECTION OF BEACONS1-121.3.6NOTICES, SIGNS AND ADVERTISEMENTS1-141.3.7SUBSTANTIAL COMPLETION OF THE WORKS1-141.3.8HAUL OVER COMPLETED ROAD1-141.3.9VARIATION FROM SPECIFIED
3、 NOMINAL RATES OF APPLICATION OR NOMINAL MIX PROPORTIONS1-151.3.10CONTRACTORS ACTIVITIES IN RESPECT OF PROPERTY OUTSIDE THE SITE BOUNDARY AND PUBLIC UTILITIES MOVED, DAMAGED OR ALTERED1-151.3.11NOMINATED SUBCONTRACTORS1-171.3.12PHOTOGRAPHIC RECORDS OF CONSTRUCTION1-181.3.13INFORMATION FURNISHED BY T
4、HE EMPLOYER1-181.3.14RECORDING OF INFORMATION RELATING TO CLAIMS FOR ADDITIONAL COMPENSATION OR EXTENSION OF TIME1-181.3.15PROTECTION OF THE WORKS AND REQUIREMENTS TO BE MET BEFORE CONSTRUCTION OF NEW WORK ON TOP OF COMPLETED WORK IS COMMENCED1-191.3.16REMEDIAL WORK1-201.3.17WATER1-211.3.18ELECTRICI
5、TY SUPPLY1-211.3.19PAYMENTS AND TOLERANCES1-221.3.20DRAWINGS1-221.3.21USE OF EXPLOSIVES AND DEMOLITION1-231.3.22POSITION OF WORKS1-241.3.23ACCESS TO SITE1-241.3.24CO-OPERATION AT SITE1-241.3.25ROADS AND SITE TO BE KEPT CLEAN1-251.3.26SECURITY OF THE WORKS1-251.3.27SAFETY1-251.3.28METHOD OF WORKING1-
6、251.4CONTRACTORS ESTABLISHMENT ON SITE1-261.4.1SCOPE1-261.4.2GENERAL REQUIREMENTS1-261.4.3MEASUREMENT AND PAYMENT1-261.5ACCOMMODATION, SERVICES AND ATTENDANCE FOR THE ENGINEERS STAFF1-271.5.1SCOPE1-271.5.2OFFICE AND LABORATORY1-271.5.3HOUSING1-381.5.4SERVICES1-421.5.5GENERAL1-431.5.6VEHICLES1-431.5.
7、7RADIO EQUIPMENT1-441.5.8ATTENDANCE1-441.5.9TEMPORARY FACILITIES1-441.6ACCOMMODATION OF TRAFFIC1-461.6.1SCOPE1-461.6.2GENERAL REQUIREMENTS1-461.6.3BARRICADES AND TRAFFIC SIGNS1-471.6.4WIDTH OF TEMPORARY TRAFFIC DIVERSIONS1-481.6.5TEMPORARY DRAINAGE WORKS1-481.6.6EARTHWORKS FOR TEMPORARY TRAFFIC DIVE
8、RSIONS1-481.6.7GRAVELLING OF TEMPORARY TRAFFIC DIVERSIONS OR OF EXISTING ROADS USED AS TEMPORARY TRAFFIC DIVERSIONS1-491.6.8MAINTENANCE OF TEMPORARY TRAFFIC DIVERSIONS1-491.6.9ACCOMMODATION OF TRAFFIC WHERE THE ROAD IS CONSTRUCTED IN HALF WIDTHS1-491.6.10THE CONTRACTORS USE OF TEMPORARY TRAFFIC DIVE
9、RSIONS1-491.6.11USE OF TEMPORARY TRAFFIC DIVERSIONS BY OTHER CONTRACTORS1-501.6.12REMOVAL OF AND REINSTATEMENT OF TEMPORARY TRAFFIC DIVERSIONS1-501.7CLEARING AND GRUBBING1-511.7.1SCOPE1-511.7.2DESCRIPTION OF WORK1-511.7.3EXECUTION OF WORK1-521.8REMOVAL OF OBSTRUCTIONS AND UTILITIES1-531.8.1SCOPE1-53
10、1.8.2OBSTRUCTIONS1-531.9OVERHAUL1-561.9.1SCOPE1-561.10ENVIRONMENTAL PROTECTION AND WASTE DISPOSAL1-571.10.1SCOPE1-571.10.2ENVIRONMENTAL MANAGEMENT ACTION PLAN1-571.10.3LANDSCAPE PRESERVATION1-571.10.4TEMPORARY SOIL EROSION CONTROL1-581.10.5PRESERVATION OF TREES AND SHRUBBERY1-591.10.6PREVENTION OF W
11、ATER POLLUTION1-601.10.7ABATEMENT OF AIR POLLUTION1-611.10.8DUST ABATEMENT1-611.10.9NOISE ABATEMENT1-621.10.10LIGHT ABATEMENT1-621.10.11PRESERVATION OF HISTORICAL AND ARCHAEOLOGICAL DATA1-621.10.12PESTICIDES1-621.10.13CLEANUP AND DISPOSAL OF WASTE MATERIALS1-631.10.14MEASUREMENT AND PAYMENT1-641.11R
12、E-SURVEY AND RE-DESIGN OF THE ROAD ALIGNMENT1-661.11.1SCOPE1-661.11.2RE-SURVEY OF THE EXISTING GROUND1-661.11.3DELIVERY OF DESIGN DATA1-681.11.4PROGRAMMING FOR DESIGN1-681.11.5MEASUREMENT AND PAYMENT1-691.12SITE INVESTIGATION FOR STRUCTURAL FOUNDATIONS1-701.12.1SCOPE1-701.12.2SITE INVESTIGATION DESC
13、RIPTION1-701.12.3ROTARY CORE DRILLING1-711.12.4SAMPLING AND IN SITU TESTING1-711.12.5LABORATORY TESTING1-721.12.6BOREHOLE LOGS1-731.12.7REPORTS1-741.12.8FOUNDATION DESIGN BY THE ENGINEER1-741.13INVESTIGATION OF SECTIONS OF EXISTING BITUMINOUS PAVEMENT1-751.13.1SCOPE1-751.13.2INVESTIGATION REQUIREMEN
14、TS1-752EARTHWORKS, SUB-BASE, BASE AND SHOULDERS2-12.1BORROW MATERIALS2-12.1.1SCOPE2-12.1.2OBTAINING OF BORROW MATERIALS2-12.1.3OPENING AND WORKING BORROW PITS2-22.1.4REINSTATEMENT OF BORROW AREAS2-32.1.5DISPOSAL OF BORROW MATERIAL2-32.1.6BORROW PIT CLASSIFICATION OF GRAVEL MATERIALS FOR PAVEMENT LAY
15、ERS2-32.2PLACING AND COMPACTION OF GENERAL FILL2-42.2.1SCOPE2-42.2.2SPREADING OF MATERIALS2-42.2.3BREAKING DOWN AND PREPARATION OF THE MATERIAL2-42.2.4WATERING, DRYING AND MIXING2-42.2.5COMPACTION2-52.2.6SPECIAL REQUIREMENTS RELATING TO FILL CONSTRUCTION2-52.2.7NORMAL GRID ROLLING2-52.2.8CRUSHING AN
16、D SCREENING2-62.2.9DRAINAGE AND PROTECTION2-62.2.10DISPOSAL OF OVERSIZE MATERIAL2-62.2.11OPEN DRAINS2-62.2.12BANKS AND DIKES2-72.3NOT USED2-82.4CONSTRUCTION OF THE ROAD SUBGRADE2-92.4.1SCOPE2-92.4.2MATERIALS2-92.4.3CLASSIFICATION OF EXCAVATION2-112.4.4BREAKING DOWN OF MATERIAL USED IN CONSTRUCTION O
17、F SUBGRADE2-122.4.5CLASSIFICATION OF COMPACTION2-122.4.6STRIPPING OF TOPSOIL, CLEARING AND GRUBBING2-132.4.7CUT AND BORROW2-132.4.8FINISHING OF SLOPE2-152.4.9TREATMENT OF THE ROAD BED2-162.4.10FILL2-182.4.11SIDE FILL2-202.4.12CUT TO SPOIL2-202.4.13SELECTED SUBGRADE2-212.4.14STABILISATION: Not Used2-
18、212.4.15PROTECTION OF ROAD PRISM AND STRUCTURES2-212.4.16CONSTRUCTION TOLERANCES2-212.4.17TESTING2-222.5GRANULAR SUB-BASE2-242.5.1SCOPE2-242.5.2MATERIALS2-242.5.3CONSTRUCTION2-252.5.4CONSTRUCTION TOLERANCES2-252.5.5TESTING2-262.6CRUSHED AGGREGATE BASE2-272.6.1SCOPE2-272.6.2Not Used2-272.6.3MATERIALS
19、2-272.6.4REQUIREMENTS BEFORE CONSTRUCTING CRUSHED STONE LAYER2-282.6.5CONSTRUCTION2-292.6.6PROTECTION AND MAINTENANCE2-292.6.7CONSTRUCTION TOLERANCES2-302.6.8TESTING2-312.7GRAVEL SHOULDERS2-322.7.1SCOPE2-322.7.2MATERIALS2-322.7.3CONSTRUCTION2-322.7.4PROTECTION AND MAINTENANCE2-332.7.5CONSTRUCTION TO
20、LERANCES2-332.7.6TESTING2-332.8EXCAVATION AND BACKFILL FOR STRUCTURES2-342.8.1SCOPE2-342.8.2CLASSIFICATION OF EXCAVATION2-342.8.3DEPTH OF EXCAVATION2-342.8.4WIDTH OF EXCAVATION2-352.8.5UNSUITABLE FOUNDING CONDITIONS2-362.8.6EXCAVATION FOR EMBANKMENT CONDITIONS2-362.8.7DISPOSAL OF EXCAVATED MATERIAL2
21、-362.8.8BACKFILLING2-363BITUMINOUS CONSTRUCTION3-13.1BITUMINOUS PRIME COAT3-13.1.1SCOPE3-13.1.2MATERIAL3-13.1.3EQUIPMENT3-13.1.4WEATHER LIMITATIONS3-33.1.5PREPARATION OF THE LAYER TO BE PRIMED3-33.1.6APPLICATION OF THE PRIME COAT3-33.1.7MAINTENANCE AND OPENING TO TRAFFIC3-43.1.8TESTING3-43.2ASPHALT
22、COURSES3-53.2.1SCOPE3-53.2.2MATERIALS3-53.2.3MIX COMPOSITION3-73.2.4EQUIPMENT3-83.2.5LIMITATIONS REGARDING WEATHER AND STORAGE OF MIXED MATERIAL3-103.2.6PREPARATION OF SURFACE3-103.2.7PRODUCING AND TRANSPORTING THE MIXTURE3-113.2.8SPREADING OF MIXTURE3-123.2.9JOINTS3-123.2.10COMPACTION3-133.2.11CONS
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 建筑工程 技术规范 英文 TechnicalSpecifications
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【胜****】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【胜****】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。